Refine Your Search
 
Area Of Work
Biodiversity
Climate Change Mitigation
Community Based Adaptation
Land Degradation
Sustainable Forest Management
International Waters
Chemicals
Multifocal Area
CapDev
Operational Phase
Pilot Phase
OP6, Y3 (Jul17 - Jun 18)
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
Start Date
2018
2017
2016
2015
2014
2013
2012 and earlier
Photos
Only display projects with photos
There are 10,846 projects that match your search.
View 20 50 100 Results per page
Project Title Country Area Of Work Start
Date
Amount
(US$)
Operational Phase
Belize
Biodiversity
CapDev
Climate Change Mitigation
2017
25,000.00
OP6, Y3 (Jul17 - Jun 18)
Project Number:   BZE/SGP/OP6/Y3/CORE/CC/2017/08
This project seeks firstly, to identify the exposure and the connectivity between urban systems and actors and the marine environment to climate hazards; Secondly, to strengthen the characteristics and connectivity of such systems and actors ( ... )
Belize
Biodiversity
CapDev
Climate Change Mitigation
2017
25,000.00
OP6, Y3 (Jul17 - Jun 18)
Project Number:   BZE/OAK-PHASEII/2017/09
This project seeks firstly, to identify the exposure and the connectivity between urban systems and actors and the marine environment to climate hazards; Secondly, to strengthen the characteristics and connectivity of such systems and actors ( ... )
Grenada
Biodiversity
Climate Change Mitigation
2017
46,370.37
Phase 5
Project Number:   GRD/SGP/OP5/Y4/STAR/CC/16/19
The Community of Clozier (including Belvidere) is located in the Parish of St. John. Agriculture is the main economic activity within the community, but there has not been adequate sensitization for the farmers and the community in general of the ( ... )
Belize
Biodiversity
2017
25,000.00
Phase 6
Project Number:   BZE/SGP/OP6/Y2/CORE/BD/2017/05
This project will greatly enhance the capacity of the fishers of Copper Bank Village to adapt and participate in new management interventions that seek sustainable use of our marine resources. Furthermore, there is the need to build credibility of ( ... )
Belize
Biodiversity
2017
25,000.00
Phase 6
Project Number:   BZE/OAK-PHASEII/2017/06
This project will greatly enhance the capacity of the fishers of Copper Bank Village to adapt and participate in new management interventions that seek sustainable use of our marine resources. Furthermore, there is the need to build credibility of ( ... )
Colombia
Biodiversity
2017
49,920.00
Phase 5
Project Number:   COL/SGP/OP5/Y6/STAR/BD/2016/02
El proyecto se enfoca en desarrollar un encadenamiento productivo basado en el manejo y aprovechamiento sostenible de la palma Naidí (Euterpe oleracea) para la producción de pulpa congelada y palmitos en conserva, derivados de la misma palma. ( ... )
Lao
Biodiversity
International Waters
Chemicals
2017
50,000.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/BD/2017/34
This area will be updated once again.
Lesotho
Biodiversity
Land Degradation
2017
5,000.00
Phase 6
Project Number:   LSO/SGP/OP6/Y2/CORE/LD/2016/05
Poor range resources management practices and which include overstocking and uncontrolled fires have resulted in severe land degradation and destruction of natural and domesticated bee nests/hives. This has become a challenge for both livestock ( ... )
Argentina
Biodiversity
2017
48,162.00
Phase 6
Project Number:   ARG/SGP/OP6/Y2/CORE/2016/05
El proyecto “Capioví: Polo de Desarrollo Educativo Rural y Productivo Agropecuario – Forestal Sustentable”, tiene por objetivo adoptar medidas ambientales integrales capaces de contribuir con optimización de recursos estratégicos Suelo – ( ... )
Tanzania
Biodiversity
2017
45,849.00
Phase 6
Project Number:   TAN/SGP/OP6/Y2/STAR/BD/2017/15
Context: Lake Natron’s lesser flamingo are adapted to respond to changes in environmental conditions by moving between their sites regularly, thus they are dependent on such sites, which in East Africa are spread over four countries: Tanzania, ( ... )
Macedonia
Biodiversity
2017
21,850.00
Phase 6
Project Number:   MKD/SGP/OP6/Y2/CORE/BD/2016/02
Following the great success of the project that achieved 10 pedigry kennels of dog Sharplaninec, and great interest among the owners of sheep, goats and cattle and a large number of individual owners, NGOs and farmers (In fact, many people called ( ... )
Lao
Biodiversity
CapDev
Land Degradation
2017
50,000.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/BD/2017/38
This area will be updated once again.
Moldova
Biodiversity
2017
41,450.00
Phase 5
Project Number:   MDA/SGP/OP5/Y6/STAR/BD/2016/17
The main goal is to ensure improved living conditions of citizens in Costesti to conserve and restore the natural environment components in the locality Coste?ti, participating directly to social inclusion by acquiring qualities proactive citizens. ( ... )
Ghana
Biodiversity
2017
8,000.00
OP6, Y3 (Jul17 - Jun 18)
Project Number:   GHA/SGP/OP6/Y3/CORE/BD/2017/018
The main objective of this project is to promote biodiversity conservation and livelihood development through the adoption of climate smart cashew plantation establishment within the Senge Chichie landscape of the Black Volta Basin. The specific ( ... )
Lao
Biodiversity
Climate Change Mitigation
Land Degradation
2017
49,500.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/CC/2017/41
This area will be updated once again.
Lao
Biodiversity
Climate Change Mitigation
Land Degradation
2017
49,992.00
Phase 5
Project Number:   LAO/SGP/OP5/Y6/STAR/CC/2016/01
Communities in the Xiengme village cluster in Saysomboun Province have limited access to clean water. Gravity feed schemes in the area need to be repaired and although they can provide water it can become contaminated at the system or household ( ... )
Seychelles
Biodiversity
Climate Change Mitigation
2017
25,000.00
Phase 6
Project Number:   SEY/SGP/OP6/Y3/CORE/LSSC-AE/2017/02
This project aims to rehabilitate areas in two wetlands on South Mahe and use the large volume of invasive plant material that will be removed to generate bio-safe organic fertilizer through climate-smart aerobic composting, working with the local ( ... )
South africa
Biodiversity
2017
40,000.00
Phase 6
Project Number:   SAF/SGP/OP6/Y2/CORE/BD/17/02
Tanzania
Biodiversity
2017
36,274.00
Phase 6
Project Number:   TAN/SGP/OP6/Y2/CORE/BD/2017/11
Context: Despite the value of Mount Kilimanjaro, changes in land use patterns resulting from pressure on land and forest resources pose a great threat to the sustainability of the forest as well as socio-economic and geological functioning of the ( ... )
Eritrea
Biodiversity
2017
45,900.00
Phase 6
Project Number:   ERI/SGP/OP6/Y2/CORE/BD/2016/04
This project, Community Based Landscape Biodiversity Conservation and Protection of Endangered and Threatened Plant Species from Extinction in the landscape of Habrengeka/Wara Community is envisaged to address biodiversity conservation problems from ( ... )
View 20 50 100 Results per page