There are 27,190 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Mongolia
|
Climate Change Mitigation
|
2024
|
22,826.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CBA 3/2023/04 |
The grant aims at enabling the local population and livestock organizations to operate a micro-workshop for the production of vermicompost /compost fertilizers from animal dung and manure to improve soil fertility and nutrition in 11 sums/villages ( ... )
ereby contribute to the production of environmentally friendly fertilizers, environmentally friendly agricultural products and ultimately improve their resilience, sustainability and
|
|
Seychelles
|
Climate Change Mitigation
|
2024
|
150,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: SEY/SGP/OP7/Y4/STAR/CC/2023/44 |
The project will make a public call for action in tackling climate change and implementing activities that will divert green waste from the landfill by promoting sustainable waste management |
|
Indonesia
|
Biodiversity
|
2024
|
21,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y1/STAR/BD/24/058 |
General Goal of the Balantieng Watershed (Watershed) Initiative to become a source of sustainable learning for future generations
Specific Objective 1 Strengthening shared understanding in documenting the Balantieng Initiative
Indicator 1. ( ... )
orative networks are actively involved in monthly meetings between facilitators, implementers and the community.
2. The existence of a Collaborative Network contributes to the process of documenting the Balantieng Initiative
Activity 1. Program Socialization
2. Observe the location & progress of program activities for 10 institutions or communities
3. Documentation Workshop
4. Monthly
|
|
Mozambique
|
Climate Change Mitigation
|
2024
|
20,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: MOZ/SGP/OP7/Y5/CORE/CC/2024/10 |
|
|
Egypt
|
|
2024
|
47,606.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: EGY/SGP/OP7/Y2/CC/2024/23 |
|
|
Zambia
|
Community Based Adaptation
|
2024
|
15,602.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ZMB/SGP/OP7/Y4/CORE/GGW/2023/01 |
The Ecolife clubs aim to empower young individuals with knowledge, skills, and a deep sense of responsibility towards our planet. By fostering collaboration between generations, this innovative project creates a unique platform for sharing wisdom, ( ... )
ences, and ideas. Together, these diverse groups work hand in hand to address pressing environmental issues such as unpredictable rains, mono cropping and charcoal burning - an unsustainable practice that has led to alarming rates of deforestation in Sinazongwe
|
|
Palestine, State of
|
Climate Change Mitigation
|
2024
|
33,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: PAL/SGP/OP7/Y4/CORE/CC/2023/02 |
The worm farm will be established on a plot of land rented by the Palestinian Youth Union with an area of 600 square meters in the village of Artas/Bethlehem. Artas is characterized as an agricultural village rich in natural water sources and ( ... )
ns Tourist areas and biodiversity through Acquiring worms by supplying 5,000 Red Wigglers from reliable suppliers with high specifications. Providing a device to break down organic waste and facilitate its digestion by worms. Supplying a device for packaging the resulting compost. Establishing the complaints and feedback system for the Palestinian Youth Union. Holding a theoretical and practical
|
|
Bahamas
|
Climate Change Mitigation
|
2024
|
31,500.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: BHA/SGP/OP7/Y5/STAR/CC/2024/85 |
|
|
Indonesia
|
Biodiversity
|
2024
|
25,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y2/STAR/BD/24/069 |
|
|
Ethiopia
|
Biodiversity
|
2024
|
25,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ETH/SGP/OP7/Y4/CORE/BIA/2023/04 |
|
|
Vanuatu
|
Land Degradation
|
2024
|
20,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VUT/SGP/OP7/CORE/LD/23/15 |
The project will enhance and restore and conserve native plant species and raise seedlings for better agroforestry at the community level, to improve soil fertility in degraded landscape and increase resilience of native plants and crops to improve ( ... )
hood. The purpose of the project is to sustain and integrate management of forest, land, and marine resources through establishment of conservation and or protected areas. The Project to be Led by Youths, to empower the local youths in addressing local critical ecosystem restoration as part of cyclone recovery. Mapping out of degraded forest and highly soil eroded areas. To Developed small
|
|
Cambodia
|
Biodiversity
|
2024
|
45,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: No.LVG/2024-05 |
|
|
Tuvalu
|
Community Based Adaptation
|
2024
|
40,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TUV/SGP/OP7/CORE/CC/2024/003 |
The EKF Pastor?s Residence Water Cistern is a project that has been planned for since the impossibility of fixing up the existing old cistern. This cistern is located behind the pastor?s residence and collecting rainwater from its roof. It is of ( ... )
ize and has a capacity of approximately 30,000 litres. The EKF is seeking fund to build a new cistern which will replace the old one and thus making good use of the space rather than leaving it empty. The roof of the house is quite large and hence a bigger water catchment will be very appropriate during the rainy seasons.
Despite the location of the water cistern, this cistern will be used by
|
|
Venezuela
|
Land Degradation Land Degradation
|
2024
|
20,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: VEN/SGP/OP7/Y4/STAR/LD/2023/04 |
El cacao es un cultivo autóctono de alto valor cultural y nutritivo que permite integrar las dimensiones de la sostenibilidad, además de la relevancia y pertinencia que están teniendo para contrarrestar el hambre y minimizar los daños ( ... )
tales, por tal motivo se plantea la propuesta de proyecto: EL CULTIVO DE CACAO EN SISTEMAS AGROFORESTALES (SAF) COMO MEDIO DE VIDA SOSTENIBLE Y RESTAURACION DE LOS BOSQUES DE GALERIA DE LA MICROCUENCA RIO OSPINO. Esta propuesta se enmarca en Fortalecer el cultivo de cacao en sistemas diversificados en familias periurbanas pro-moviendo variedades de cacao criollo y la protección de suelos en la
|
|
Panama
|
CapDev
|
2024
|
5,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: PAN/SGP/OP7/Y4/STAR/CD/24/28 |
|
|
Cabo verde
|
CapDev
|
2024
|
5,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: CPV/SGP/OP7/Y4/CORE/CPS/2024/01 |
|
|
Cote d'ivoire
|
Climate Change Mitigation
|
2024
|
10,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: CIV/SGP/OP7/Y4/STAR/CC/24/05 |
|
|
Venezuela
|
Land Degradation
|
2024
|
20,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VEN/SGP/OP7/Y4/STAR/LD/2024/05 |
|
|
Indonesia
|
Biodiversity
|
2024
|
20,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y1/STAR/BD/24/056 |
Increasing the role of women in protecting and preserving the Balantieng River Watershed through managing family yards and gardens
Increasing women's skills in managing family yards and gardens to meet household needs and also help preserve river ( ... )
hed areas
1. At least 100 women have knowledge about managing family yards and gardens.
2. A minimum of 100 women create a land use plan map for their yard and family garden.
3. A minimum of 100 women have basic knowledge about leadership and public communication related to the environment and conservation efforts in the Balantieng Watershed Area.
4. A minimum of 100 women can support
|
|
Lao
|
CapDev CapDev CapDev
|
2024
|
24,925.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: LAO/SGP/CBA3/2023/115 |
Takid, Dongbang and Lane village, Lao Ngam district, Saravan province are selected as target areas due to the representative of the rain-fed agricultural systems was successful experiences in mobilizing the rural community from the previous ( ... )
ts. A participatory process involved multiple stakeholders is thus proposed to understand the complexity and dynamics of climate change impacts, then hybrid knowledge will co-produce to guide the community-based adaptation. In addition, top-down approaches are also suggested to mediate and improve the impact pathways such as social capital and market linkages to address the complex problems of
|
|
Vanuatu
|
Land Degradation
|
2024
|
15,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VUT/SGP/OP7/STAR/LD/23/14 |
The Project to address coastal erosion as a result of sea level rise, using local materials and traditional knowledge and initiatives backed by modern knowledge to mitigate coastal erosion. Working with the communities of Lembal, LETI will encourage ( ... )
pation of women, men and youth in activities that will bring about the following results; Mitigated impact of coastal erosion along the coastline, restoration of plants and trees, increase knowledge on climate change and coastal erosion as well as improvement in livelihoods and increase resilient.
|
|
Nigeria
|
Land Degradation
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/LD/24/18 |
|
|
Tanzania
|
Biodiversity
|
2024
|
39,968.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/38 |
|
|
Vanuatu
|
Land Degradation
|
2024
|
23,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: VUT/SGP/OP7/STAR/LD/23/17 |
Empowering local communities in integrated coastal Management and adaptation to coastal erosion and sea level rise. Local community Capacity building workshop for local communities leaders in integrated coastal management and protection of ( ... )
ves ecosystems and disaster risk reduction. Establishment of local community plan for disaster risk to coastal development and food security. Local leaders undertaking community awareness on community disaster risks reduction and climate change adaptation plan. Demonstration on Community based disaster risk reduction, ecosystem restoration and food security in the Maskelynes Islands and
|
|
Mongolia
|
Land Degradation
|
2024
|
24,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CORE/BIA/2023/03 |
This grant will empower women and promote economic development in Umnudelger village of the Khentii province with objectives that encompass a range of activities such as value-add product processing and branding, capacity development, waste ( ... )
ment, development of organic fodders, fertilizers, support for women-led businesses, utilization of animal byproducts, ultimately resulting in development of 3 end products such as 1 packaged meat and one type of fodder, 1 type of
|
|
Tanzania
|
Land Degradation
|
2024
|
50,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: TAN/SGP/OP7/Y5/CORE/GGW/2024/02 |
|
|
Mongolia
|
Climate Change Mitigation
|
2024
|
18,082.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MON/SGP/OP7/Y4/CBA 3/2023/07 |
The is going to create a model for "NATURE-FRIENDLY" herders as a group of agro-herdsmen for adaption to climate change; |
|
Sri lanka
|
Biodiversity
|
2024
|
20,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: SRL/SGP/OP7/STAR/BD/2024/01 |
|
|
Nigeria
|
Land Degradation
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NGA/SGP/OP7/Y4/STAR/LD/24/22 |
|
|
Bhutan
|
Community Based Adaptation
|
2024
|
20,100.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: BHU/CBA 3/2024/02 |
The proposed project in the Bumthang District prioritizes livelihood improvement, women's empowerment, and environmental sustainability. Driven by the objective of enhancing local livelihoods and addressing gender disparities, the project focuses on ( ... )
ng wood waste sawdust and agricultural waste for group-based mushroom cultivation, reducing the reliance on log cutting from forests and reusing agricultural waste. This innovative approach not only fosters economic opportunities for the community but also empowers women through their active involvement in sustainable agriculture.
The primary goal is the establishment of a Mushroom Incubation
|
|
Mozambique
|
Climate Change Mitigation
|
2024
|
19,919.36
|
OP7 Y4 (July 23-June 24)
|
Project Number: MOZ/SGP/OP7/Y4/CORE/LD/2023/08 |
|
|
Nepal
|
Climate Change Mitigation
|
2024
|
30,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NEP/SGP/OP7/Y5/IP/2024/01 |
|
|
Mozambique
|
Biodiversity
|
2024
|
19,980.38
|
OP5 - Y2 (Jul 12 – Jun 13)
|
Project Number: MOZ/SGP/OP7/Y5/CORE/BD/2024/13 |
|
|
Nepal
|
Climate Change Mitigation
|
2024
|
35,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: NEP/SGP/OP7/Y5/IP/2024/02 |
|
|
Ethiopia
|
Biodiversity
|
2024
|
23,135.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: ETH/SGP/OP7/Y4/CORE/BIA/2023/01 |
|
|
Grenada
|
Biodiversity
|
2024
|
50,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: GRD/SGP/OP7/Y5/STAR/BD/23/09 |
|
|
Mexico
|
Climate Change Mitigation
|
2024
|
5,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: MEX/SGP/OP7/Y3/STAR/CC/2024/119 |
|
|
Mexico
|
Climate Change Mitigation
|
2024
|
42,200.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y2/STAR/CC/2023/114 |
La generación de energía sostenible solar y eficiencia energética en 10 centros de trabajo de productores y prestadores de servicio de la comunidad de Isla Arena Campeche en la Reserva de la biósfera Ría Celestún como medida ante el cambio ( ... )
tico y mejora de los medios de vida de 50 hombres y 50 mujeres las cuales participamos en todas las actividades que se realizarán durante el proyecto.
|
|
Timor-Leste
|
Land Degradation
|
2024
|
20,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TLS/SGP/OP7/Y5/CORE/LD/2023/35 |
|
|
Mexico
|
Climate Change Mitigation
|
2024
|
50,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: MEX/SGP/OP7/Y2/STAR/CC/2023/110 |
Mejorar las condiciones de la cooperativa en la cadena de valor a través de un proyecto integral sustentable de desarrollo de capacidades internas, inclusión y empoderamiento de las mujeres y fortalecimiento de la gestión democrática para ( ... )
entar un sistema de producción de hielo
|
|
Tanzania
|
Biodiversity
|
2024
|
31,975.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/33 |
|
|
Tanzania
|
Biodiversity
|
2024
|
47,423.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/06 |
Engaging local communities to promote conservation of Ruaha catchment area along the great Ruaha River in Mbarali and Makete Districts |
|
Nepal
|
Land Degradation
|
2024
|
30,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NEP/SGP/OP7/Y4/CORE/BIA/2024/01 |
The project will based on enhancing agri-food production and value chains to increase resilience mountain communities which includes managing degraded/barren land to increase production of mountain produces, improved competitiveness of the products ( ... )
e by mountain women small farmers cooperative for sustainable business and income.
|
|
Dominica
|
Biodiversity
|
2024
|
40,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: DMA/SGP/OP7/Y4/CORE/BD/2024/01 |
. Project Name: Enhancing Biodiversity and food security and improving ecosystem health in the Castle Bruce district through Apiculture.
Project number: DMA/SGP/OP7/Y4/CORE/BD/2024/01
Applicant: Anse Kouanari Tourism Association Inc. (AKTA) ( ... )
rall objective/activities to be implemented under the grant: To increase Biodiversity conservation practices in the district.
Objectives: 1. To engage local communities in the district in the practice of sustainable apiculture to increase bee population. 2. To increase opportunities for alternative livelihoods and food security through apiculture. 3. To train at least 20 people in basic
|
|
Tanzania
|
Biodiversity
|
2024
|
27,978.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/34 |
|
|
Tuvalu
|
Community Based Adaptation
|
2024
|
40,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TUV/CBA3/2024/001 |
This project is aimed to alleviate the problem of low-income farmers in the Lofeagi-northern district. Its is anticipated that the project will have two major component of production which are two standard farms a 64 square meter farm for vegetable ( ... )
tion for 23 households and another 100 square meters of a vanilla for each of the 23 household as well. So, in the end, each of the twenty-three household of the targeted beneficiaries will each have a Vegetable standard far and a standard vanilla farm.
Altogether these two farms from all the 23 households in any one productive year can produce 30 tones of cabbages valued at the current price of
|
|
Nepal
|
Climate Change Mitigation
|
2024
|
45,000.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: NEP/SGP/OP7/Y4/CORE/BIA/2024/04 |
The project is based on enhancing climate resilience, promoting climate change mitigation, and generating income through community reforestation, climate resilient agriculture & agroforestry, creation of biodiversity positive value-chains in the ( ... )
and Samagaun villages of Gorkha, Nepal which included developing climate resilience and mitigation for sustainable resource management to protect ecosystem and empowering communities.
|
|
Kenya
|
Land Degradation
|
2024
|
30,000.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: KEN/SGP/OP7/Y1/STAR/BD/24/02 |
|
|
Tanzania
|
Biodiversity
|
2024
|
49,990.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: TAN/SGP/OP7/Y4/STAR/BD/2023/17 |
Introduction
Southern Tanzania Elephant Program (STEP) proposes a community-based project that will conserve the threatened elephant population of the Udzungwa-Nyerere ecosystem, as well as reduce poverty, improve livelihoods and enhance social ( ... )
ion in communities affected by human-elephant conflict. The project will achieve these goals by building the capacity of farmers to implement methods that protect farms from elephant damage and increase community resilience through Village Savings and Loans Associations (VSLAs) and targeted outreach with farmers. The project will also test novel and innovative crop protection measures and develop
|
|
Kenya
|
Land Degradation
|
2024
|
16,343.00
|
OP7 Y5 (July 24-June 25)
|
Project Number: KEN/SGP/OP7/Y2/STAR/LD/24/04 |
|
|