There are 395 projects that match your search.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Poland
|
Biodiversity
|
2002
|
782.00
|
Phase 2
|
Project Number: POL/01/08p |
Preparation of the all Poland project of active protection of common kestrel ( Falco tinnunculus) based on the experiences / lessons learned by Salamandra from the first project stage implemented in Poznan. Wide consultation with potential ( ... )
ipants who showed interest about methodologyand all organisational, very complex issues. PTOP Salamandra took responsibility for coordination of work of several NGOs and administrative as well as research institutions which declare their contribution in active protection of this endangered small predator.
In 1960s it was the most popular small predator in rural landscape. In 1980s and 1980s
|
|
Poland
|
Biodiversity
|
2002
|
16,870.00
|
Phase 2
|
Project Number: POL/01/34 |
Upgrading habitat conditions for amphibians. Creating biotop-shaping schemes. Protection of migrating animals. Education of local society, active protection. |
|
Poland
|
Biodiversity
|
2002
|
14,868.00
|
Phase 2
|
Project Number: POL/01/30 |
Protection of especially valuable for amphibian reproduction water basins by preventing local people to use them as a trash dumps. Including water basins in local spatial management plans and local people education.
Improvement of conditions of ( ... )
uctiveness of 14 species of amphibians in Slaskie Voivodship with active participation of schools , teachers and local administration (units responsible for nature
|
|
Poland
|
Biodiversity
|
2002
|
745.00
|
Phase 2
|
Project Number: POL/02/2p |
|
|
Poland
|
Climate Change Mitigation
|
2002
|
29,777.00
|
Phase 2
|
Project Number: POL/02/19 |
Creation conditionsn for development and use of alternative local sources of energy through establishement of small plantations of fast growing willow and replacement of coal by biomas (willow chips, and wood waste in the first period of time) in ( ... )
in Barcice.
Activities undertaken:
- estabkishement of small. family willow plantation in the Lower Vistula River Valley;
- modernisation of heating system in school in Barcice (installation of a modern boiler for biomas);
- 22 field workshops with demonstration for over 200 farmers on establishement of willow plantation and management (pest control, harvest);
- seminar "Biomas as
|
|
Poland
|
Biodiversity
|
2002
|
18,738.00
|
Phase 2
|
Project Number: POL/01/36 |
Active protection of amphibians, bats and owls at the protected areas of Euro-region Niemen.
Creation of conditions enabling development of population of insects, amphibians and bats in Wigry National park, Suwalki Landscape Park and Primeval ( ... )
Romnicka landscape Park in Poland and Wiejskiej Regional Park in Lithuania.
Establishement of exchange of experiences, good practices in active nature protection between Lithuanian and Polish naturalists oranised in services of protected areas and civic organisations in border region EuroRegion
|
|
Poland
|
Climate Change Mitigation
|
2002
|
30,343.00
|
Phase 2
|
Project Number: POL/02/13 |
Creation of bicycle roads system connecting Warsaw, Plock and Wloclawek. Adaptation of the small village schools for “Green Schools” serving as educational centers and hostels for arriving tourists |
|
Poland
|
Climate Change Mitigation
|
2002
|
1,000.00
|
Phase 2
|
Project Number: POL/01/05p |
Project preparation - cost of energy audit and consultations concerning hydroponic waste water treatment plant; site visits to other places with demonstrated solutions. |
|
Poland
|
Climate Change Mitigation
|
2002
|
49,020.00
|
Phase 2
|
Project Number: POL/02/12 |
Modernization of local coal fired boiler plant – introduction of biomass heating system and building a new boiler plant at Wydminy |
|
Poland
|
Biodiversity
|
2002
|
6,888.00
|
Phase 2
|
Project Number: POL/02/01 |
The most endangered element of biodiversity in Poland is this linked to agricultural space; 68% of Poland's space (excluding protected areas on national parks, landscape parks,resrves where biodiversity is protected by law t least, and forest ( ... )
Protection of biodiversity in agricultural space is so importan especially during a dramatic changes in agricultural sector before joining EU.
Field weeds belong to the most endangered plants by definition.Until this project nothing was done for active protection of these biodiversity resources despite the existing the RED LIST of endangered species.
Project aims in establishment of
|
|
Poland
|
Climate Change Mitigation
|
2002
|
49,628.00
|
Phase 2
|
Project Number: POL/02/20 |
The main problem for bike roads is a gap between town system and country network; the most sensative, expensiveand difficult in construction is departure from the town network, linking town network to the country network.
Project is targeting a ( ... )
l element of bike road system, departuring safely from Wloclawek and linking this network to adjacent landscape parks and further - linking Wloclawek through system of bike-road passin by landscape parks with
|
|
Poland
|
Climate Change Mitigation
|
2002
|
900.00
|
Phase 2
|
Project Number: POL/02/10p |
preparation of partial energy audit for thermorenovation of a center for handicapped people and review of planned works; audit and review were completed by Mr.Jerzy Bzowski;his recommendations were negative, main factor - the gaps in ( ... )
ntation of buildings, some parts were constructed illegally, having no formal document of approval by local governmental appriopriate services;it was the groudn for rejection of project.Also the main idea and projected works did not found approval from Mr. Bzowski as not so concise and effective from ecological and financial point of
|
|
Poland
|
Climate Change Mitigation
|
2002
|
35,112.00
|
Phase 2
|
Project Number: POL/01/32 |
Coal to biomass convertion and solar collector instalation as a one heating system in 2 buildings (ambulance building and training centre (NGO meeting place for seminars,workshops). Thermal modernisation of the buildings (finally DSM instead of ( ... )
romotion of renewable energy (planned seminar for local governments after full implementation of
|
|
Poland
|
Biodiversity
|
2002
|
49,788.00
|
Phase 2
|
Project Number: POL/02/02 |
European Souslik reintroduction and protection in Opole region- habitats protection in cooperation with local community, NGO, authority and private companies |
|
Poland
|
Biodiversity
|
2002
|
8,090.00
|
Phase 2
|
Project Number: POL/02/06 |
Fauna and flora protection in Grzybów Gmina, creation of Education Center for local community and school children |
|
Poland
|
Biodiversity
|
2002
|
22,102.00
|
Phase 2
|
Project Number: POL/01/29 |
Reintroduction of the animals to the areas where they have extinct due to human actions. Creating stabile local populations. Restoration of characteristic beech wood species |
|
Poland
|
Biodiversity
|
2002
|
50,000.00
|
Phase 2
|
Project Number: POL/02/03 |
Project extension for the whole country. |
|
Poland
|
Biodiversity
|
2002
|
19,950.00
|
Phase 2
|
Project Number: POL/01/37 |
Improvement of environmental conditions of Karsiborska Kepa Reserve through regulation of water system.
- Prepared technical design of modernisation of irrigation system in Krasiborska Kepa Reserve;
- received permission from the Board of ( ... )
ation and Water Devices for renovation of flood bank and pump station;
- conservation of the main channel and construction of river wtare inlet;
- creation of conditions for acces of tourists to certain parts of Reserve.
|
|
Poland
|
Climate Change Mitigation
|
2002
|
11,414.00
|
Phase 2
|
Project Number: POL/02/18 |
Heating system modernization – biomass heating system installation instead of the coal fired boiler at the Green School- Education Center in Targonie Wielkie |
|
Poland
|
Climate Change Mitigation
|
2002
|
372.00
|
Phase 2
|
Project Number: POL/02/6p |
Planning project was devoted to initial consultation with school, managing other funds (Voivodship Fund in Bialystok, Swiss Fund) and consultancy (very preliminary energy audit). |
|