There are 395 projects that match your search.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Poland
|
Biodiversity
|
2003
|
46,679.00
|
Phase 2
|
Project Number: POL/03/29 |
Main goals of the project:
• Reconstruction of open meadows (sedge-bryophytes) in area of Nowy Lipsk and Jalowo island (breeding sites of valuable bird species: aquatic warbler, black grouse, and place of occurrence of rare plant associations); ( ... )
ieve this goal-scrubs and trees have to be cut and grass must be mown;
• Creation of conditions for development of environmental education and tourism (improvement of educational-tourist infrastructure thanks to building 3 look-on towers, signing of natural paths);
• Creation of partnership model of cooperation between Biebrza National Park, local communities and NGOs (including natural
|
|
Poland
|
Multifocal Area
|
2003
|
1,000.00
|
Phase 2
|
Project Number: POL/03/17p |
project preparation |
|
Poland
|
Multifocal Area
|
2003
|
50,000.00
|
Phase 2
|
Project Number: POL/03/32 |
Two contests for NGOs from villages and small towns (up to 6000 inhabitants) to fight the poverty and protect the environment |
|
Poland
|
Biodiversity
|
2003
|
1,000.00
|
Phase 2
|
Project Number: POL/03/09p |
Methodology preparation for the actions to protect the environment against the alien species - Trachemys scripta elegans. |
|
Poland
|
Biodiversity
|
2003
|
1,000.00
|
Phase 2
|
Project Number: POL/03/11p |
Protection of Green Leged Partrige- project evaluation |
|
Poland
|
Climate Change Mitigation
|
2003
|
46,791.00
|
Phase 2
|
Project Number: POL/03/23 |
A hundred years ago a narrow-gauge railway with a steam locomotive was a main transportation mean between Pisaeczno, Grojec, Gora Kalwaria , Konstancin , Warsaw suburb towns, and Warsaw, capital city.
The Grojec Narrow Gauge Railway Society from ( ... )
zno now works to restore the historical railway, with financial support from SGP/GEF.
The railway leads through the forests of Chojnowski landscape Park and serves so far as an eco-tourist attraction, with average of 8 rides per month. It is rented by companies, foreign embassies, also rides for individuals for single tickets. The Society organizes theme rides (first day of Spring, ride with
|
|
Poland
|
Biodiversity
|
2003
|
926.00
|
Phase 2
|
Project Number: POL/03/01p |
preparation of full project; visit to Przemkow Landscape Park where GEF/SGP sponsored use of biomas as energy resource (similar habitat,similar problems), also visits to Biebrza National Park, contact with Workshop for all Beings. |
|
Poland
|
Climate Change Mitigation
|
2003
|
750.00
|
Phase 2
|
Project Number: POL/03/05p |
Technical expertise (energy audit) on the renevable energy use for heating purposes in a hostel for young people;preparation of full projectst submitted to the Ecofund and GEF/SGP and Voivodship Fund.;rejected by the Ecofund and Voivodship Fund,, no ( ... )
g funds were found ;finally GEF/SGP did not
|
|
Poland
|
Climate Change Mitigation
|
2003
|
8,552.00
|
Phase 2
|
Project Number: POL/03/11 |
Modernization of local coal fired boiler plants, replacing coal boilers with biomass fired boilers; solar heating system installation- continuation of POL/02/14 in 5/2003-07/2007 |
|
Poland
|
Climate Change Mitigation
|
2003
|
8,633.00
|
Phase 2
|
Project Number: POL/03/31 |
Susz district is willing to impose a new policy in financing operational cost of schools by gradual modernisation based on renewable energy resources, local resources.
Small school in Piotrkow (monument of architecture what modernisation makes ( ... )
omplicated and careful) is a pilot project where financial engeenering will be tested as well as renewable technologies,
Savings from school in Piotrkow will be a starting point in collection of funds for next renovation in this district (over 10 schools are on the potential list).
Main aim in Piotrkow is to modernise heating system , replacement of old coal fired boiler for wood modern
|
|
Poland
|
Climate Change Mitigation
|
2003
|
12,834.00
|
Phase 2
|
Project Number: POL/03/24 |
Dramatic condition of hospital of mentally handicaped people in general, heating system in particular, based on coke. The lack of sufficient funds for hospital operations (food,medicaments),generally - a very poor condition of hospital.
The main ( ... )
the project is to stop crisis and to start up 1st stage of improvement with innovative financial mechanism.Installation of the 2 small biomass boilers(2x20KW) for hot water will replace very expensive in exploatation immersion heaters inr Social Support Center (hospital) in Lyszkowice.Installation on time, before heating season (mid-September) will allow to generate savings every month
|
|
Poland
|
Multifocal Area
|
2003
|
1,000.00
|
Phase 2
|
Project Number: POL/03/08p |
Gathering data for the full project on "Seedlings promotion to increase mountain forest's biodiversity and resistance" |
|
Poland
|
Climate Change Mitigation
|
2003
|
1,000.00
|
Phase 2
|
Project Number: POL/03/12p |
Preparation of the complex project on solar energy for small villages; identification of partners,preliminary agreements; site visits (where available and necessary);consultations on draft project,preparation of full project. |
|
Poland
|
Climate Change Mitigation
|
2003
|
50,000.00
|
Phase 2
|
Project Number: POL/03/02 |
The main of aim of the project is creation of bicycle road system connecting Plock and Wloclawek. Bicycle roads (established in area near to Vistula river, forest area in Gostynsko – Wloclawski Landscape Park and Woodland Promotional Complex of ( ... )
sko – Wloclawskie Forests) were planned to promote hiking and bicycle tourism.
Project goals:
1. creation of bicycle roads connecting Plock and Wloclawek;
2. promotion of eco-friendly transport means;
3. promotion of naturally and culturally valuable places in Gostynsko – Wloclawski Landscape Park;
4. raising awareness of local community about environmental issues, creation of
|
|
Poland
|
Biodiversity
|
2003
|
47,640.00
|
Phase 2
|
Project Number: POL/03/26 |
Inventory of existing Baltic Raised Bogs in Pomerania Lakeland. Selection worth protection stations and publication the proper protection methods among environmentalists and local administration,. |
|
Poland
|
Biodiversity
|
2003
|
611.00
|
Phase 2
|
Project Number: POL/03/03p |
The main purpose of this project was to evaluate results of the completed ,planned activities after 3 years . |
|
Poland
|
Climate Change Mitigation
|
2003
|
1,000.00
|
Phase 2
|
Project Number: POL/03/13p |
Project evaluation |
|
Poland
|
Biodiversity
|
2003
|
15,646.00
|
Phase 2
|
Project Number: POL/03/07 |
Protection of endangered amphibian species by increasing the natural breeding places and habitats |
|
Poland
|
Biodiversity
|
2003
|
9,499.00
|
Phase 2
|
Project Number: POL/03/06 |
Conservation of xerotermic grassland in Warta and Notec Valleys by creation of 2 reserves, 5-6 green lands, sheep farming introduction |
|
Poland
|
Biodiversity
|
2002
|
648.00
|
Phase 2
|
Project Number: POL/01/04p |
Project preparation - project is aimed in preaparation of coalition of NGOs and Chelmski Landscape Park, Biebrza National Park services to implement programme of aquatic warbler active protection according to the national programme established by ( ... )
nistry for Environment; consultation with all stakeholders, designing a full
|
|