There are 27,190 projects available.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Guatemala
|
International Waters
|
2006
|
21,671.05
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: GUA/CWI/OP3/02/06/14 |
|
The project consists of building a safe drinking water system, consisting of a concrete storage tank, distribution pipelines, as well as taps and consumption meters for 68 households. The water will come from a natural spring, which is owned by the ( ... )
community group and has been tested for safe drinking.
500 Calycophyllum multiflorum trees will be planted on 0.16 ha surrounding the natural spring to protect it. 140 m of live barriers, using Yucca elephantipes, will be planted on areas prone to landslides. A disaster prevention committee will be formed. The project includes a health component, with a diagnosis of local health, water samples
|
|
|
Albania
|
Land Degradation
|
2006
|
33,500.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: ALB/SGP/OP3/Y1/06/03 |
|
Demand for a wide variety of wild species is increasing with growth in human needs, numbers and commercial trade. With the increased realization that some wild species are being over-exploited, a number of agencies are recommending that wild species ( ... )
ght into cultivation systems (BAH, 2002; Lambert et al., 1997; WHO, IUCN and WWF, 1993).
As previously noted in our reasoning, due to the lack of diversification of the income generating sources by the Albanian farmers, the collection pressure on the wild population of these plants is beyond the limit that these ecosystems can support.
The GEF/SGP Albania does see the cultivation of wild
|
|
|
Bhutan
|
Land Degradation
|
2006
|
21,356.00
|
Phase 3
|
|
Project Number: BHU/OP3/Y2/06/01 |
|
PROJECT OUTCOME
The expected outcome of the three years sustainable land management project was defined into two categories as outline in the project proposal. Those two categories were hardware system development and the software system of ( ... )
pment. These two systems in long run would lead to the secondary impact of enhancing the livelihood sources of the community leading to the improvement in the living standard of the rural community and their sustainability. Some of the immediate outcomes from hard system as well as from soft system development had been achieved within this project term.
The project has accomplished most of the
|
|
|
Pakistan
|
Biodiversity
|
2006
|
34,008.00
|
Phase 3
|
|
Project Number: PAK/OP3/06/17 |
|
1. Profile of Implementing Organization
BDRO is a non Governmental, non-political, non-sectarian and non-profit organization. BDRO has 24 CBOs in 24 villages of Taluka Badin. BDRO usually works at grass root level in the villages of Taluka Badin ( ... )
g the participatory approach.
BDRO is working for the socio economic empowerment of the rural peoples and striving for the poverty alleviation through implication of different development program in the rural areas. It was established in 2000 & registered in 2002, under Social welfare Department, by a group of energetic youngsters representing both sexes. Organization has a general Body
|
|
|
Mongolia
|
Biodiversity
|
2006
|
8,315.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MON/06/07 |
|
Will establish a tree and tree plantation in Orkhontuul soum of Selenge province for forest rehabilitation. |
|
|
Uruguay
|
Land Degradation
|
2006
|
25,000.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: URY/06/12 |
|
Se propone fortalecer y apoyar a productores familiares convencionales y jóvenes de Sauce para conocer, apropiarse, implementar y monitorear un programa de gestión ambiental predial orientado a mejorar la calidad de los recursos naturales y la ( ... )
d alimenticia a través de la práctica de una Agricultura Sustentable.
Los productores de Sauce en su mayoría identifican problemas ambientales prediales a resolver, valorados económicamente (encharcamiento, dificultad de uso de maquinaria liviana, dificultad de manejo de plagas y enfermedades, etc), y sus consecuencias sociales (menores ingresos prediales, migración juvenil del campo a la
|
|
|
Mali
|
Multifocal Area
|
2006
|
34,655.72
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: MLI/05/17 |
|
Le projet de sauvegarde de la biodiversité dans les mares de Bandiougou et Dio dans la région de Mopti, vise le maintien des fonctions écologiques des ces mares afin de sauvegarder les esp?ces de faune aquatique qui y vivent. Ces esp?ces se ( ... )
nt menacées dans les deux mares par l?exploitation non soutenue des populations conjuguée avec les aléas climatiques. La mare de Bandiougou est située dans la commune rurale de Pignari-Bana, cercle de Bandiagara, celle de Dio est située dans la commune rurale de Sio, cercle de Mopti.
Le Projet d?Appui aux Communes Rurales de Mopti (PACRM) ? travers le Fonds d?Appui ? la Gouvernance
|
|
|
Tanzania
|
International Waters
|
2006
|
24,386.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/NBI-NTEAP/06/04 |
|
The project purpose is to strengthen the capacities of two primary schools along the lake to overcome environmental threats with negative impacts to Lake Victoria through addressing effects of deforestation and use of industrial agro-chemicals. The ( ... )
t will operate in two schools of Mwajombo and Buganda in Misungwi district. The project will enhance environmental education and community health education to the two schools, support schools to establish tree woodlots at their respective compounds to minimize soil erosion and act as wind breakers during wind period and will promote organic farming activities in schools to minimize the non point
|
|
|
Tanzania
|
Land Degradation
|
2006
|
24,242.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/NBI-NTEAP/06/03 |
|
The project purpose is to strengthen the capacities of two primary schools along the lake to overcome environmental threats with negative impacts to Lake Victoria through addressing effects of deforestation and use of industrial agro-chemicals. The ( ... )
t will operate in two schools of Kigongo and Bulemeji in Misungwi district. The project will enhance environmental education and community health education to the two schools, support schools to establish tree woodlots at their respective compounds to minimize soil erosion and act as wind breakers during windy period and will promote organic farming activities in schools to minimize the non point
|
|
|
Mongolia
|
Biodiversity
|
2006
|
4,385.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MON/06/37 |
|
Rehabilitate willows along Eruu river and establish a small fruit tree plantation in order to support local community's sustainable livelihood. |
|
|
Mongolia
|
Biodiversity
|
2006
|
9,194.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: MON/05/26 |
|
This project will rehabilitate and expand the sea-buckthorn plantation by new technology and maintain nature conservation by seabuckthorn grove in the Kherlen river valley furthermore establish an energetic and progressive tree plantation garden. |
|
|
Zimbabwe
|
Biodiversity
|
2006
|
29,429.40
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: ZIM/SGP/OP3/Y2/CORE/2006/04 |
|
The project area is Sedze vilage situated in chitsanza ward 19 of Nyanga district.the goal of the project is sustainable management of biodiversity and water resources in order to improve the livelihoods of households in Sedze village.
project ( ... )
ives are
-increase wood biomass production t the household and community levels
-improve efficiency in the use of wood biomass energy resources for coking
-improve access to water resources and management of wetlands areas in the foothills of Nyangani mountain range.
project activities
-awareness raising on the use and importance of chingwa stoves and on the need to conserve vegetation
|
|
|
Ecuador
|
Multifocal Area
|
2006
|
39,300.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: ECU/OP3/1/06/011 |
|
El objetivo del proyecto es monitorear y evaluar la ejecución de los proyectos PPD en campo (proyectos de modalidad II) con el fin de apoyarles técnicamente y asegurar su favorable ejecución en el tiempo establecido. |
|
|
Tunisia
|
Climate Change Mitigation
|
2006
|
25,000.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TUN/OP3/Y2/06/06 |
|
L'objectif principal du projet" sensibilisation à la maîtrise de l'énergie dans les établissements scolaires" est de sensibiliser à l?utilisation des énergies renouvelables et à la maîtrise des énergies :
? Fournir aux responsables du ( ... )
ère de l?éducation nationale, aux directeurs des établissements, aux enseignants et aux élèves l'information nécessaire et pratique sur la maîtrise de l?énergie.
? Les responsables du Ministère de l?éducation nationale, les directeurs des établissements, les enseignants et les élèves seront sensibilisés sur les possibilités des utilisations des énergies renouvelables.
? Un
|
|
|
Tunisia
|
Chemicals
|
2006
|
10,000.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: TUN/OP3/Y1/05/015 |
|
Le projet de sensibilisation aux Polluants Organiques Persistants a pour but principal de mener des actions de sensibilisation auprès des divers acteurs concernés par les dioxines, les furannes et HCB, en tant que commerçants, agriculteurs, ( ... )
strations publiques, ménages, afin de circonscrire les dangers réels des POPs et de prescrire quelques actions en vue de faire connaître encore plus les méfaits et de protéger la santé et l?environnement humaine.
Les activités du projet sont
Le projet consiste à mener trois activités principales.
1. L?organisation d?une journée d?étude sur les POPs destinée aux agents
|
|
|
Nicaragua
|
Chemicals
|
2006
|
18,735.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: NIC/OP3/2/06/10 |
|
El proyecto contribuirá a reducir los riesgos de envenenamientos en personas y animales por mal uso y manejo de agroquímicos en las fincas y en las comunidades, disminuir la contaminación de ríos, pozos, fuente de agua y aguas subterráneas, ( ... )
te el impulso de una campaña de uso y manejo racional de los agroquímicos y el manejo integrado de plagas; y reducir contaminación química en ríos, pozos, vertientes de agua y aguas subterráneas, por el mal uso y manejo de los desechos envases y/o empaques de
|
|
|
Turkiye
|
Biodiversity
|
2006
|
11,700.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: TUR-05-16CB |
|
The project aims to bring the Grantees from all over the country to the SGP Project Site (TUR-04-12). The theme of the meeting is to identify the local impacts of SGP projects, particularly those of the Biodiversity projects, as currently there is ( ... )
mate change project completed and very few in land degradation FA. The meeting will include a one-day field trip to the Acarlar Lake Visitors and Environmental Education Centre and two days of meetings focusing on the local impacts, from project to locals, from locals to project and partnerships and participation in projects. The meeting is also hoped to have the added benefit of bringing the
|
|
|
Mozambique
|
Land Degradation
|
2006
|
20,911.40
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MOZ/SGP/OP3/Y2/CORE/LD/2006/02 |
|
The project is to be implemented by Khensani Association, directly in Machubo and Marracuene-Sede administrative posts, with a total population of 41,000 habitants. These areas are bordered by the Indian Ocean and crossed by Incomati River, in ( ... )
n these there is an extensive area with loose, and movable sand dunes prone to erosion by winds, and rains. These sand dunes as well the local vegetation provide a beautiful and high value area for tourism, contributing to the socio-economic importance of the area. Although this potential, the population is facing problems of absolute poverty with large indices of unemployment. Associated to
|
|
|
Uganda
|
International Waters
|
2006
|
25,000.00
|
Pilot Phase
|
|
Project Number: UGA/NTEAP/06/11 |
|
The purpose of the project is to improve the conservation of Kyebisagazi wetland in Rakai district by covering the pits that have been dug by community members in search of water. The project will also construct 8 shallow wells and drinking troughs ( ... )
estock to provide clean water for domestic consumption and for livestock. The project will increase access to clean water for 300 households in Kyebisagazi
|
|
|
Kenya
|
International Waters
|
2006
|
25,000.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: KEN/NTEAP/06/009 |
|
|
|
|