There are 27,190 projects available.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Kazakhstan
|
Community Based Adaptation
|
2011
|
10,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CBA/KAZ/SPA/2011/02 |
|
The project is focused on environmental stabilization of the territory by introducing regulation of water streams in ravines, banks and the main water courses. This additional steps to retard the effluents in water courses will considerably ( ... )
then the project of soil and water protection territory arrangements. They will enable to reduce the quick discharge of water from watersheds, to accumulate water in micro-dishes thus increasing the quantity of summer reserve within the land use area. This will serve a long-term basis for environmental and social-economic sustainability of the land farming under the climate change
|
|
|
China
|
International Waters
|
2011
|
42,798.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CPR/SGP/OP5/CORE/IW/11/03 |
|
Main poblems:
To increase income, the local residents at mangrove area destroy mangrove for buidling shrimp pool which results in the reduction of mangrove area, the degradation of mangrove ecosystem. And also residual diets and chemical medicines ( ... )
l aquaculture causes severe water pollution.
Project activities/solutions:
1.establish new type of eco-aquaculture system at destroyed mangrove tidal flat
2.technique training on eco-aquaculture, establish eco-aquaculture development system at Datao village
3.mangrove reforestation in three coastal cities: Beihai, Qinzhou and Fangchenggang .
4.support one local NGO at Qinzhou to get
|
|
|
Armenia
|
Climate Change Mitigation Climate Change Mitigation
|
2011
|
48,230.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: ARM/SGP/OP5/CORE/CC/11/04 |
|
The project aims to enhance the capacities of Shaghik community of Shirak region towards energy efficiency of buildings and usage of renewable energy sources by means of energy saving measures and constructing, piloting and testing of a solar water ( ... )
g system.
The project is planning to construct and pilot a solar water heating system in Shaghik community, which includes the heating system for two classrooms of the school located in the local administration building and outdoor public shower unit functioning during non-heating season. Also construction and renovation works for houses and the local administration building are planned to
|
|
|
Ukraine
|
Climate Change Mitigation
|
2011
|
50,000.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: UKR/SGP/OP4/Y3/RAF/2010/28 |
|
The project aims at promoting use of non-motorized transport in Lugansk region. The demonstration activities will take place in small town Stanychno-Lugansk (around 10000 people), which is characterized by high level pollutions not only from the ( ... )
industries, but also from transport. Lugansk region is one of the most pressing on environment in Ukraine. The main sources of environmental pollutions in the region are chemical, coal, machine building, oil industries and transport. The remote areas are characterized by very low awareness, participatory and problem solving capacities by the local people themselves. The significant transport
|
|
|
Ukraine
|
Climate Change Mitigation
|
2011
|
50,000.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: UKR/SGP/OP4/Y3/RAF/2010/27 |
|
The problem of Lugansk is the huge open landfill, which damage the environment as well as influences the environmental security in the city. Local community is not aware of the influence of solid domestic waste on climate change. In addition there ( ... )
reliable data related to volume of greenhouse gas emissions released by solid domestic waste in Lugansk region. The NGO ?Consumers committee? initiated the project that will reduce the consumption and is supposed to impact resolving the issues of climate change in industrial regions of Ukraine.
Therefore project aim is to solve several questions: to determine volume of greenhouse gas emissions
|
|
|
China
|
Chemicals
|
2011
|
47,244.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CPR/SGP/OP5/CORE/CH/11/02 |
|
Main problems:
Currently, regarding chemicals risk prevention, government work focuses on industries but farmers at rural area are lack of awareness. relevant department is lack of capacity of monitoring and management which results in increasing ( ... )
nd threat to human health and biodiversity safety and surrounding ecosystem function decreased.
Mentougou is an important ecological conservation area in Beijing. it's important for protect ecosystem safety of Beijing to raise public awareness on chemicals risk and solve obsolete pesticides exposure problem, which is also can provide lessons learned to other rural areas in China.
Project
|
|
|
China
|
Land Degradation
|
2011
|
49,878.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CPR/SGP/OP5/CORE/LD/11/01 |
|
Main Problems:
1. Land degradation at mine areas;
2. Poverty in local community;
3. Heavy metal contaminations in the soil after mining;
4. Low healthy level of forest;
5. Lack of technology on the control of land degradation in mine and ( ... )
l and prevention of heavy metal contaminations;
6. local communities are lack of awareness on pollution control and prevention
Project activities/solution:
1. To develop a participatory community development plan;
2. To restore the vegetation of degraded mines thought 300 Mu afforestration;
3. To conduct close-to-nature modification for 1000 Mu natural secondary forest;
4. To implement
|
|
|
China
|
International Waters
|
2011
|
46,929.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CPR/SGP/OP5/CORE/IW/11/01 |
|
Main problems:
1.single aquaculture species has been existing for a long time; species degradation, disease and insect pest increasing, together with sewage, threaten marine eco-system
2. marine eutrophication due to over feeding and aquaculture ( ... )
, causes marine environment worsening and red tide at coastal area is increasing
3. water pollution caused by medicine and antibiotic misusing disturbed marine species and their habitate and threatened marine biodiversity
4. over cultivation, severe pollution, bacteria reproducing, aquaculture pool degradation and obsoletion, all have negative impact on environment and sustainable
|
|
|
China
|
Chemicals
|
2011
|
50,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CPR/SGP/OP5/CORE/CH/11/03 |
|
Main problems:
680,000 energy-saving lamps have been used in Yinchuan, Ningxia since 2008 and after three-years, these lamps are going towards their end of life cycle. One energy-saving lamp contains 5mg. mercury. If the mercury releases, it will ( ... )
e water resources and air. There is no treatment on mercury-contained waste including used energy-saving lights now.
Project activities/solutions:
1.training for staff and volunteers
2.prephase evaluation
3.public outreach on used energy-saving lights collection
4.install mercury-contained waste recycle bins and collect these waste for industry treatment
5.project results promotion
|
|
|
Nicaragua
|
Climate Change Mitigation
|
2011
|
7,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: NIC/SGP/OP5/CORE/CC/2011/18 |
|
Proveer energia electrica mediante la instalacion de paneles solares a comunidades indigenas que tradicionalmente han protegido fuentes de agua y bosque que alimentan el sitio Ramsar Lago de Apanás, |
|
|
Nicaragua
|
Biodiversity
|
2011
|
10,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: NIC/SGP/OP5/CORE/BD/2011/10 |
|
fortalecimiento del turismo rural comunitario en el Área Protegida de la Isla de Ometepe, por parte del grupo de mujeres y la promoción de consumo de productos orgánicos para los turistas y las familias de la comunidad. |
|
|
Dominica
|
Biodiversity
|
2011
|
2,000.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: DMA/SGP/OP4/Y3/CORE/10/02 |
|
It is our firm belief at Brainstorm Inc. that our children?s education now will impact the
attitudes of our future leaders and generations. There is a need to educate Dominica?s children
in order to secure their future wellbeing, promote a ( ... )
nable environment agenda, and
encourage greater appreciation for our indigenous people. They need to be provided extensive
and meaningful exposure to organic agriculture methodologies and sustainable land use
practice, the options for generation of renewable energy, and lifestyles of our indigenous
ancestors. We have recognized that there is a lack of such opportunities for effective
|
|
|
Cambodia
|
Community Based Adaptation
|
2011
|
43,480.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2011/46 |
|
The climate change has happened and livelihoods along the Mekong River are extremely vulnerable to its impacts, especially the lower Mekong basin due to the adverse impact which arises from activities in the regions and countries upstream and poor ( ... )
condition of communities. According to the VRA conducted by CRDT team at the proposed project site, climate change was a present threat and over the past five years, the rain is noticeably coming later and ending earlier, which has dramatic effects on crop production especially rice damages. All respondents in the VRA discussions claimed that increased water accessibility for agricultural
|
|
|
Papua new guinea
|
CapDev CapDev
|
2011
|
4,500.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: PNG/SGP/UN DaO-CBA/2012/01 |
|
Successfully completed in May 2012, the replication of Crocodile farming to 7 new villages of the existing 50 communities living in the Middle and Upper Sepik River. The US$4,500 planning gran is intended to support the consultation process to build ( ... )
SWMI initiative to cover the entire river system as well as put forward a full project proposal for US$150,000 strategic project grant, which may be the first awarded by SGP in the country.
|
|
|
Ghana
|
Land Degradation
|
2011
|
29,750.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: GHA/SGP/OP5/CORE/LD/11/18/002 |
|
1.0 PROJECT BACKGROUND
Pelungu is currently under the Talensi/Nabdam district, one of the districts carved from the Bolgatanga District Assembly (now Bolgatanga Municipality) in August 2004 with Tongo as the district capital. However, with the ( ... )
proposed creation of new districts by the Ministry of Local Government and Rural Development (MLGRD), Pelungu will fall under the Nabdam District with Nagonde as the District capital. The population of Pelungu is currently difficult to establish since it has to be extrapolated from the composite figures that constituted Bolgatanga district of which Talensi/Nabdam (including Pelungu) area was a
|
|
|
Ukraine
|
Climate Change Mitigation Climate Change Mitigation
|
2011
|
39,113.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: UKR/SGP/OP4/Y3/RAF/2010/04 |
|
The project aims to combat ecological and socio-economic crisis in Horodytsia village of Zhytomyr region caused by Chornobyl disaster. The main objective is to develop a system for sufficient use of natural resources of the region and to build ( ... )
utional capacity of the community. This will be reached through a sustainable development plan for the region and arranging of ecological forest management, sustainable fishing practices, organic farming, production of solid fuel and implementation of green tourism. The objectives of the project include:
? Development of the Strategy of Sustainable Development for Horodytsia village through
|
|
|
Mongolia
|
Multifocal Area
|
2011
|
6,467.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: MON/SGP/OP4/Y3/Core/11/12 |
|
This project intends to organize Training Workshop for selected successful SGP grantees on access to local markets and to prepare and publish registry books for seed and seedling producers, based on wide and rich experience of the formerly US Ger ( ... )
tive Programme.
|
|
|
Armenia
|
Biodiversity Biodiversity
|
2011
|
48,662.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: ARM/SGP/OP5/CORE/BD/11/02 |
|
Amasia is one of unique districts of Shirak region which is surrounded by Alpine meadows. It counts 19 plants registered in the Red Data book of Armenia among which 14 are endemic. This district is considered a cattle-breeding area, which presently ( ... )
an integrated policy on sustainable land use. There are no limitations for using meadows, pastures, arable lands in this district and pasturing is done at the hillsides by active canals and even near the sources of potable water. The Northern communities lack awareness on environmental issues. As a result, over-grazing gradually endangers ecosystems. The project plans to address the livelihood
|
|
|
Uzbekistan
|
Biodiversity
|
2011
|
32,325.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: UZB/SGP/OP4/Y3/CORE/2010/35 |
|
The project aims to partially restore degraded bee keeping practice in mountainous area nearby Tashkent. The project aims: first, to demonstrate economical benefits of the services provided by bees - benefits from pollination; and secondly - to ( ... )
20 local people leaving in different parts of the district to engage and continue bee keeping practice.
|
|
|
Ukraine
|
Climate Change Mitigation Climate Change Mitigation Climate Change Mitigation
|
2011
|
47,592.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: UKR/SGP/OP4/Y3/RAF/2010/16 |
|
The project aims for the development of green tourism and raising awareness of the sustainable use of natural resources. In this context the energy saving measures will be introduced in the green tourism area/buildings, established in the framework ( ... )
Project. .
The project foresees the demonstrational-investment activities, increase public awareness about ecotourism and its features, benefits, feasibility and profitability at the same time protecting environment.
The aim is to show on the example of the introduction of camping for 15 guests that ecotourism is environmentally friendly and economically promising activity. In the course of
|
|
|