Home
Refine Your Search
Area Of Work
Operational Phase
Start Date
Photos
There are 1,138 projects that match your search.
View: 20 50 100 Results per page
Project Title Country Area Of Work Start
Date
Amount
(US$)
Operational Phase
Lao
International Waters
Land Degradation
Chemicals
2018
50,000.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/CH/2017/26
Lao
CapDev
International Waters
Chemicals
2018
50,000.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/CH/2017/25
Barbados
International Waters
2018
4,465.00
OP6 - Y3 (Jul17 - Jun 18)
Project Number:   BAR/SGP/OP5/Y4/CORE/IW/17/01
This Programme aims to make Barbados less plastic dependent by educating the population about the harm plastic waste has on sea life, animals, birds and people. This initiative also seeks to reduce overall plastic consumption while creating methods ( ... )
Benin
International Waters
2018
35,000.00
OP6 - Y3 (Jul17 - Jun 18)
Project Number:   BEN/SGP/OP6/Y3/CORE/IW/17/02
Benin
International Waters
2018
35,000.00
OP6 - Y3 (Jul17 - Jun 18)
Project Number:   BEN/SGP/OP6/Y3/CORE/IW/17/01
Congo, dem. republic
International Waters
2018
30,000.00
OP6 - Y3 (Jul17 - Jun 18)
Project Number:   DRC/SGP/OP6/Y3/STAR/IW/2018/02
Ce projet veut restaurer les massifs forestiers de la rivière Lubilanji aux environs de Ngandajika par les activités de rechargement avec les essences à croissance rapide afin de recoloniser rapidement les espaces dénudés.
Lao
International Waters
Land Degradation
Chemicals
2018
17,000.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/CH/2017/23
Timor Leste
International Waters
2017
10,000.00
Phase 6
Project Number:   TLS/SGP/OP6/Y2/CORE/IW/ 2016/09
Samoa
International Waters
2017
0.00
Phase 5
Project Number:   WSM/SGP/OP5/Y6/CORE/IW/2017/30
1. Replanting of the Papaseea river area by sliding rock. 2. Two members of each family attend one of the 3 training workshops conducted by relevant ministry on reforestation and conservation of the river 3. Completion of sign boards, flyers and ( ... )
Lesotho
Biodiversity
International Waters
Land Degradation
2017
41,607.00
OP6 - Y3 (Jul17 - Jun 18)
Project Number:   LSO/SGP/OP6/Y3/CORE/LD/2017/17
Project is a pilot to implement biological and physical rehabilitation of the rangelands of Mot?eremeli and Ramosetsana Grazing areas, allocated for utilization and management to the Mofolaneng Grazing Association through delegation from the ( ... )
Lesotho
International Waters
Land Degradation
2017
44,949.00
OP6 - Y3 (Jul17 - Jun 18)
Project Number:   LSO/SGP/OP6/Y3/CORE/LD/2017/15
Project is application of high-density grazing approach at the watershed, downstream of which are patches of wetlands whose water is demanded for irrigation on horticultural initiatives, consisting of a botanical garden, nursery, green-houses, an ( ... )
Lao
Biodiversity
International Waters
Chemicals
2017
30,000.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/BD/2017/31
Lesotho
CapDev
International Waters
Land Degradation
2017
5,000.00
Phase 6
Project Number:   LSO/SGP/OP6/Y2/CORE/2016/LD/08
Mokhotlong is a mountain district hosting one of the highest populations of wool producing sheep and goats, which makes small stock farming the mainstay of the economy of the district. Because of the rugged terrain, Mokhotlong is susceptible soil ( ... )
Kiribati
Climate Change Mitigation
International Waters
2017
35,388.00
Phase 5
Project Number:   KIR/SGP/OP/CORE/IW/2017/02
Buariki Village is located on the western end of North Tarawa. Buariki village and Betio respectively make up the far northern and western tips of the Tarawa Island, while Bonriki, Temaiku and Bikenibeu villages make up the eastern point of the ( ... )
Saint Lucia
International Waters
2017
50,000.00
Phase 5
Project Number:   STL/SGP/OP5/CORE/IW/17/12
Palmiste is one of the communities in the Soufriere Watershed where the density of population is high and where community hygiene is poor. A survey completed by the Soufriere Marine Management Association noted that Palmiste was one of the primary ( ... )
Belize
CapDev
International Waters
2017
25,000.00
Phase 6
Project Number:   BZE/SGP/OP6/Y2/CORE/CD/2016/06
This project is designed to better prepare the fishermen for smooth integration into the Managed Access program, building their understanding of the need for a more sustainable fishery, their capacity to support seascape scale management, and ( ... )
Belize
CapDev
International Waters
2017
25,000.00
Phase 6
Project Number:   BZE/OAK-PHASEII/2016/07
This project is designed to better prepare the fishermen for smooth integration into the Managed Access program, building their understanding of the need for a more sustainable fishery, their capacity to support seascape scale management, and ( ... )
Kiribati
Climate Change Mitigation
International Waters
2017
36,149.00
Phase 5
Project Number:   KIR/SGP/OP5/CORE/IW/2017/01
Buota community, as the name reflects, is a new settlement area composed of landowners whose lands have been leased to government to accommodate the South Tarawa water reserve area on Buota. Buota community are therefore settling on the outer ( ... )
Lao
Biodiversity
International Waters
Chemicals
2017
50,000.00
Phase 5
Project Number:   LAO/SGP/OP5/Y7/STAR/BD/2017/30
Ghana
Climate Change Mitigation
International Waters
2017
25,000.00
Phase 6
Project Number:   GHA/SGP/OP6/Y2/CORE/BD/2016/007
The primary objective is to promote the protection of marine ecosystem in the lower Volta basin through collaborative resource management to improve livelihood. Specific objectives are i. To restore 5 hectares of degraded ecological habitats ( ... )
View 20 50 100 Results per page