There are 27,190 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Mongolia
|
Climate Change Mitigation
|
2024
|
22,826.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CBA 3/2023/04 |
The grant aims at enabling the local population and livestock organizations to operate a micro-workshop for the production of vermicompost /compost fertilizers from animal dung and manure to improve soil fertility and nutrition in 11 sums/villages ( ... )
ereby contribute to the production of environmentally friendly fertilizers, environmentally friendly agricultural products and ultimately improve their resilience, sustainability and
|
|
Seychelles
|
Climate Change Mitigation
|
2024
|
150,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: SEY/SGP/OP7/Y4/STAR/CC/2023/44 |
The project will make a public call for action in tackling climate change and implementing activities that will divert green waste from the landfill by promoting sustainable waste management |
|
Indonesia
|
Biodiversity
|
2024
|
21,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y1/STAR/BD/24/058 |
General Goal of the Balantieng Watershed (Watershed) Initiative to become a source of sustainable learning for future generations
Specific Objective 1 Strengthening shared understanding in documenting the Balantieng Initiative
Indicator 1. ( ... )
orative networks are actively involved in monthly meetings between facilitators, implementers and the community.
2. The existence of a Collaborative Network contributes to the process of documenting the Balantieng Initiative
Activity 1. Program Socialization
2. Observe the location & progress of program activities for 10 institutions or communities
3. Documentation Workshop
4. Monthly
|
|
Mozambique
|
Climate Change Mitigation
|
2024
|
20,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: MOZ/SGP/OP7/Y5/CORE/CC/2024/10 |
|
|
Egypt
|
|
2024
|
47,606.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: EGY/SGP/OP7/Y2/CC/2024/23 |
|
|
Zambia
|
Community Based Adaptation
|
2024
|
15,602.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ZMB/SGP/OP7/Y4/CORE/GGW/2023/01 |
The Ecolife clubs aim to empower young individuals with knowledge, skills, and a deep sense of responsibility towards our planet. By fostering collaboration between generations, this innovative project creates a unique platform for sharing wisdom, ( ... )
ences, and ideas. Together, these diverse groups work hand in hand to address pressing environmental issues such as unpredictable rains, mono cropping and charcoal burning - an unsustainable practice that has led to alarming rates of deforestation in Sinazongwe
|
|
Palestine, State of
|
Climate Change Mitigation
|
2024
|
33,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: PAL/SGP/OP7/Y4/CORE/CC/2023/02 |
The worm farm will be established on a plot of land rented by the Palestinian Youth Union with an area of 600 square meters in the village of Artas/Bethlehem. Artas is characterized as an agricultural village rich in natural water sources and ( ... )
ns Tourist areas and biodiversity through Acquiring worms by supplying 5,000 Red Wigglers from reliable suppliers with high specifications. Providing a device to break down organic waste and facilitate its digestion by worms. Supplying a device for packaging the resulting compost. Establishing the complaints and feedback system for the Palestinian Youth Union. Holding a theoretical and practical
|
|
Bahamas
|
Climate Change Mitigation
|
2024
|
31,500.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: BHA/SGP/OP7/Y5/STAR/CC/2024/85 |
|
|
Indonesia
|
Biodiversity
|
2024
|
25,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y2/STAR/BD/24/069 |
|
|
Ethiopia
|
Biodiversity
|
2024
|
25,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ETH/SGP/OP7/Y4/CORE/BIA/2023/04 |
|
|
Vanuatu
|
Land Degradation
|
2024
|
20,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VUT/SGP/OP7/CORE/LD/23/15 |
The project will enhance and restore and conserve native plant species and raise seedlings for better agroforestry at the community level, to improve soil fertility in degraded landscape and increase resilience of native plants and crops to improve ( ... )
hood. The purpose of the project is to sustain and integrate management of forest, land, and marine resources through establishment of conservation and or protected areas. The Project to be Led by Youths, to empower the local youths in addressing local critical ecosystem restoration as part of cyclone recovery. Mapping out of degraded forest and highly soil eroded areas. To Developed small
|
|
Cambodia
|
Biodiversity
|
2024
|
45,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: No.LVG/2024-05 |
|
|
Tuvalu
|
Community Based Adaptation
|
2024
|
40,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TUV/SGP/OP7/CORE/CC/2024/003 |
The EKF Pastor?s Residence Water Cistern is a project that has been planned for since the impossibility of fixing up the existing old cistern. This cistern is located behind the pastor?s residence and collecting rainwater from its roof. It is of ( ... )
ize and has a capacity of approximately 30,000 litres. The EKF is seeking fund to build a new cistern which will replace the old one and thus making good use of the space rather than leaving it empty. The roof of the house is quite large and hence a bigger water catchment will be very appropriate during the rainy seasons.
Despite the location of the water cistern, this cistern will be used by
|
|
Venezuela
|
Land Degradation Land Degradation
|
2024
|
20,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VEN/SGP/OP7/Y4/STAR/LD/2023/04 |
El cacao es un cultivo autóctono de alto valor cultural y nutritivo que permite integrar las dimensiones de la sostenibilidad, además de la relevancia y pertinencia que están teniendo para contrarrestar el hambre y minimizar los daños ( ... )
tales, por tal motivo se plantea la propuesta de proyecto: EL CULTIVO DE CACAO EN SISTEMAS AGROFORESTALES (SAF) COMO MEDIO DE VIDA SOSTENIBLE Y RESTAURACION DE LOS BOSQUES DE GALERIA DE LA MICROCUENCA RIO OSPINO. Esta propuesta se enmarca en Fortalecer el cultivo de cacao en sistemas diversificados en familias periurbanas pro-moviendo variedades de cacao criollo y la protección de suelos en la
|
|
Panama
|
CapDev
|
2024
|
5,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: PAN/SGP/OP7/Y4/STAR/CD/24/28 |
|
|
Cabo verde
|
CapDev
|
2024
|
5,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: CPV/SGP/OP7/Y4/CORE/CPS/2024/01 |
|
|
Cote d'ivoire
|
Climate Change Mitigation
|
2024
|
10,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: CIV/SGP/OP7/Y4/STAR/CC/24/05 |
|
|
Venezuela
|
Land Degradation
|
2024
|
20,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VEN/SGP/OP7/Y4/STAR/LD/2024/05 |
|
|
Indonesia
|
Biodiversity
|
2024
|
20,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y1/STAR/BD/24/056 |
Increasing the role of women in protecting and preserving the Balantieng River Watershed through managing family yards and gardens
Increasing women's skills in managing family yards and gardens to meet household needs and also help preserve river ( ... )
hed areas
1. At least 100 women have knowledge about managing family yards and gardens.
2. A minimum of 100 women create a land use plan map for their yard and family garden.
3. A minimum of 100 women have basic knowledge about leadership and public communication related to the environment and conservation efforts in the Balantieng Watershed Area.
4. A minimum of 100 women can support
|
|
Lao
|
CapDev CapDev CapDev
|
2024
|
24,925.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: LAO/SGP/CBA3/2023/115 |
Takid, Dongbang and Lane village, Lao Ngam district, Saravan province are selected as target areas due to the representative of the rain-fed agricultural systems was successful experiences in mobilizing the rural community from the previous ( ... )
ts. A participatory process involved multiple stakeholders is thus proposed to understand the complexity and dynamics of climate change impacts, then hybrid knowledge will co-produce to guide the community-based adaptation. In addition, top-down approaches are also suggested to mediate and improve the impact pathways such as social capital and market linkages to address the complex problems of
|
|
Vanuatu
|
Land Degradation
|
2024
|
15,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VUT/SGP/OP7/STAR/LD/23/14 |
The Project to address coastal erosion as a result of sea level rise, using local materials and traditional knowledge and initiatives backed by modern knowledge to mitigate coastal erosion. Working with the communities of Lembal, LETI will encourage ( ... )
pation of women, men and youth in activities that will bring about the following results; Mitigated impact of coastal erosion along the coastline, restoration of plants and trees, increase knowledge on climate change and coastal erosion as well as improvement in livelihoods and increase resilient.
|
|
Nigeria
|
Land Degradation
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/LD/24/18 |
|
|
Tanzania
|
Biodiversity
|
2024
|
39,968.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/38 |
|
|
Vanuatu
|
Land Degradation
|
2024
|
23,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VUT/SGP/OP7/STAR/LD/23/17 |
Empowering local communities in integrated coastal Management and adaptation to coastal erosion and sea level rise. Local community Capacity building workshop for local communities leaders in integrated coastal management and protection of ( ... )
ves ecosystems and disaster risk reduction. Establishment of local community plan for disaster risk to coastal development and food security. Local leaders undertaking community awareness on community disaster risks reduction and climate change adaptation plan. Demonstration on Community based disaster risk reduction, ecosystem restoration and food security in the Maskelynes Islands and
|
|
Mongolia
|
Land Degradation
|
2024
|
24,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CORE/BIA/2023/03 |
This grant will empower women and promote economic development in Umnudelger village of the Khentii province with objectives that encompass a range of activities such as value-add product processing and branding, capacity development, waste ( ... )
ment, development of organic fodders, fertilizers, support for women-led businesses, utilization of animal byproducts, ultimately resulting in development of 3 end products such as 1 packaged meat and one type of fodder, 1 type of
|
|
Tanzania
|
Land Degradation
|
2024
|
50,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: TAN/SGP/OP7/Y5/CORE/GGW/2024/02 |
|
|
Mongolia
|
Climate Change Mitigation
|
2024
|
18,082.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CBA 3/2023/07 |
The is going to create a model for "NATURE-FRIENDLY" herders as a group of agro-herdsmen for adaption to climate change; |
|
Sri lanka
|
Biodiversity
|
2024
|
20,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: SRL/SGP/OP7/STAR/BD/2024/01 |
|
|
Nigeria
|
Land Degradation
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/LD/24/22 |
|
|
Bhutan
|
Community Based Adaptation
|
2024
|
20,100.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: BHU/CBA 3/2024/02 |
The proposed project in the Bumthang District prioritizes livelihood improvement, women's empowerment, and environmental sustainability. Driven by the objective of enhancing local livelihoods and addressing gender disparities, the project focuses on ( ... )
ng wood waste sawdust and agricultural waste for group-based mushroom cultivation, reducing the reliance on log cutting from forests and reusing agricultural waste. This innovative approach not only fosters economic opportunities for the community but also empowers women through their active involvement in sustainable agriculture.
The primary goal is the establishment of a Mushroom Incubation
|
|
Mozambique
|
Climate Change Mitigation
|
2024
|
19,919.36
|
OP7 Y4 (July 23-June 24)
|
Project Number: MOZ/SGP/OP7/Y4/CORE/LD/2023/08 |
|
|
Nepal
|
Climate Change Mitigation
|
2024
|
30,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NEP/SGP/OP7/Y5/IP/2024/01 |
|
|
Mozambique
|
Biodiversity
|
2024
|
19,980.38
|
OP5 - Y2 (Jul 12 – Jun 13)
|
Project Number: MOZ/SGP/OP7/Y5/CORE/BD/2024/13 |
|
|
Nepal
|
Climate Change Mitigation
|
2024
|
35,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NEP/SGP/OP7/Y5/IP/2024/02 |
|
|
Ethiopia
|
Biodiversity
|
2024
|
23,135.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ETH/SGP/OP7/Y4/CORE/BIA/2023/01 |
|
|
Grenada
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: GRD/SGP/OP7/Y5/STAR/BD/23/09 |
|
|
Mexico
|
Climate Change Mitigation
|
2024
|
5,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: MEX/SGP/OP7/Y3/STAR/CC/2024/119 |
|
|
Mexico
|
Climate Change Mitigation
|
2024
|
42,200.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y2/STAR/CC/2023/114 |
La generación de energía sostenible solar y eficiencia energética en 10 centros de trabajo de productores y prestadores de servicio de la comunidad de Isla Arena Campeche en la Reserva de la biósfera Ría Celestún como medida ante el cambio ( ... )
tico y mejora de los medios de vida de 50 hombres y 50 mujeres las cuales participamos en todas las actividades que se realizarán durante el proyecto.
|
|
Timor-Leste
|
Land Degradation
|
2024
|
20,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TLS/SGP/OP7/Y5/CORE/LD/2023/35 |
|
|
Mexico
|
Climate Change Mitigation
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y2/STAR/CC/2023/110 |
Mejorar las condiciones de la cooperativa en la cadena de valor a través de un proyecto integral sustentable de desarrollo de capacidades internas, inclusión y empoderamiento de las mujeres y fortalecimiento de la gestión democrática para ( ... )
entar un sistema de producción de hielo
|
|
Tanzania
|
Biodiversity
|
2024
|
31,975.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/33 |
|
|
Tanzania
|
Biodiversity
|
2024
|
47,423.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/06 |
Engaging local communities to promote conservation of Ruaha catchment area along the great Ruaha River in Mbarali and Makete Districts |
|
Nepal
|
Land Degradation
|
2024
|
30,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NEP/SGP/OP7/Y4/CORE/BIA/2024/01 |
The project will based on enhancing agri-food production and value chains to increase resilience mountain communities which includes managing degraded/barren land to increase production of mountain produces, improved competitiveness of the products ( ... )
e by mountain women small farmers cooperative for sustainable business and income.
|
|
Dominica
|
Biodiversity
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: DMA/SGP/OP7/Y4/CORE/BD/2024/01 |
. Project Name: Enhancing Biodiversity and food security and improving ecosystem health in the Castle Bruce district through Apiculture.
Project number: DMA/SGP/OP7/Y4/CORE/BD/2024/01
Applicant: Anse Kouanari Tourism Association Inc. (AKTA) ( ... )
rall objective/activities to be implemented under the grant: To increase Biodiversity conservation practices in the district.
Objectives: 1. To engage local communities in the district in the practice of sustainable apiculture to increase bee population. 2. To increase opportunities for alternative livelihoods and food security through apiculture. 3. To train at least 20 people in basic
|
|
Tanzania
|
Biodiversity
|
2024
|
27,978.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/34 |
|
|
Tuvalu
|
Community Based Adaptation
|
2024
|
40,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TUV/CBA3/2024/001 |
This project is aimed to alleviate the problem of low-income farmers in the Lofeagi-northern district. Its is anticipated that the project will have two major component of production which are two standard farms a 64 square meter farm for vegetable ( ... )
tion for 23 households and another 100 square meters of a vanilla for each of the 23 household as well. So, in the end, each of the twenty-three household of the targeted beneficiaries will each have a Vegetable standard far and a standard vanilla farm.
Altogether these two farms from all the 23 households in any one productive year can produce 30 tones of cabbages valued at the current price of
|
|
Nepal
|
Climate Change Mitigation
|
2024
|
45,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NEP/SGP/OP7/Y4/CORE/BIA/2024/04 |
The project is based on enhancing climate resilience, promoting climate change mitigation, and generating income through community reforestation, climate resilient agriculture & agroforestry, creation of biodiversity positive value-chains in the ( ... )
and Samagaun villages of Gorkha, Nepal which included developing climate resilience and mitigation for sustainable resource management to protect ecosystem and empowering communities.
|
|
Kenya
|
Land Degradation
|
2024
|
30,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: KEN/SGP/OP7/Y1/STAR/BD/24/02 |
|
|
Tanzania
|
Biodiversity
|
2024
|
49,990.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/17 |
Introduction
Southern Tanzania Elephant Program (STEP) proposes a community-based project that will conserve the threatened elephant population of the Udzungwa-Nyerere ecosystem, as well as reduce poverty, improve livelihoods and enhance social ( ... )
ion in communities affected by human-elephant conflict. The project will achieve these goals by building the capacity of farmers to implement methods that protect farms from elephant damage and increase community resilience through Village Savings and Loans Associations (VSLAs) and targeted outreach with farmers. The project will also test novel and innovative crop protection measures and develop
|
|
Kenya
|
Land Degradation
|
2024
|
16,343.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: KEN/SGP/OP7/Y2/STAR/LD/24/04 |
|
|
Nigeria
|
Chemicals
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/CH/24/29 |
|
|
Sri lanka
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: SRL/SGP/OP7/STAR/BD/2024/02 |
|
|
Maldives
|
Climate Change Mitigation
|
2024
|
29,963.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: MDV/CBA3/2024/04 |
The Kudarikulu project targets a small island with 90 households facing food insecurity due to insufficient fruit and vegetable crops, linked to degraded green spaces and poor farming practices. To address this, the project focuses on enhancing crop ( ... )
ion, improving soil and land management, and providing training to farmers. The anticipated outcomes include increased availability of fresh produce, improving nutrition and income for women and youth. The project aims to supply fruit and vegetable crops to all 90 households and train 30 to 40 farmers, with a focus on empowering women by ensuring their representation among
|
|
Belize
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: BZE/SGP/OP7/Y4/CORE/BD/2024/01 |
The goal of the project is in line with our five-year management plan prepared in 2021 The goal is to strengthen the administrative and operational capacity of Itzamna Society to manage the Elijio Panti National Park effectively. This goal will be ( ... )
ed by investing in key activities to enhance administrative and operational functions as a co-manager. The Itzamna Society also seeks to build its financial position for its conservation endeavors. Itzamna plans to accomplish this by promoting ecotourism activities that focus on sustainability within the park and improving the visitor center's infrastructure, thus enhancing the visitor?s
|
|
Viet nam
|
Biodiversity
|
2024
|
5,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VNM/COMDEKS-4/2024/04/p |
|
|
Tanzania
|
Biodiversity
|
2024
|
36,336.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/11 |
Enhancing mangrove ecosystem conservation and livelihoods through mangrove forest restoration and rehabilitation and beekeeping in Pembamnazi Ward Dar es salaam Region |
|
Vanuatu
|
Community Based Adaptation
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VUT/CBA 3/23/02 |
The project aims to address the issue of diversity of crops and unsustainable farming practices in Vanmel area in Central and East Pentecost. The Project will align its activities according to the community?s adaptation plan, to collect and plant ( ... )
c crops as well as conduct awareness and training to the
|
|
Viet nam
|
Biodiversity
|
2024
|
2,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VNM/SGP/OP7/Y3/CORE/2023/08/p |
The grant is to promulagate a new project being "Enhancing the capacity of CBOs for economic development based on community internal resources to protect and restore ecosystems and preserve and promote traditional cultureal values of ethnic groups ( ... )
ated with OCOP, brocade, medicinal products and community
|
|
Kazakhstan
|
CapDev
|
2024
|
28,444.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: KAZ/SGP/OP7/Y1/STAR/CB/24/01 |
|
|
Nigeria
|
Biodiversity
|
2024
|
30,000.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: NGA/SGP/OP7/Y3/CORE/BD/22/09 |
The project "Enhancing the Conservation Capacity of Encephalartos Barteri ssp. Allochrous in Kwanka, Plateau State" is a comprehensive initiative aimed at preserving the endangered Encephalartos Barteri ssp. Allochrous in its natural habitat. The ( ... )
s faces threats such as habitat loss and unsustainable trade, making conservation efforts critical. The project's core objectives include empowering local communities in the Kwanka region with the knowledge and skills needed to conserve Encephalartos Barteri ssp. Allochrous populations in situ. It also seeks to establish the capacity for seed collection and conservation in community nurseries,
|
|
Nigeria
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/BD/24/21 |
|
|
India
|
Land Degradation
|
2024
|
47,856.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: IND/SGP/OP7/Y4/CORE/LD/2023/22 |
|
|
Mongolia
|
Land Degradation
|
2024
|
15,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CORE/BIA/2023/06 |
The grant will promote sustainable pastoral agriculture and support the livelihoods of local Karatau community, where the combination of traditional knowledge, state regulations, and community-based natural resource management will be a powerful ( ... )
ch to address the challenges of climate change and land
|
|
Ethiopia
|
Biodiversity
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ETH/SGP/OP7/Y4/CORE/BIA/2023/05 |
|
|
India
|
Climate Change Mitigation
|
2024
|
29,696.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: IND/SGP/OP7/Y4/CORE/CC/2023/28 |
The project proposal to be implernented for benefit of community and biodiversi$
conservation where a contribute can get for global environment- Our Projec{
objective to conserve indigenous medicinal plants and afforstration on the waste
land ( ... )
ed agricultural land of the household of the community in the proposed
area" So we have to support the medicinal plants, tool and equipments, fencing
and financial support fon labour etc. For these activities through the project the
community persons will be benefitted and their income will be raised.
The following outcomes may be found:
1. lndigenous Plants will be conserved
?. About 100
|
|
Eritrea
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: ERI/SGP/OP7/Y4/STAR/BD/2024/22 |
|
|
Uganda
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: UGA/SGP/OP7/Y4/STAR/BD/2023/18 |
To promote ago-ecological livelihoods through implementation of catchment management innovations for sustainable agriculture, fisheries, and livestock production among lake-shore settlements. |
|
Uruguay
|
Biodiversity
|
2024
|
30,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: URY/SGP/OP7/Y4/CORE/BD/2024/01 |
|
|
Timor-Leste
|
Climate Change Mitigation
|
2024
|
10,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: TLS/SGP/OP7/Y5/CORE/CC/2023/27 |
|
|
Timor-Leste
|
Climate Change Mitigation
|
2024
|
10,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TLS/SGP/OP7/Y5/CORE/CC/2023/31 |
|
|
Indonesia
|
Biodiversity
|
2024
|
17,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y1/STAR/BD/24/052 |
|
|
Uzbekistan
|
Chemicals
|
2024
|
2,650.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: UZB/SGP/OP7/Y4/CORE/CH/2024/16p |
The project aims to reduce plastic consumption through the creation of a socially significant environmental platform for manufacturers of products made from local natural materials such as horns, bones and wool. |
|
Fiji
|
Biodiversity
|
2024
|
30,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: FJI/SGP/OP7/Y4/CORE/BIA/2023/03 |
|
|
Saint Kitts and Nevis
|
CapDev
|
2024
|
116,900.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: STK/SGP/OP7/CORE/23/04 |
Given its mission to educate and skill the citizens of St. Kitts and Nevis (SKN), the Clarence Fitzroy Bryant College (CFBC) has committed to forming a partnership with Green Solutions International (GIS). The objective is to establish and manage a ( ... )
ribbean Center of Excellence focused on applied research, innovation, and workforce training for solar photovoltaic technologies and electric vehicle systems. This center will be located at the CFBC. This strategic alliance is designed to ensure that CFBC positions itself effectively in alignment with the government's green and diversified economic
|
|
Kenya
|
Biodiversity
|
2024
|
15,279.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: KEN/SGP/OP7/Y2/STAR/BD/24/05 |
|
|
Ghana
|
Biodiversity
|
2024
|
25,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: GHA/COMDEKS-4/2024/06 |
3. Project Objectives, Results/Outputs, and Activities
3.1 Primary Project Objectives
3.1.1To further demonstrate the profitability of nature conservation and sustainable business based on nature conservation, using value addition to bee ( ... )
ts
3.1.2 To construct a building and equip it with processing machines
3.1.3 To collect and process 50 metric tons of honey annually
3.1.4 To create jobs estimated at 500 along the bee value chain
3.2 Project Results
3.2.1 Extensive education and publicity about the project among the beekeeping community carried out
3.2.2 A building constructed and equipped with honey processing
|
|
Tanzania
|
Biodiversity
|
2024
|
47,533.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/02 |
Establishment Of Biogas Digesters to produce gas For cooking in Nduoni Village, Moshi Rural District Kilimanjaro |
|
Mexico
|
Climate Change Mitigation
|
2024
|
44,500.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y2/STAR/CC/2023/94 |
El proyecto tiene como objetivo principal agregar valor insitu a la maderas nativas que produce el manejo forestal comunitario con certificado FM-FSC en Quintana Roo, a través del establecimiento de una batería de estufas de secado con capacidad ( ... )
000 pies tablas mensuales de maderas duras tropicales, para este fin se adapta tecnologías de secado solar y equipo de secado (deshumificador y ventiladores) alimentados con energía eléctrica de paneles solares para reducir los costos de secado, disminuir el impacto de la industria forestal al cambio climático; así como fortalecer el desarrollo de las carpinterías familiares,
|
|
Mongolia
|
Climate Change Mitigation
|
2024
|
17,045.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CBA 3/2023/08 |
The grant will build a small dam to collect snow and rainwater at the site of natural formations along the mouth of a high mountain to create a pond to store drinking water for wild animals and livestock, as well as to fence the main sources of the ( ... )
River and plant willows and fruit trees where possible to increase surface water
|
|
Indonesia
|
Biodiversity
|
2024
|
18,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: INS/SGP/OP7/Y2/STAR/BD/24/063 |
|
|
Grenada
|
Land Degradation
|
2024
|
50,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: GRD/SGP/OP7/Y5/STAR/LD/23/07 |
To establish a climate smart school farm utilizing smart practices in turn to supply the kitchen with produce that will be used as part of the school feeding program.
|
|
Kenya
|
Biodiversity
|
2024
|
122,240.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: KEN/SGP/OP7/Y1/STAR/BD/23/02 |
|
|
Zambia
|
Chemicals
|
2024
|
25,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ZMB/SGP/OP7/Y4/CORE/CW/2023/04 |
The project aims at processing feathers (as an income generating activity) into finished products such as pillows and duvets. Chicken feathers are usually burnt or thrown away, contributing to reduction of carbon emission. By processing the ( ... )
rs, the project will thus be contributing to waste management at community level and improve the livelihood of the
|
|
South africa
|
Biodiversity
|
2024
|
37,500.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: SAF/SGP/OP7/Y4/CORE/GGW/2024/05 |
|
|
Cambodia
|
Biodiversity
|
2024
|
45,730.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: KHM/SGP/OP7/Y4/CORE/BD/2023/01 |
The project aims to provide support to 4 Community Forestry (CF) to develop a 15-year Community Forestry Management Plan according to Forestry Administration (FA/MAFF) guidelines which contribute to the sustainable use and management of 1,398 ha of ( ... )
areas under the four CF management. In addition to that, the project supports digging 4,000 m of CF boundary canal, conducting regular CF patrolling, planting 1,600 small trees, and implementing forest thinning techniques around 20 ha of CF areas to improve forest growing quality. To improve the livelihood of 1,950 households, the project will provide training on pig and fish raising and provide
|
|
Barbados
|
Land Degradation
|
2024
|
45,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: BAR/SGP/OP7/Y4/LD/CORE/24/03 |
|
|
Botswana
|
Biodiversity
|
2024
|
4,979.01
|
OP7 Y6 (July 25-June 26)
|
Project Number: BOT/SGP/OP7/Y4/CORE/BD/2023/33 |
The idea of establishing a community development trust was launched on February 2022 by all ward development committees in Jwaneng and community members. The organization will works with communities across three main program areas: ebvironmental ( ... )
ion and outreach, natural resource protection, and research and monitoring. The trust further intends to develop and educate Jwaneng Community into a commercial central marketing set up through sensitizing them about their environment and organizing them around their intended projects to establish practical ownership of their production methods, and also to create sustainable lives in Jwaneng
|
|
Mexico
|
Biodiversity
|
2024
|
27,900.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y2/STAR/BD/2023/98 |
|
|
Guatemala
|
Biodiversity
|
2024
|
49,312.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: GUA/SGP/OP7/Y4/CORE/2023/17 |
La ASODILL ha venido contribuyendo en la organización e impulso del desarrollo de la comunidad, desde hace varios años atrás ha venido desarrollando la conservación de la biodiversidad y promoviendo el turismo comunitario por ello busca ( ... )
s de de este proyecto: Consolidar el modelo de Turismo comunitario para la conservación de la biodiversidad en Aldea Loma Linda, este tendra como finalidad, la participacion activa de las familias en la prestación de los servicios turisticos de calidad lo que contribuye a la conservación de la biodiversidad, la generación de ingresos y empleo. Esto podrá ser posible mediante procesos de
|
|
Mexico
|
Biodiversity
|
2024
|
29,287.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y1/TNC/2023/116 |
Ofertar servicios ecoturísticos y de turismo comunitario, mediante el establecimiento de un comedor y una cabaña múltiple construidos con materiales de la región (Madera, adobe y piedra), en un área de 10 ha en el paraje denominado la pobreza, ( ... )
ejorar las condiciones de vida y como fuente de ingresos económicos de 6 mujeres emprendedoras y sus familias
|
|
Mexico
|
Biodiversity
|
2024
|
46,500.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y2/STAR/BD/2023/95 |
|
|
Uruguay
|
CapDev
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: URY/SGP/OP7/Y4/CORE/CD/2024/03 |
|
|
Venezuela
|
Biodiversity
|
2024
|
30,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VEN/SGP/OP7/Y4/STAR/BD/2024/03 |
|
|
Panama
|
Biodiversity
|
2024
|
36,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: PAN/SGP/OP7/Y4/STAR/BD/24/27 |
|
|
Bolivia
|
Biodiversity
|
2024
|
50,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: BOL/SGP/OP7/Y2/FSP/BD/23/22 |
|
|
Mexico
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y1/TNC/2023/117 |
Contribuir a la conservación de la biodiversidad mediante la implementación de buenas prácticas en el proceso de apicultura logrando la certificación orgánica de 178.8 toneladas de miel para atender la demanda del mercado europeo, mejorando los ( ... )
de vida de 112 personas productoras de miel de las cuales 94 son hombres y 18 son mujeres en la comunidad de Putla Villa de Guerrero,
|
|
Colombia
|
CapDev
|
2024
|
80,500.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: COL/SGP/OP7/Y5/STAR/CD/2024/01 |
|
|
Palestine, State of
|
Chemicals
|
2024
|
40,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: PAL/SGP/OP7/Y4/CORE/Ch/2024/08 |
The project aims to promote green entrepreneurship and women's empowerment through the recycling of Waste of Electrical and Electronic Equipment (WEEE), through gaining 20 Female engineer graduates? expertise in WEEE recycling, entrepreneurship, and ( ... )
able business administration. Establishing electronic waste collection and sorting facility in Jenin area. Increasing economic opportunities for female engineer graduates. And increasing community support and awareness of the women-led Waste of Electrical and Electronic Equipment (WEEE)
|
|
Nauru
|
Climate Change Mitigation
|
2024
|
11,981.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NAU/SGP/OP7/CORE/CC/2023/13 |
|
|
Eritrea
|
Land Degradation
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ERI/SGP/OP7/Y4/STAR/LD/2024/23 |
|
|