|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Lithuania
|
Biodiversity
|
2005
|
22,120.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: LIT/05/03 |
The village of Musteika in Dzukija National Park has retained a community way of life, with its own traditions, and archaic trades and artisan crafts. Village beekeepers raise bees native to the region, and continue to foster this fast disappearing ( ... )
Surviving in the area surrounding Musteika are quite a number of beehives in hollow pine trees, which are now considered natural monuments. This type of beekeeping is impossible without natural fields, heather, and black alder groves, of which there is no shortage in the area around Musteika. The development of alternative and ecological land management is important not only to this area.
|
|
Mexico
|
Biodiversity
|
2005
|
24,725.02
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: MEX/05/06 |
Llevar a cabo la engorda de Pejelagarto y Tenguayaca (Lepisosteus spp.), y (Petenia Splendida) |
|
Chile
|
Biodiversity
|
2005
|
44,444.44
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: CHI/05/01 |
En la III Región los ecosistemas áridos y semiáridos están asociados a ecosistemas muy frágiles en este caso a especies de animales que están vulnerables o bien en peligro de extinció. El río copiapó se caracteriza por presentra ( ... )
iones de camarones de río especie que ha sido utilizada y extraida indiscriminadamente ya que cuando se colectan coincide con los períodos de ovulación y por lo tanto las hembras con los huevos son extraídos y eliminados. El Liceo manuel Blanco Encalada y su centro de padres y apoderados han decido hacer algo para recuperar la especies y por lo tanto esperan reproducir un numero importante de
|
|
Thailand
|
Climate Change Mitigation
|
2005
|
23,735.66
|
Phase 2
|
Project Number: THA/04/33 |
Chiangmai is regarded as the only one large-sized city in Thailand that is falling short of efficient public transport system. Residents of Chiangmai and visitors are hardly convinced of an effective and sure way for transportation. Without ( ... )
nt and ample walkways ,and , safe and clearly established bike-lanes, personal car has always been the first choice and thing of necessity for daily travel. It is estimated that residents of Chiangmai are spending comparatively more time on daily travel than
residents of Bangkok.
At the end of 2003, there were 108,465 personal cars, 141,123 personal trucks and 681,549
|
|
Papua new guinea
|
Biodiversity
|
2005
|
1,986.01
|
Phase 3
|
Project Number: PNG05/16 |
Collection of Orchid species and multiply for commercial purchase (farm) to preseve species |
|
Botswana
|
Multifocal Area
|
2005
|
2,000.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: BOT/05/13 |
The presence of gullies and dongas in Moroka has disfigured the environment, and there is bare landscape as a result of excessive vegetation loss. Wild ornamental fruits have disappeared, and destruction of archaelogical ruins has lead to an ( ... )
active environment.
The project aims at raising awareness in the art of sustainable utilisation of natural resources, mobilising the community into taking responsibility to rehabilitate their degraded land, creation of Danangombe Park to preserve archaelogical ruins through the involvement of all stakeholders.
|
|
Mongolia
|
Biodiversity
|
2005
|
2,446.00
|
Phase 2
|
Project Number: MON/04/20 |
Spring is a most valuable life-supporting source in Mongolian Gobi. Over the last 20 or so years, many springs have dried up in Mongolia. If this trend continues in its current speed, half the all springs in Gobi will completely be dried up over the ( ... )
- 5 years. The grant is given to a small local community group to protect a life supporting spring in the Gobi region for water supply of some rare and endangered animals as well as for establishing a small forest grove for mutual support with the spring. A small tree garden or grove to support spring flow is being developed.
|
|
Mozambique
|
Multifocal Area
|
2005
|
43,600.00
|
Phase 2
|
Project Number: MOZ/SGP/OP2/Y6/01 |
The project aims to promote a systematic and rationale use of natural resources, and conserve the biodiversity of Manica province by establishing database systems and disseminating information on the status and use of natural resources. A ( ... )
lized database system, about the province development, with information on the use of land, biodiversity and natural resources, water and the status of environment conservation in the districts of Chimoio, Manica, Sussundenga and Gondola will be put in place. The project will bring together environmental protection, social, economic and development activities that are undertaken by local
|
|
Turkiye
|
Biodiversity
|
2005
|
23,500.00
|
Phase 2
|
Project Number: TUR-04-17 |
According to a report by WWF, the global conservation organization, lack of veteran trees and deadwood in forests is a major cause of biodiversity loss. The report, Deadwood ? Living Forests, reveals that a third of forest-dwelling species rely on ( ... )
r dying trees, logs, and branches for their survival. The removal of decaying timber and old trees from forests lead to a decline in species such as insects, beetles, fungi, and lichens. Woodpeckers, bats, and squirrels which nest in hollow trees also loose their natural habitats.
The amount of deadwood is at a critically low level in most of the forests today, mainly due to the lack of
|
|
Kyrgyzstan
|
Biodiversity
|
2005
|
9,000.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: KYR/SGP/OP3/Y1/CORE/2005/06 |
A lot of plants included in the Red Book have not had yet developed special protection measures, not clearly defined habitats and natural stocks. In connection with it, it is necessary to execute selection-genetic inventory, to select ( ... )
ic-valuable forms and use them for establishment of collection and mother stock plantation and for rehabilitation of structure of degraded natural stocks. At the same time collection and mother stock plantation will serve as a protected pool for rare and disappearing species.
The main goal of the project is establishing forest nursery of Red Book plants and also main indigenous species in
|
|
Kyrgyzstan
|
Biodiversity
|
2005
|
5,000.00
|
Phase 2
|
Project Number: KYR/SGP/OP2/Y6/CORE/2004/94 |
One of the new reasons of birds of prey disappearance is poaching of the local population that is catching and selling of birds illegally. New groups of people, who do not have traditional skills in catching and training such birds, are occupied ( ... )
oaching. Traditional munushkers (bird trainers) are real power against new poachers.
The main goal of the project is to make interested traditional munushkers (their knowledge, skills, authority) in actions aimed at birds of prey population rate decrease in mountainous areas of Osh oblast.
During the project implementation the following results are expected to be achieved:
Environment
|
|
Egypt
|
Climate Change Mitigation
|
2005
|
17,301.04
|
Phase 2
|
Project Number: EGY-04-175 |
spread the use of bicycles considered as a clean environmental method which would contribute in the atmospheric change phenomenon and preserve international environment. Raise awareness on the atmospheric pollution. distribute 400 bicycles in the ( ... )
tion
distribute the culture of using bicycil in the governorate during the project period and the effects will extend after funds expired
|
|
Egypt
|
Climate Change Mitigation
|
2005
|
17,301.04
|
Phase 2
|
Project Number: EGY-04-176 |
spread the use of bicycles considered as a clean environmental method which would contribute in the atmospheric change phenomenon and preserve international environment. Raise awareness on the atmospheric pollution. distribute 400bicycles in the ( ... )
tion
distribute the culture of using bicycil in the governorate during the project period and the effects will extend after funds expired
provid three hundred and fifty bicycles by the project to the beneficiaries in Beni Suef
|
|
Egypt
|
Climate Change Mitigation
|
2005
|
17,301.04
|
Phase 2
|
Project Number: EGY-04-177 |
spread the use of bicycles considered as a clean environmental method which would contribute in the atmospheric change phenomenon and preserve international environment. Raise awareness on the atmospheric pollution. distribute 350 bicycles in the ( ... )
tion
distribute the culture of using bicycil in the governorate during the project period and the effects will extend after funds expired
provid three hundred and fifty bicycles by the project to the beneficiaries
|
|
Nicaragua
|
Biodiversity
|
2005
|
30,000.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: NIC/OP3/05/12 |
A pesar de ser un área protegida, la cordillera Dipilto-Jalapa, no está siendo manejada como tal. Es una zona principalmente agrícola, en donde con el proyecto se pretende que los campesinos de la zona desarrollen actividades turísticas, con lo ( ... )
contribuirá a la conservación de la zona. Para ello se definirán los principales puntos turísticos del área donde se establecerá infraestructuras de alojamiento, comedor y senderos interpretativos construidos en forma compatible con el paisaje natural. El inicio de la ruta se hará con la presentación de los diferentes paquetes turísticos en la Comunidad Las Brisas, en el Municipio de
|
|
Ghana
|
Land Degradation
|
2005
|
36,800.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: GHA/05/076 |
The project addresses problems in land degradation and desertification which has characterised the bechme part of the Brong Ahafo region. The area has been degraded due to unsustainable farming, bush burning and illicit logging and cutting of fire ( ... )
The goal of the project is to develop the capacities of the local communities in degraded land restoration and sustainable natural resource management for the socio-economic wellbeing of the people.
The project will undertake the following field activities:
1. Develop local capacity for sustainable land, forest and wildlife management. Activities to achieve this component are to create
|
|
Ghana
|
Land Degradation
|
2005
|
34,300.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: GHA/05/081 |
The project addresses problems in land degradation and desertification control in Zawse/Yarigungu in the semi arid area of the Upper East Region. The project area is mountainous with more than 80% of the lands badly degraded beyond natural ( ... )
ration. Most of the areas are bare with no tree cover and wildlife. The degradation was due to unsustainable agricultural practices; uncontrolled annual bush fires, uncontrolled sand winning, excessive harvesting of woodfuels; over grazing, poor water conservation and soil fertility management systems, inappropriate land use practices and weak institutional capacity for sustainable development.
|
|
Mali
|
Biodiversity
|
2005
|
29,860.30
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: MLI/05/11 |
Le projet de restauration des berges du fleuve Bani dans la commune rurale de Wacoro cercle de Dioïla a été conçu par l?ONG/GAREF (Groupe d?Action de Recherche d?Etude et de Formation).
Il couvre les villages de Wacoro, Zéta, Némétoulaye, ( ... )
una et hameaux de culture.
Le projet vise le renforcement des capacités techniques et organisationnelles des populations par une gestion concertée des ressources naturelles pour le maintien de la biodiversité dans la zone du projet en luttant contre les causes de la dégradation par les techniques biologiques anti-érosive. La mise en ?uvre concernera les activités suivantes :
- mise en
|
|
Kazakhstan
|
Climate Change Mitigation
|
2005
|
33,100.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: KAZ/05/19 |
In existing available housing system the reserves are still available to economize heat, being consumed for heat supply of condominium objects due to warming of the outside fences and implementation of efficient methods of automatic heat control and ( ... )
er regulation system. But realization of the measures goes slowly. It concerned with the high costs for implementation, and proprietors are not interested in taking such expenditures upon themselves.
The main idea of the project is to involve apartment proprietors into activities on warming of apartment houses and automatic heat control and regulation system installation, demonstration of
|
|
Kyrgyzstan
|
Land Degradation Land Degradation
|
2005
|
13,000.00
|
Phase 2
|
Project Number: KYR/SGP/OP2/Y6/CORE/2004/87 |
Several devices (biogas plant, hydraulic ram, mini HEPS, vertical generator) are known in Kyrgyzstan. But population is informed about these technologies skin-deep. This superficial knowledge hamper their wide introduction besides each device has ( ... )
ortcomings and restriction.
The main goal of the project is to eliminate shortcomings and limitations of separate devices by combining them in one energy delivery and energy saving complex by the example of average farm and give wide propagation of experiment results that will raise public awareness about these technologies.
In the course of project implementation it is expected to obtain the
|
|