There are 29,070 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Egypt
|
Climate Change Mitigation
|
2005
|
17,301.04
|
Phase 2
|
Project Number: EGY-04-164 |
protecting environment from car's exhausts poullotion.
speading ideology of car's workshops for repairing amd maintanance
conducting environmental feasiblity studies and measuring environmental impact
raising public awerness of environment ( ... )
tion impactss from car's exxhausts
reducing level of reverse worn
reducing levels of gases that causing heat occlusion through participation of civil community, by transferring cars to run with environment friendly nutural gas instead of benzene which pollotes the
|
|
Egypt
|
Climate Change Mitigation
|
2005
|
17,301.04
|
Phase 3
|
Project Number: EGY-05-182 |
Providing and encouraging the use of bicycles as a clean environmental means of transport which will contribute to improved atmospheric conditions and preserve the international environment. This will be achieved through raising awareness of ( ... )
heric pollution, distributing 450 bicycles amongst the population of Minia, and promoting the culture of riding a bicycle, the effects of which will extend beyond the expiry of funds. The project will primarily target the
|
|
Egypt
|
Climate Change Mitigation
|
2005
|
16,979.45
|
Phase 2
|
Project Number: EGY-04-135 |
disseminating renewable energy technology in Tayba and other villages through implementing upgraded ovens and solar heaters Train 3 technicians and 3 builders to install these technologies and be in charge of the maintenance.install 55 solar ( ... )
s and 50 upgraded ovens
improving the energy efficincy and reducing the consumption.
reducing the emissions of green houses gases to limit global warming phenomenmon
To protect the environment through minimize the negative impacts from using traditional methods and energy sources
To remove the barriers and facilitate the use of new & renewable energy and reduce the cost of the units for the
|
|
Mexico
|
Biodiversity
|
2005
|
11,845.57
|
Phase 3
|
Project Number: MEX/05/33 |
La rehabilitación de las parcelas agroforestales afectados por el huracán, el propósito de este proyecto es la obtención de recursos para la sociedad y el trabajo que se defiendan de la catástrofe atmosférica discute alternativas de siembra ( ... )
tos mejoradores del suelo de una manera sistemática, la instalación de sistemas de riego para hacer frente a la sequía que por lo general sigue los huracanes . La alternativa es una combinación de los desagües con pozos de absorción. Los drenajes canalizaría el agua dejada por los huracanes hacia pozos de absorción, sino también los pozos podrían operar en el futuro también para las
|
|
Indonesia
|
Biodiversity
|
2005
|
6,000.00
|
Phase 2
|
Project Number: INDO/05/73 |
Project development Goal:
Documentation of workshop proceeding and needs assessment for reconstruction of coastal livelihoods in Tsunami affected areas in Aceh.
Project Objectives:
1. To facilitate the process of institutional ( ... )
thening among Panglima Laot members as institution and membership based organization among fisherfolks and coastal communities
2. To map the immediate and long term plans for life reconstruction among coastal community in Aceh, especially in Western Coast (Meulaboh) and Simelue.
3. To document the results of the meeting as base line data for reconstruction of coastal community livelihood and
|
|
Romania
|
Biodiversity
|
2005
|
34,913.00
|
Phase 3
|
Project Number: ROM/05/14 |
Positioned at top of food chain in the Black Sea ecosystem, dolphins have been particularly vulnerable to a wide range of threats, both intentional and unintentional, derived from a large number of human activities carried out on land or in the sea ( ... )
. After being hunted at industrial scale between 1950's and 1980's by specialized fleets of all riparian countries, the populations of all three species, namely common bottlenose dolphin - Tursiops truncatus, short-beaked common dolphin - Delphinus delphis, and harbour porpoise - Phocoena phocoena) dropped dramatically to merely 4% of their original total number estimated at 2000.000. With
|
|
Albania
|
Biodiversity
|
2005
|
960.00
|
Phase 2
|
Project Number: ALB/05/05 |
This minigrant will support the collection and display of photographic documentation of domestic breeds of bovine, ovine, pigs, and goats that are autochthonous to Albania and the region. The project will be implemented by a group of students of the ( ... )
of Veterinary as part of a semester
|
|
Poland
|
Biodiversity
|
2005
|
16,592.00
|
Phase 2
|
Project Number: POL/04/29 |
Dormices (Gliridae) are not so well known from the scientific and people's point of view.3 of them are on the Red List of endangered species in Poland (fat doormouse - Glis glis,,forest doormouse - Dryomys nitedula,,garden domouse - Eliomys ( ... )
us), protected by Bern Convention, garden domouse also is on the Red List of IUCN and Habitat Directive of EU..Hiden night life-style is one of reasons of the lack of proper knowledge about these species.The lack of hollow trees - the lack of proper hatch place is one ot the main threat to these mammals. Project is aimed in active protection of door-mouse and garden domouse by increasing
|
|
Mali
|
Biodiversity
|
2005
|
25,610.00
|
Phase 2
|
Project Number: MLI/04/22 |
Contribuer a consolider les acquis du projet de biodiversite prealablement mis en oeuvre dans la commune rurale de Doumba en vue d'ameliorer les conditions de vie des femmes et leur pouvoir economique
les activites sont ( ... )
ormation/sensibilisation des familles sur les questions genre, les promotions des femmes, les themes du FEM et la necessite de sauvegarder les essences en voie de disparition ;
renforcement des capacités des acteurs en techniques et technologiques ;
formation/recyclage des exploitants ;
la formation/alphabétisation des leaders des groupements villageois féminins? ; production des plants en
|
|
Zimbabwe
|
Land Degradation
|
2005
|
43,313.15
|
Phase 3
|
Project Number: ZIM/SGP/OP3/Y1/CORE/2005/08 |
1.0 PROJECT RATIONALE
Environmental degradation is increasingly becoming a major threat to human life in the semi-arid areas of Zimbabwe. This has been due to lack of sound environmental management systems at community level and unsustainable ( ... )
ltural farming practices and the ever-increasing population density in most communal areas of Zimbabwe where 60% of the country's population resides. This has resulted in between 50 - 80 tonnes of of soil per hectare being lost and deposited in the country's water courses(Draft National Environment Policy, 2003) resulting in the siltation of major intranational rivers.
Save is one of the
|
|
Albania
|
Land Degradation
|
2005
|
1,000.00
|
Phase 3
|
Project Number: ALB/05/09 |
Land erosion in the last decade represents one of the most serious threats to ecosystems, biodiversity, and development in Albania. Uncontrolled harvesting and grazing, conversion of agricultural land for inappropriate agricultural use or other ( ... )
of development, uncontrolled usage and poor forest management, are some examples of unsustainable land management practices very common in the country, which are leading to severe land degradation. In these conditions, it is necessary to understand the impact of our actions over the land and to look for land usage and management alternatives.
The objective of Earth Day is to force the
|
|
Suriname
|
Biodiversity
|
2005
|
49,860.00
|
Phase 3
|
Project Number: SUR/05/02 |
The main objective of the project is to provide the community of Bigi Poika with a vehicle to make use in a sustainable way of the Coesewijne Nature Reserve and to help conserve it through eco tourism. This while providing an oopportunity for ( ... )
ent job creation and preservation of indigenous
|
|
Kazakhstan
|
Biodiversity
|
2005
|
20,378.00
|
Phase 3
|
Project Number: KAZ/05/23 |
At present time due to chaotic development of tourism in Akmola area negative anthropogenic impact on the unique lakes of the region has increased, and this may lead to that the Shalkar lake can be lost. The Kokshetau National Park management ( ... )
ly equips the territory with modern services and utilities for amateur tourists, but before the tourist season opens, the work needs to be carried out anew, as the wooden constructions are used for firewood by tourists, the coasts of the lakes are polluted with the dust, the trees are felled.
The project aims at conservation and rehabilitation of biodiversity of the forest, mountain and lake
|
|
Mauritius
|
Climate Change Mitigation
|
2005
|
971.00
|
Phase 3
|
Project Number: MAR/SGP/OP3/07 |
The project which addresses poverty alleviation through capacity building by development of skills in recycling of solid waste and at the same time mitigating an existing national environmental problem. The solid waste would be converted into ( ... )
rafts and tourist souvenir items, some of the items would be inspired from the local Rivulet Terre- Rouge Estuary Bird Sanctuary (Ramsar site), in line with other projects being currently developed for Roche Bois. This would thus address the climate change focal area of the GEF, by decreasing the quantity of waste going to the landfill and thus amount of greenhouse gases, while at the same time
|
|
Barbados
|
Biodiversity
|
2005
|
2,000.00
|
Phase 3
|
Project Number: BAR/OP3/YEAR 1/05/09 |
This project is presented by the Antigua Fisheries? Alliance Inc. in partnership with the St. John?s Fishermen Cooperative Society Ltd. with support from the Government of Antigua and Barbuda.
The project combines aquaculture and hydroponics into ( ... )
culture/aquaponics system where specific species of fish are farmed and the waste from the ponds are used to grow vegetables and other crops. This project is presented as an option to fishermen who are overfishing the inshore waters of Antigua/Barbuda and as an example of biological recyling, albeit in a hybrid environment. If successful, this project has the potential for replication and
|
|
Poland
|
Biodiversity
|
2005
|
44,908.00
|
Phase 3
|
Project Number: POL/05/15 |
|
|
Botswana
|
Biodiversity
|
2005
|
20,617.31
|
Phase 2
|
Project Number: BOT/98/G52/05/02 |
The purpose of the project will be to i) compile an inventory of dung bettles from each of the major climatic and edaphic regions in Botswana; ii) provide the National Museum of Botswana with in identified reference collection of all species ( ... )
ted during the survey; iii) assess ecological species rechnicess and abundance of the dung bettle species assemblages in major conservation areas in order to provide a baseline of ecological data on their populations and interactions; iv) analyse biogeographical patterns and to determine regional of high dung bettle endemicity in Botswana and v) forge links with other stakeholders such as
|
|
Mongolia
|
Biodiversity
|
2005
|
5,055.00
|
Phase 2
|
Project Number: MON/04/27 |
As the country has been undergoing major reforms to shift into a market economy, school teaching programmes are also being renewed to shift to 11year study for school children. As the study on ecology is incorporated in several different subjects of ( ... )
teaching pragrammes, there is no special or independent subject on ecology alone. This grant is to develop a Programme for Ecological Education for school children, to establish Eco-cabinet at Tsetserleg high school, and to involve school children in protecting Bulgan Mountain Nature Reserve. Posters and teaching materials are being developed to be tested in Tsetserleg high school. More will be
|
|
Romania
|
Biodiversity
|
2005
|
24,745.00
|
Phase 3
|
Project Number: ROM/05/17 |
The project aims to secure a sustainable development of the Bistrita Valley through non-biodegradable waste management, complemented by practical activities designed to protect the ecosystems within this micro-region. Main activities consist of: ( ... )
business plan for tourist pension owners, selective waste collection and compacting of non-biodegradable waste from pensions; involvement of pension owners in reestablishing the integrity of several forest and aquatic ecosystems damaged by non-biodegradable waste deposits in the Bistrita River basin; promotion of ecotourism attractions of the region, i.e. ecotourism routes in the Calimani
|
|
Romania
|
Biodiversity
|
2005
|
766.25
|
Phase 2
|
Project Number: ROM/05/06 |
The planning grant will be used for the organisation of meetings with local public and environmental authorities, and with community members. These will result in participatory establishment of the project?s baseline, in the development of a ( ... )
ss plan for Bistrita Valley region, and in improvement of the project proposal.
|
|