There are 27,190 projects available.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Lao
|
Community Based Adaptation
|
2011
|
39,300.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: LAO/MAP-CBA/2010-CBA/5 |
|
The project will achieve this objective by investing its efforts in achieving the sustainable management of natural resource such as;
1. the waters and fisheries of the Sesongsoy river,
2. the riparian woodland and Sacred Forest which provide ( ... )
tion to these resources and non
timber forest products to the village populations
3. and in maintaining the fertility and structure of the soil which supports the subsistence agriculture
on which these villages rely.
The project will promote and train farmers in ecologically sound agricultural production methods, the use of seed varieties that will increase crop yields and will
|
|
|
South africa
|
Land Degradation
|
2011
|
50,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: SAF/SGP/OP5/STAR/LD/11/03 |
|
The project is meant to enhance the rehabilitation of the rangelands and natural pastures, promote the sustainable environmental management and biodiversity, rehabilitation of the dongas and water channels to mitigate land degradation, introduce the ( ... )
nce of good farming practices amongst communal and resource poor farmers.
|
|
|
Malaysia
|
Biodiversity
|
2011
|
50,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: MAL/SGP/OP5/STAR/BD/11/03 |
|
Bukit Peninjau of Mount Serambu, located some 20km from the capital of Sarawak, lies the site of the cottage built by Rajah Brooke between 1848-1850, to escape the heat of Kuching. Bung Muan, located halfway of Bukit Peninjau, is the former site of ( ... )
ancestral villages of the Serambu ethnic Bidayuhs in the Bau Distric of Sarawak. It was also in Peninjau where the world famous naturalist, Alfred Russel Wallace (1823-1913) had stayed back in 1855 and had described it in exuberant detail in The Malay Archipelago. These historical events along with the abundance natural resources available here attracted many visitors from afar. However, due to
|
|
|
Nepal
|
Climate Change Mitigation
|
2011
|
14,960.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: NEP/SGP/OP5/CORE/CC/11/07 |
|
Southern and Eastern parts of Bara district are one of the most firewood deficit areas of Nepal. Due to the firewood crisis, local people are forced to burn agricultural residues, cattle dung and fallen leaves to meet their fuel requirement for ( ... )
g and heating purposes. Excessive use of the biomass has resulted in extreme carbon emission from the local households, sometimes resulting in fire hazards. Traditionally, women are mainly responsible and therefore involved in collecting fuel sources that has added an additional drudgery to them. Their time for searching livelihood options are also engaged turning in to living with many
|
|
|
Dominica
|
International Waters
|
2011
|
25,110.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: DMA/SGP/OP4/Y3/CORE/10/10 |
|
Rodney?s Rock area is a historical site with other natural attractions to provide visitors with a special and different experience. It can become a flagship site in Dominica but must be improved to meet required standards for health, environmental ( ... )
, insurance, planning and certification from the Discover Dominica Authority to allow for organised tours and activities such as snorkelling and diving.
The objectives of the project are:
- To refurbish, extend and upgrade facilities at the Rodney?s Rock as an eco-tourism site.
- To install fencing and security lights for better management and security.
- To train persons and build
|
|
|
Cambodia
|
Community Based Adaptation
|
2011
|
48,209.50
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2011/31 |
|
The project on improved natural resources and food security of rural poor households in Svay Rieng province in the context of climate change was developed in a participatory approach among stakeholders such as, villagers, commune council and ( ... )
ity based organization that their living condition is affecting to the current climate change.
The project is about climate change adaptation strategies in term of natural resources and food security improvement. There are 03 component proposed such as, (1) improving natural resources through promoting local forest conservation, (2) improve access to water resource for life and livelihood and
|
|
|
Uruguay
|
Biodiversity
|
2011
|
34,337.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: URY/SGP/OP5/CORE/BD/11/04 |
|
El proyecto se propone contribuir a la conservación de los ecosistemas y el patrimonio histórico-cultural en el área de influencia de la zona conocida como ?Saladero Guaviyú?, a través de la consolidación de un plan de turismo ecocultural ( ... )
stentable de gestión mixta asociada al turismo termal a nivel del departamento de Paysandú. Se realizará la ubicación y valoración patrimonial de los vestigios arqueológicos, y se trabajará en la conservación de la flora nativa en 13 hectáreas del predio del saladero, mediante su puesta en valor en un plan de ecoturismo
|
|
|
Mongolia
|
Biodiversity
|
2011
|
7,335.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: MON/SGP/OP4/Y3/RAF/10/15 |
|
This project intends to support Murun river bank ecosystem in a particular section close to Muren sum centre to further demonstrate the use and benefit of fruit tree grove which will be created by the grant, to both river bank ecosystem and ( ... )
ement of local livelihoods by making the sea buckthorn fruit grove as a new income source in 2-3 years.
|
|
|
Nicaragua
|
Climate Change Mitigation
|
2011
|
7,700.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: NIC/SGP/OP5/CORE/CC/2011/04 |
|
Construccion de 72 sistemas de filtro y drenaje, como parte de la iniciativa de saneamiento de las aguas grises y negras en cada una de las familiaas beneficiarias, la construccion de 45 fogones mejorados, así como el establecimiento de un vivero ( ... )
tario de 25,000 plantas manejado por las mujeres de la
|
|
|
Nigeria
|
Biodiversity
|
2011
|
29,000.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: NGA/SGP/OP4/Y3/CORE/2010/027 |
|
The project seeks to stop the dumping of toxic industrial wastes, use of organic pollutants in the lower River Niger steams and ponds from Onitsha and to restore and improve the fresh water resources and ecosystem for sustainable development.
The ( ... )
g of harmful industrial & organic pollutants into the river by industrialists, especially textile and chemical industries in Onitsha urban has led to near depletion of the aquatic lives in the river and destruction of the entire ecosystem thereby endangering the whole environment for sustainability. The continuous dumping of toxic waste in the lower Niger has already threatened the livelihood of
|
|
|
Turkiye
|
Climate Change Mitigation
|
2011
|
20,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: TUR/SGP/OP5/STAR/CC/11/05 |
|
The general purpose of the project is growing energy efficiency and by this way reducing both CO2 emission and invoice costs at the socio-economically disadvantaged rural area of Ankara, which is Mamak.
Project?s strategy is to direct people ( ... )
s energy efficiency is studying with mothers and their children with an hands on education program. Participants are going to learn about generating electricity and alternative energy sources, generate electrical energy, learn about areas that they can grow energy efficiency, explore applications that uses electricity and reduce their waste by studying on a simulator and wary of wasting energy
|
|
|
Mongolia
|
Biodiversity
|
2011
|
4,398.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: MON/SGP/OP4/Y3/RAF/11/17 |
|
The CBO will make an artificial pasture for bees to support their bee keeping activity by creating a fruit grove as an experiment or pilot activity in Orhon soum of Darkhan-Uul aimag. |
|
|
Honduras
|
Land Degradation
|
2011
|
28,536.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: HND/SGP/OP5/CORE/LD/11/02 |
|
Con el proyecto propuesto a PPD se pretende contribuir e la disminución de la degradación del ambiente, fortaleciendo la capacidad de las personas para desarrollar actividades productivas con un enfoque agroecológico, de esta manera se pretende ( ... )
ar seguridad alimentaria en primera instancia, generar otro tipo de actividades y mejores ingresos a mediano y largo plazo, pero todo lo anterior se busca asegurar con el trabajo de fortalecimiento de estructuras organizativas de base orientando hacia la soberanía
|
|
|
Nicaragua
|
Biodiversity
|
2011
|
18,500.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: NIC/SGP/OP5/CORE/BD/2011/07 |
|
Mejorar las condiciones del sitio Ramsar Lago de Apanás, con el objeto de facilitar la visita por parte de turistas, dotando de infraestructura, equipamiento y capacidades a las familias pescadoras de la cooperativa y desarrollar un programa de ( ... )
ilización ambiental con énfasis en turismo
|
|
|
Lesotho
|
Land Degradation Land Degradation Land Degradation
|
2011
|
28,374.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: LSO/SGP/OP5/Y1/CORE/LD/11/01 |
|
The targeted wetlands are in various stages of degradation and desiccation, resultant in reductions in the flow of ?Maletsunyane River. The degradation is caused by overgrazing, trampling, numerous footpaths and erection of water pipes, the ( ... )
chment of agricultural land and settlements and lack of adequate wetland vegetation cover resulting in high water velocities, which combined with the presence of numerous footpaths, contribute to erosion. The consequence is decreased infiltration which in turn exposes wetlands to greater risks from erosion. The impacts are (a) desiccation of the wetlands and (b) increased levels of sediment loss
|
|
|
Guinea
|
Chemicals
|
2011
|
30,650.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: GIN/SGP/OP5/CORE/CH/11/03 |
|
Sensibilisation et formation des agriculteurs et des femmes leaders sur les pesticides, mise en place d?un mécanisme de gestion des emballages, appui aux communautés à travers la fourniture des équipements complets de pulvérisation. |
|
|
Cabo verde
|
Chemicals
|
2011
|
18,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CPV/SGP/OP5/CORE/CH/11/08 |
|
Cape Verde has drafted its National Action Plan for implementation and management of Persistent Organic Pollutants (POPs). The development of agriculture and thus the use of pesticides must integrate POPs prevention. In fact the use of POPs in a ( ... )
e environment like Cape Verde may have irreversible effects on soil, ground and surface water, sea and marine species contamination. This can cause serious negative impacts on human health from contamination of vegetables for example, and therefore implicate derailed economic development.
This project aims to respond to the stated challenges and will contribute to the dissemination process of
|
|
|
Gambia
|
Climate Change Mitigation
|
2011
|
5,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: GMB/SGP/OP5/Y1/CORE/CC/11/09 |
|
The project aimed to enhance the understanding of students on climate change issues and its adverse effects on agriculture, fisheries, forestry, woodland ecosystems, health, rangelands, livestock and water resources. As a youthful audience, students ( ... )
or players in promoting understanding the phenomena of climate change and its impacts on communities. The impacts of the project are expected to be long lasting and fostering a greater of its effects can play a major role in bringing about changes in behaviours and coping strategies by this younger generation.
|
|
|
Panama
|
Biodiversity
|
2011
|
14,000.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: PAN/SGP/OP4/Y3/RAF/10/27 |
|
Establecer un proceso de siembra de borojó en 10 hectáreas en la comunidad de Puerto Indio, Sambú, para mejorar la calidad de vida y contribuir al mejoramiento económico en la producción de vino, jalea, mermelada y la vivencia de la comunidad y ( ... )
ura conservando el medio
|
|
|
Ukraine
|
Climate Change Mitigation
|
2011
|
49,856.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: UKR/SGP/OP4/Y3/RAF/2010/32 |
|
One of the obstacles on the way of energy consumption decreasing in our economy is the absence of stimuli for energy saving and lack of obligatory energy consumption metering when planning energy spending in state bodies and budget institutions. ( ... )
ng energy consumption and lowering energy waste is possible only if you have a well-developed and effective system for energy calculation. At the same time, most people do not realize the interconnection between climate change and energy consumption. Moreover, most people consider energy saving measures being very expensive and difficult. The aim of the present project is to lower energy losses
|
|
|