There are 162 projects that match your search.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
North Macedonia
|
Chemicals
|
2012
|
25,966.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CH/11/13 |
|
According to several reports on the state of the environment provided by the Ministry of Environment, Municipality of Centre, Skopje Institute of Statistics, and others, it is considered that the household waste is a mixed with organic and inorganic ( ... )
ds, which goes to landfill Drisla unselected. The landfill has no treatment of leakage water and exhausted gases, yet. Plastic PET bottles are component of such waste, which by melting through decades or evaporation during firing the landfill, release gases called Persistent Organic Pollutants (POPs). Persistent organic pollutants are quite mobile and circulate globally with the so-called
|
|
|
North Macedonia
|
Biodiversity
|
2012
|
24,999.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/BD/11/16 |
|
In R. Macedonia, the production of bee products (honey, pollen, royal jelly, beeswax, propolis, etc..) is accomplished through breeding of more than 109769 bee colonies. Modern methods of honey bee breeding, in order to increase production, imposes ( ... )
ed for regular replacement of old and depleted queens with new and productive. This substitution is unplanned and uncontroled, were Macedonian beekeepers often purchase young queens from non-native genetic material. This primarily refers to the procurement of young queens that are not derived from native Macedonian population (Apis mellifera macedonica) of honey bees (Uzunov at al., 2009).
A
|
|
|
North Macedonia
|
Chemicals
|
2012
|
20,313.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CH/11/14 |
|
In past 20 years, use of plastic PET in product packaging has sufficiently increased which resulted with increase of this type of waste. Managing appropriately this type of waste requires existence of sustainable and efficient system for collection, ( ... )
on and recycling; high awareness of the citizens and standardized policies. Although Macedonian government has adopted the Law on packaging and waste packaging that regulates roles and responsibilities of industry, recyclers, municipalities etc, this Law is still not in the process of it?s implementation. Most of the municipalities in Macedonia has not allocated enough funding in waste management
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2012
|
24,290.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/07 |
|
A big threat and a problem of humanity is climate change and the greenhouse effect, which occurs as a result of large emissions of CO2, where a large share of emissions from burning fossil fuels. Reduction of CO2 emission means reduction of ( ... )
tion of fossil fuels, which entails a reduction in the production of electricity in thermal power station, which means that it will adversely affect the economic development of a country, which depends heavily on the energy, and at wider perspective of our everyday activities.
In Macedonia there is energy inefficiency in all domains. The concept of energy efficiency is often located in two
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2012
|
18,511.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/17 |
|
Environmental population is a global problem that we face every day. It causes high energy consumption and continuous pollution of the environment in which we live. High energy consumption is equivalent to greater emissions of greenhouse gases in ( ... )
vironment and increased pollution.
By saving energy and by using it efficiently we greate a cleaner environment, save energy resources for future generations and, of course, reduce the monthly financial budget that should be spent for electricity.
The decentralization reforms have set many new responsibilities to local authorities and the process of building capacities of all relevant
|
|
|
North Macedonia
|
Biodiversity
|
2012
|
2,411.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/BD/11/08 |
|
General objective of the project is to establish the status of the endemic fish Vrenar Zingel balcanicus (Karaman, 1937) in the rivers of Republic of Macedonia; the explore where it is located and in case it is located/determined to protect it from ( ... )
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2012
|
24,491.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/03 |
|
One of the most significant characteristics of the modern age is the absolute dominance of the oil and its derivates, as a source of energy for transport and as a fuel for all kind of mechanization. The burning of oil in the process of usage, causes ( ... )
climate changes ?greenhouse effect and emission of dangerous gases, and in case of collapse or inadequate storing / transportation ?pollution of the soil and water.
Also, the oil is a limited resource, and the increased demand of oil on the market causes growth of the prize and economy collapses.
On the other side, big part of the agricultural land in Macedonia is left unused and
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2012
|
29,533.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/11 |
|
The project will be realized in a small rural community at about 10km from the town Delcevo-v.Trabotiviste. In this village, starting from the end of 2009 until November 2010, the process of the ?Green Agenda Trabotivishte? was implemented, where ( ... )
cal community and the institutions from the municipality with coordination of the RAC Delcevo, realized the planned activities. More than 50 representatives from the local community were included in the process directly and priorities were determined upon analyzing the existing and available documentation, trends, local values and needs,
One of the priorities have been already implemented: a
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2012
|
25,002.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/04 |
|
Goce Delchev Primary School from municipality Vasilevo is a rare example of central school without energy efficiency adaptation. Such schools are notorious as huge consumers of electricity. Performing an energy efficiency project a sustainable ( ... )
for maximal energy exploitation and usage of renewable energy sources will be created. These systems are main sources for energy supply to major buildings of public interest.
This project includes activities which will increase energy efficiency of Goce Delchev Primary School in Vasilevo. The energy efficiency increase will be achieved through:
1. increasing of temperature in the classrooms
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2012
|
18,277.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/01 |
|
Observing globally, as well as locally, it is a fact that we live in a time of overusing the fossil fuels for human or economical needs and development. This is pulling the question we should ask ourselves, for how long we can depend on them. Their ( ... )
rolled exploration in a same time causes serious consequences to the environment and on the climate changes.
Republic of Macedonia has ratified the conventions and protocols for energy and energy efficiency (the Protocol from Kyoto from 2004, the Charter for energy and energy efficiency and related environmental aspects from 1998). Regardless the ratification not even one of them is totally
|
|
|
North Macedonia
|
Biodiversity
|
2012
|
16,661.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/BD/11/12 |
|
NGO ?Aronija? in the period from 2008 to 2009 has completed the project ?Let?s bring back the old types of apples and pears to our tables?. The reason why NGO want to re-create this project is the increased interest for cultivating the old types of ( ... )
and pears in the region of Pijanec and Malesevija. The increased interest is due to the successful completion of the project in the period from 2008 to 2009. (1050 apples and 350 pears were planted by 12 farmers). Currently, 95% of the plants are in good condition and NGO expect in 2011 to collect the first fruits. Also for increasing the interest in the project contributed the presentation,
|
|
|
North Macedonia
|
Biodiversity
|
2012
|
1,901.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/BD/11/05 |
|
Preliminary activities in exploring the buffalo status in different region in Macedonia, in order to protect the domestic buffalo from disappearing, to increase the capacity of local buffalo breeders and to strengthen and increase the number of ( ... )
o farms.
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2012
|
25,227.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: MKD/SGP/OP5/Y2/CORE/CC/12/04 |
|
Reduced emission of CO2 through energy efficiency measures in secondary schools Koco Racin and Dimitrija Cupovski in Veles.
With the implementation of this project, the schools will reduce the consumption of electricity and consequently reduce the ( ... )
on of CO2. Additionally, the project aims at educating and informing the general public in the municipality of Veles, and beyond, in order to increase the individual responsibility and encourage local initiatives for sustainable development.
Considering the above mentioned problems / challenges at a global, national and local level, the overall objective of the project is contributing towards
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2011
|
25,472.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/02 |
|
Municipality of Novo Selo has total number of 3900 families and 16 settlements with total number of 1280 street lights which are not economic and they are threat for the environment and in the same time very expensive for maintenance because they ( ... )
ending a lot of electricity and maybe the most important thing is that they directly influence on the climatic changes.
Because of this it is necessary to change the street lights with new environmental HIGH POWER LED lights, and these lights are environmental because they don?t contain mercury so this means that they will positively influence on the climatic changes. Also these lights will
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2011
|
26,905.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/15 |
|
The idea of this project is to replace the existing heating system in a school located in village Dvorishte - municipality of Berovo that as an energy source uses fossil fuel. Replacements will be realized by installation of system that runs on wood ( ... )
which will be produced with a commitment of members of NAPFO.
With the completion of the project directly will be reduced the CO2 emissions for 16.14 tones. The school for heating uses 6 tons of oil which shed 16.14 tons ??2. In scholl will be replace utilization of fosil fuel with wood chips which is carbon neutral thus directly will reduce the CO2 emissions.
As partners in this project
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2011
|
19,330.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/CC/11/06 |
|
Macedonia can not relay any more on the government to pay the local expanses, now they have a new and very expansive obligation to manage and pay for there own energy consumption. Macedonia has a limited source of commercial energy recourse and in ( ... )
ture they have to relay on the imported energy. There are many ways to cut down the emission of green house gasses. On the other hand for many households in Macedonia, monthly expenses for energy are taking the biggest part of the family budget after spending for food. The biggest reason for that is the lack of education of the citizens on energy savings. Also municipalities in Macedonia can not
|
|
|
North Macedonia
|
Biodiversity
|
2011
|
10,475.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MKD/SGP/OP5/CORE/BD/11/09 |
|
?Natural Monument Matka Canyon? is protected area in the vicinity of the City of Skopje. Protecting, monitoring and maintenance of natural values are the tasks of Government institutions and NGO-s. Now day situation of Biodiversity, biotopes and ( ... )
tems mast be protected and retain. One of the important goals is to prevent further damages of caves and biodiversity which inhabit them. The highest priority has the caves which are the habitats for globally threatened bats. Cave Kr?talna is situated in the territory of ?Natural Monument Matka Canyon?, in the near Cave Vrelo. It?s a very important habitat of bats. The species Schreibers? bat
|
|
|
North Macedonia
|
International Waters
|
2009
|
23,818.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: MKD/SGP/OP4/Y2/CORE/2009/11 |
|
The main goal is reduce pollution of waters of the Debar Lake and river Crn Drin (Black Drin) by organizing clean up action of 3 km along the lake shore and planting of 600 honey bearing trees (walnuts trees) thus preventing of a 2 km length of ( ... )
de erosion. The accompanied project activities include raising awareness among citizens and younger generations, changing attitudes toward nature and adopting a local policy to plant a tree for each born child which was born in the Municipality of Debar.
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2009
|
24,952.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: MKD/SGP/OP4/Y2/CORE/2009/14 |
|
This project includes activities that will contribute in the improvement of the energy efficiency in the primary school ?Kiril and Metodij? - Kocani in two areas: improvement of the ambience temperature in the classrooms followed by the decreasing ( ... )
spending of the petrol and decreasing of the spending of the electric power from the electrical light.
The Primary school ?Kiril and Metodij?- Kocani is one of the rare schools in Macedonia in which the bigger part of the heating energy derives from regenerated source like the geothermal water, and a particular smaller part comes from the traditional fuel (the heating petrol). Following the
|
|
|
North Macedonia
|
Climate Change Mitigation
|
2009
|
26,805.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: MKD/SGP/OP4/Y3/CORE/2009/23 |
|
It is the 21st century where man asks himself whether man can live forever by overcoming the problems of oil depletion and global environment, namely, whether man can obtain renewable energy in place of fossil fuel, and whether man can implement the ( ... )
es of energy efficiency and energy savings. This century asks man for the wisdom to the greatest extent ever. To overcome the problems, it is necessary to establish the energy system by the middle of this century where the renewable energy is a primary energy source and implement the principles of energy efficiency and energy savings in the every day living of the citizens.
Energy plays a
|
|
|