There are 27,190 projects available.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Belarus
|
CapDev
|
2015
|
24,850.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: BLR/SGP/OP5/Y4/STAR/CD/15/01 |
|
Project goal ? To summarize the 4 years? experience of SGP in Belarus and elaborate recommendations for improving the effectiveness of the activities of Belarus SCOs in the priorities of the Republic of Belarus and the GEF SGP for the period until ( ... )
Project tasks:
1. To summarize the 4-year experience in implementing local initiatives supported by the GEF SGP in Belarus;
2. To provide a broad discussion of the results of the GEF SGP projects;
3. To elaborate and disseminate information on the experiences of GEF SGP in Belarus and recommendations for the implementation of local initiatives in the priorities of the GEF SGP in Belarus for
|
|
|
Belarus
|
Climate Change Mitigation
|
2015
|
47,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: BLR/SGP/OP5/Y4/STAR/CC/15/01 |
|
Project goal ? Greenhouse gases and pollutants reduction into the atmosphere from boiler in the Children's Center "Ptich by reducing the consumption of local types of fuel and reducing electricity consumption.
Project tasks:
1. Purchasing and ( ... )
lation of a)100 solar hybrid PVT panels on the roof of boiler house of rehabilitation center "Ptich" with a total area of about 200 square meters, b) the buffer storage tank thermal energy capacity of 15 + 15 = 30,0m³ for the preparation of hot water and electricity. The installation will produce about 60 thousand. KWh of electricity per year and about 150 Gcal. hot water.
2. Development of
|
|
|
Mauritius
|
Community Based Adaptation
|
2015
|
19,330.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: MAR/SIDS-CBA/YR3/15/02 |
|
In order to achieve the first outcome of reducing the risks of landslide and rate of soil erosion, retaining walls totaling 370m2 were to be built and stairways covering 250m2 were to be renovated during the project. By December 2014, 324.15 m2 of ( ... )
ing wall had been built. A stone faced wall of 70m2 was not built, due to lack of funds. Permission was obtained to build a smaller wall of 20m2 instead. Works on renovating the staircases had not started primarily due to lack of funds. Therefore, in order to achieve this outcome, additional funds are needed.
Furthermore, in order to increase awareness about climate change, 2 sensitization
|
|
|
Georgia
|
Biodiversity
|
2014
|
20,995.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: GEO/SGP/OP5/Y4/CORE/BD/14/17 |
|
The project aims at introducing and implementing sustainable natural resource consumption practice in the Paliastomi Lake and its basin and to preserve the ancient fishing net - Lazpor made by Kolkhi fishermen for fishing in the Paliastomi Lake. |
|
|
Argentina
|
Climate Change Mitigation
|
2014
|
30,220.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: ARG/SGP/OP5/Y3/STAR/2014/26 |
|
El proyecto propone, a partir de mecanismos naturales y sencillos, que los productores de la agricultura familiar que cuentan con un promedio de tres Unidades Ganado Menor (cerdos) pueden obtener gas y fertilizantes para uso doméstico, sus ( ... )
ciones hortícolas y diferentes cultivos anuales, desde la utilización de residuos orgánicos provenientes de los pequeños animales de granja. Como toda tecnología de proceso la producción de Biogás y Fertilizante orgánico es una biotecnología que tiene por objeto la reconversión de residuos biodegradables reciclándolos, transformándolos en biogás y fertilizantes orgánicos. Se
|
|
|
Uzbekistan
|
Land Degradation
|
2014
|
2,949.16
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: UZB/SGP/OP5/Y4/STAR/LD/2014/20 |
|
Planning project aims at developing a full-fledged project on designing and creating of a universal platform (web portal) with the use of modern information and communication technologies to provide various services to farmers, small businesses, ( ... )
e and family businesses, and generally create favorable conditions on the development of interactive services to all segments of consumers.
Special questionnaire will be developed to hold presentation of the web portal and conduct polls in four regions of Uzbekistan (Samarkand, Kashkadarya, Syrdarya and Tashkent) and receive outcomes on the structure of the portal, its functional opportunities
|
|
|
Kyrgyzstan
|
CapDev CapDev
|
2014
|
50,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: kyr/comdeks/2014/11 |
|
The overall objective of the project is to preserve the mammals in the red Book of the KYRGYZ Republic in the Issyk-Kul region through the support of local protected areas, strengthening the coordination and development of income-generating ( ... )
ties in local
|
|
|
Kyrgyzstan
|
Biodiversity
|
2014
|
34,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: kyr/comdeks/2014/14 |
|
The overall objective of the project is to preserve the biodiversity of medicinal plants of the Issyk-Kul region by building greenhouses on renewable energy on growing without thorny buckthorn and cultivation of medicinal herbs |
|
|
Belize
|
Climate Change Mitigation
|
2014
|
37,202.40
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: BZE/SIDS-CBA/14/03 |
|
Climate Change is causing variable and unusual weather patterns in the Medina Bank community, which is located in the Toledo district, Belize, both during dry and rainy season. This is reducing the village?s food production capacity as farming ( ... )
ques that are seasonal and very dependent on weather predictability. Predicted climate change risks in this area of Belize include more irregular, reduced and unpredictable rain patterns, combined with higher temperatures. This project was designed to, first of all, increase Medina Bank?s awareness on Climate Change and its effects on present and future generations. It will also provide with
|
|
|
China
|
Climate Change Mitigation
|
2014
|
50,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: CPR/SGP/OP5/Y3/STAR/CC/13/07 |
|
The project will showcase the achievements that local NGOs participate in environmental protection in China and provide platform for dialog between government and local NGOs on climate change and other environmental issues. |
|
|
Antigua and Barbuda
|
Climate Change Mitigation
|
2014
|
50,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: ATG/SGP/OP5/Y3/CORE/CC/2014/16 |
|
|
|
|
Mongolia
|
Land Degradation
|
2014
|
6,745.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: MON/SGP/OP5/Y3/STAR/LD/13/37 |
|
A green steppe herder group advocating green development, Bayankhutag, herder groups, namely ?Green steppe? herders group and ?Khuikh? herder group agreed to act as equal partner implementers under this project. ?Green steppe? herder group intends ( ... )
w perennial plants in order to restore the pastures and slow desertification. The other herder group will put a foundation to further combat desertification and sand movement in the area and achieve a lot in blocking sand shifts and supporting livelihoods of the community by planting a strip of trees and protect straw reserves in the area called Dovnii Buuts, located 13 km east of Bor-Undur soum.
|
|
|
India
|
Climate Change Mitigation Climate Change Mitigation
|
2014
|
45,724.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: IND/SGP/OP5/Y3/CC/STAR/ 2014/60/UP03 |
|
The project objective of the project is to develop socially- culturally- contextually- technically- economically suitable and self- sustainable agri bio waste disposal system in 40 revenue villages of Barabanki district, which not only helps 8000 ( ... )
ers in effective removal of 16000 tons of waste but also generate employment for 45 unskilled workforce. It will also help in increase of yield by 20-30 % per acre.
1. Agri bio waste management is effective in reducing the burden of safe disposal and proper treatment of biodegradable waste.
2. It also has ability to convert organic waste into organic manure containing valuable resources useful
|
|
|
Pakistan
|
Biodiversity
|
2014
|
48,525.25
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: PAK/SGP/OP5/Y2/STAR/2013/02 |
|
4. Project Objective and Proposed Activity
? Nature of the proposed activity
? Immediate objectives
? Expected project deliverables
? Description of the proposed activities required in order to realize the project?s objective, clearly ( ... )
ting the sequence of activity (with time frame, responsible party etc.)
? Target beneficiaries in terms of socio-economics, geography and gender, should be elaborated
? Strategy for development of indicators to assess project progress and achievements. The indicators should be specific, measurable, attainable, reliable ad time bound (SMART).
? Project work-plan matrix with indicators and
|
|
|
Sri lanka
|
International Waters
|
2014
|
2,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: SRL/SGP/OP5/STAR/IW/2014/01 |
|
Baseline survey in the proposed community based water management and regenerative agriculture project |
|
|
Sri lanka
|
Biodiversity
|
2014
|
36,262.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: SRL/SGP/OP5/STAR/BD/2014/03 |
|
Biodiversity conservation and its continues enrichment through community based initiatives, capacity building of beneficiaries men, omen,youth and school children. Development in home gardens to emphasize ecosystem imporovement |
|
|
Argentina
|
Land Degradation
|
2014
|
49,542.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: ARG/SGP/OP5/Y3/STAR/2014/14 |
|
La finalidad del Proyecto consiste en contribuir al desarrollo socio-económico de las familias minifundistas involucradas impulsando condiciones de mayor equidad de género. Siendo los objetivos: Mejorar la provisión de agua para el consumo ( ... )
ar y la producción de huertas y granja; Promover la conservación de los recursos naturales y la biodiversidad; Fortalecer las producciones destinadas al consumo familiar de manera sustentable, posibilitando la generación de excedentes comercializables; Fortalecer procesos organizativos de los grupos, promoviendo la igualdad de participación de varones y mujeres.
Se llevará a cabo un plan
|
|
|
Tanzania
|
Land Degradation
|
2014
|
47,291.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: TAN/SGP/OP5/Y3/STAR/LD/13/15 |
|
Context:
Mbala-Chamakweza in Chalinze is inhabitated by mostly Maasai pastoralists. However, these pastoralists are not nomads because they also do farming. The community has a huge problem of water. They get water from seasonal streams in 5 ( ... )
per year. During the remaining 7 months, the nearest water source is 10km away. Because of the gravity of the water problem, livestock only drink water once after every two days. Quite often, the community has to grapple with diseases, which are associated with inadequate water. These include cholera, dysentery and diarrhea. The proposed project will drill water and use solar energy for
|
|
|
Cuba
|
Community Based Adaptation
|
2014
|
45,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: CUB/SIDS-CBA/13/01 |
|
Contribuir a aumentar la resiliencia al cambio climático, a partir de la aplicación de medidas específicas para reducir las vulnerabilidades y fomentar capacidades de adaptación en el sector agrícola, mediante prácticas sostenibles de ( ... )
ollo en las comunidades de la CCSF ?Sierra Maestra? es el objetivo del presente proyecto, dadas las evidencias que existen de los efectos del cambio climático en el área donde se ubican; pues según informes de los expertos es la Llanura Sur Habana-Matanzas una de las áreas más vulnerables al cambio climático en el archipiélago cubano. Sitio donde la ocurrencia de fenómenos
|
|
|
Dominican republic
|
Biodiversity
|
2014
|
28,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: DOM/SGP/OP5Y3/STAR/BD/2013/34 |
|
Fortalecimiento de las capacidades y conciencia ambiental a nivel locales para la restauración ecológica y el manejo integrado del ecosistema manglar; incrementando la resiliencia de las comunidades costeras a los efectos del cambio climático. |
|
|