Refine Your Search
Area Of Work
Operational Phase
Start Date
Photos
There are 23,419 projects available.
View: 20 50 100 Results per page
Project Title Country Area Of Work Start
Date
Amount
(US$)
Operational Phase
Lebanon
Biodiversity
International Waters
2010
50,000.00
Phase 4
Project Number:   LEB/SGP/OP4/Y2/CORE/2009/02
Construction of waste water treatment pond in Tyr Natural Reserve. The Project aims to get rid of the waste water and transferring it into a clean material in a biological way and using electromechanically tools. Its relation to the small grants ( ... )
Guatemala
Biodiversity
Land Degradation
2010
20,184.21
Phase 4
Project Number:   GUA/SGP/OP4/CORE/10/03
El proyecto consiste en la construcci?n e implementaci?n de 39 galeras mejoradas para la estabulaci?n de animales dom?sticos, esto con el fin de evitar la presi?n sobre el bosque existente y recolectar el esti?rcol de los animales para la producci?n ( ... )
Venezuela
Climate Change Mitigation
2010
46,620.05
Phase 4
Project Number:   VEN/SGP/OP4/Y3/CORE/10/01
Generar de manera participativa dos planes de gesti?n de riesgos ambientales en las comunidades de LA ASOMADA - PUERTO NUEVO - PE?A COLORADA (APARTADEROS) y EL ROSAL ? LA PLAZUELA (SAN RAFAEL DE TABAY), localizadas en la cuenca alta del R?o Chama en ( ... )
Guatemala
Community Based Adaptation
2010
1,400.00
Phase 4
Project Number:   CBA/GUA/SPA/10/06
La idea de proyecto que tiene esta OCB consiste en unir esfuerzos para hacer terrazas como medida de conservaci?n de suelos y evitar as? p?rdida de suelo por fuertes lluvias. Tambien est?n considerando la siembra de ?rboles. Para contar con la ( ... )
Venezuela
Climate Change Mitigation
2010
8,033.92
Phase 4
Project Number:   VEN/SGP/OP4/Y3/RAF/10/18
El proyecto tiene como objetivo construir trece (13) lombricultivos (bancales de producci?n). Mediante mano de obra de autoconstrucci?n y cayapas con los integrantes del comit?. Para la cr?a de la lombriz roja californiana (Eisenia Foetida) para la ( ... )
Kyrgyzstan
Climate Change Mitigation
2010
3,300.00
Phase 4
Project Number:   KYR/SGP/OP4/Y3/CORE/2010/01
Project's main idea was to replicate a successful project of Japan International Cooperation Agency and to promote dissemination of biogas technology in the Kyrgyz Republic by overcoming barriers for i'ts spreading, by creating mechanism of ( ... )
Cape verde
Multifocal Area
2010
17,724.00
Phase 4
Project Number:   CPV/SGP/OP4/Y3/CORE/2010/11
This project aims to build a 100 m3 water tank as way to promote sustainable livelihood options for 30 farmers in Riber?o Boi and Figueira Gorda local communities, while promoting sustainable water use in agriculture. This infrastructure will also ( ... )
Cape verde
Multifocal Area
Land Degradation
2010
22,146.00
Phase 4
Project Number:   CPV/SGP/OP4/Y3/CORE/2010/17
Among other problems, water scarcity and deficiencies in water management, are the major problems, local farmers face in Matinho, Boca Larga community. Construction of a small dam will entail mobilizing roughly 3.000 m3 of water upon arrival of the ( ... )
Viet nam
Community Based Adaptation
2010
50,000.00
Phase 4
Project Number:   VN/MAP-CBA/2010/03
Cam Thanh Commune, Cam Lo District is a mountainous commune at the South bank of Hieu River. Due to the chemicals used in the war, forests were completely destroyed and all is left now are clear mountains and hills. In the area, many limestone ( ... )
Viet nam
International Waters
2010
20,000.00
Phase 4
Project Number:   VN/SGP/UNEP-SCS/10/01
Planning the network of community-based aquatic reserves in Tam Giang- Cau Hai lagoon system Thua Thien Hue Fishery ( ... )
Morocco
Biodiversity
Land Degradation
Chemicals
2010
40,151.00
Phase 4
Project Number:   MOR/SGP/OP4/Y3/CORE/2010/04
Le projet sera r?alis? dans 3 communes de la province d?Errachidia, deux situ?es sur l?oued Ghris, l?un au niveau du cercle d?Erfoud (Fezna) et l?autre au niveau du cercle du Goulmima, pr?s de Tinejdad (Ferkla). La troisi?me (Sidi Bou Abdillah) est ( ... )
Madagascar
Biodiversity
2010
7,500.00
Phase 4
Project Number:   MDG/SGP/OP4/Y3/RAF/2009/14
Assurer l?int?grit? du corridor forestier Ankeniheny ? Zahamena (CAZ) par une bonne gouvernance environnementale pour le d?veloppement durable des populations riveraines. - VOI :06 sites de for?ts g?r?s par transferts GELOSE aux VOI Augmentation ( ... )
Morocco
Biodiversity
2010
33,376.00
Phase 4
Project Number:   MOR/SGP/OP4/Y2/RAF/2009/11
Le projet a pour objectif de contribuer ? la conservation de la biodiversit? du Sibe de Tahadart ? travers le d?veloppement de l??cotourisme et l?information et la sensibilisation des acteurs locaux sur la biodiversit? du SIbe. Le projet ( ... )
Madagascar
Biodiversity
2010
20,000.00
Phase 4
Project Number:   MDG/GEF-COMPACT2/OP4/Y3/RAF/2009/10
Madagascar
Biodiversity
2010
35,000.00
Phase 4
Project Number:   MDG/SGP/OP4/Y2/RAF/2009/20
Contribution au traitement d?une probl?matique li?e aux ressources naturelles inscrite dans les priorit?s locales, r?gionales, nationales ou globales - Population locale: Population sait que le Niaouli et le Calophyllum peuvent ?tre mieux ( ... )
Madagascar
Biodiversity
2010
15,000.00
Phase 4
Project Number:   MDG/GEF-COMPACT2/OP4/Y3/RAF/2009/11
Togo
Land Degradation
2010
19,884.00
Phase 4
Project Number:   TGO/SGP/OP4/Y3/CORE/2010/11
La pr?fecture de Vo est la zone d?exploitation du phosphate au Togo et les cantons de Dagbati et de Akoumap? sont les plus concern?s. Les populations de ces cantons sont souvent d?plac?es pour exploitation du gisement et apr?s exploitation le ( ... )
Congo, dem. republic
Climate Change Mitigation
2010
25,000.00
Phase 4
Project Number:   DRC/SGP/OP4/Y3/RAF/2010/23
Ce projet consistera ? reduire l'utilisation du bois dans le sechage des produits agricoles et de p?che en diminuant la pression sur la for?t qui fournit le bois de s?chage
Madagascar
Biodiversity
2010
15,000.00
Phase 4
Project Number:   MDG/SGP/OP4/Y3/RAF/2009/17
Objectif global : La pression sur la for?t Mainty diminue, moins de 1% par an de la superficie de for?t subit une pression Objectifs sp?cifiques : 1. La pauvret? de la population diminue R?sultats attendus : 1.1. La production alimentaire ( ... )
Madagascar
Biodiversity
2010
13,500.00
Phase 4
Project Number:   MDG/SGP/OP4/Y3/RAF/2009/13
Mettre en ?uvre la restauration et le reboisement durable ? vocation communautaire et environnementale dans la zone de Lohariandava. R?sultat 1.1 Surface restaur?e - 200 ha de for?ts restaur?es R?sultat 1.2 Surface rebois?e - 40 ha de ( ... )
View 20 50 100 Results per page