There are 27,190 projects available.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Kazakhstan
|
Land Degradation
|
2006
|
5,600.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: KAZ/06/04 |
|
Tanat village is located in the eastern part of the country. Population is 800 people; 17 farming facilities are located here. They own 6500 hectares of pastures. The problem is that the pastures are intensively exhausted from year to year, as the ( ... )
is constantly grazed on the same pastures. The main criteria for choosing pastures is water availability.
Now there?s a strong need for rehabilitation of the pastures being used for so long time. There are pastures round the village, where there is a dense herbage, but there are no watering places for the cattle. In this connection it is necessary to drill a well to create artificial source
|
|
|
Lithuania
|
Biodiversity
|
2006
|
1,705.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: LIT/05/17 |
|
The NGO is planning to prepare full-size project on Aukstumale wetland (the Nemunas Delta's Regional Park, Silute district) management.
Some baseline data and situation analysis is missing. The planning grant will be used for the: 1) Baseline ( ... )
is and basic project feasibility study; 2) Establishment of partnership (round-table meeting) with local and national stakeholders, invited in regard to the project area, and 3) Involvement of the communities through the clarification of their needs and their integration into the project activities.
On a basis of the collected information the activities of the full-size grant will be
|
|
|
Belarus
|
Land Degradation
|
2006
|
26,928.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: BLR/OP3/2/06/01 |
|
To determine 7 most environmentally dangerous sand-pits and restore them by the means of forestation To create a map of degraded lands of Baranovichi district To develop restoration activities together with Baranovichi district administration for ( ... )
andoned sand-pits. To publish and disseminate information materials on project
|
|
|
Lithuania
|
International Waters International Waters
|
2006
|
20,852.73
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: LIT/OP3/02/06/09 |
|
Aukstumala raised bog being a unique wetland based in the Nemunas delta distinguishes for rich biodiversity and habitats. Natural part of the bog 1017 ha belongs to preserve, the other part 1500 ha is a peat bog, exploitation of which has negative ( ... )
on the bog. The whole wetland area belongs to Nemunas Delta Regional Park which is included in the list of Natura 2000. Also the park and Aukstumala bog is included in the list of Convention on Wetlands of International Importance Especially as Waterfowl Habitat (Ramsar Convention).
Present stage of Aukstumala is critical as the natural water regime is influenced by the ditches, which drain the
|
|
|
Palestine, State of
|
Climate Change Mitigation Climate Change Mitigation
|
2006
|
37,112.25
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: PAL/06/82 |
|
Location: Gaza /Bait Lahia
It?s a demonstration project on minimizing the environmental damaging impact of old car tires wastes and burning by reusing these to establish children?s playground in Um Nasser village in the north of Bait Lahia town in ( ... )
rth of Gaza. The project aims at reusing the excessive waste disposal of old car tires to establish 1000 square meters children?s playground in Um Nasser border village with Israel in the northern area of Gaza Strip. Along with equipping the garden with tire-made playing facilities and execute the garden land escaping, the project will also launch tree-planting campaign in the main streets of the
|
|
|
Tanzania
|
Land Degradation
|
2006
|
18,566.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/06/16 |
|
The Mount Kilimanjaro inhabitants ( the Chagga) are known for their local skills in maintaining traditional agroforestry systems over years. However, the sustainability of this system is threatened du eto growing population pressure, failures of the ( ... )
industry and fast changing social- economic dynamics. Due to this economic changes the outcome has been encroachment on the forest leading to environmental degradation and fast growing poverty rates.
The project objective is to increase income and create alternative livelihood opportunities for communities living in the 1000-1700m above sea level zone so as to reduce pressure on protected
|
|
|
Viet nam
|
Biodiversity
|
2006
|
1,998.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: VN/06/005/P |
|
The primary aims of the planning grant are to promote the participation of key stakeholders of the proposed project, including local authorities and relevant agencies and communities, and provide scientific assistance for the project development. ( ... )
activities of the project include conducting surveys on socio-economic conditions of the proposed project site, identifying proposed project objectives and activities and assessing their feasibility, and providing needed technical assistance in project design and writing project proposal which will be submitted to GEF/SGP for review and appraisal; and identifying possibilities for project
|
|
|
North Macedonia
|
Biodiversity
|
2006
|
4,965.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MKD/OP3/02/06/07 |
|
The project is designed to revitalize the habitat of the Yellow water lily (one of the endangered species of Lake Ohrid), by replanting it and by promoting within the local population its value.
Yellow water lily is one of the endangered species ( ... )
e Ohrid which disappeared from many localities in Lake Ohrid and is limited in one part (in the north-west coastline of the Lake) which is under big anthropogenic impact as well. Reduction of the yellow water lily surfaces is a result of intensified drying the lake with intention of increasing the private land. The project aim is to (1) replant in the area of Mazija in the north-east part of the
|
|
|
Thailand
|
Land Degradation
|
2006
|
7,683.31
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: THA/05/23 |
|
Target Population/Location of project:
30 paddy-farming families in a floodplain of the lower Nan River. The project area spans five tambons in Phijit and Phitsanuloke provinces, and is part of an integrated ecosystem of the Gulf of ( ... )
nd/South China Sea. Chemical-intensive paddy farming has led to a decrease in land productivity, an increase in pests, an ever-dwindling number of water species, and community indebtedness. To combat these issues, the community aims to amend both environmental and livelihood practices.
Objectives:
1. Promote and scale up sustainable agricultural practices
2. Conserve water
|
|
|
Samoa
|
Biodiversity
|
2006
|
1,533.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: WSM/OP3/Y1/05/44 |
|
The Komiti Tumama ma Tamaitai of Fogasavaii village are trying to promote not only in Fagosavaii but nationally the replanting f native plants that are used by traditional healers for healing. The project will help to promote the use of traditional ( ... )
g methods, as it will help rural communities who don't have enough money to go to hospitals and more importantly for better health of the
|
|
|
Egypt
|
International Waters
|
2006
|
23,652.17
|
OP3 - Y1 (Mar 05 - Feb 06)
|
|
Project Number: EGY-05-223 |
|
Working towards conservation of the River Nile; Egypt?s primary source of water. The project works with the Bahr Youssef community to recycle water hyacinth from the Nile, using it to produce paper products. This will provide a source of ( ... )
nable income for the community. Capacity building and training activities are also promoted, ensuring long-term sustainability after the project ends. This will be complimented by a series of meetings which will encourage community participation and raise awareness of environmental
|
|
|
Micronesia
|
Multifocal Area
|
2006
|
28,500.00
|
Phase 3
|
|
Project Number: MSP05/010 |
|
Project is to undertake curriculum development with a focus on enhancing field activities and linking to a successful program. The Grantee will work with community members to highlight issues and incorporate into the curriculum which will be ( ... )
d with a few schools before
|
|
|
Micronesia
|
International Waters
|
2006
|
2,000.00
|
Phase 3
|
|
Project Number: MSP05/008 |
|
Using this Planning Grant, WAM aims to develop the full proposal to improve the shoreline protection, re-claim land through natural remediation and expand the site with an implementation of educational and capacity building programs in both ( ... )
trial and marine environmental education.
Per RMI NFP emailed dated 13/08/2012, planning grant was closed
|
|
|
Micronesia
|
Biodiversity
|
2006
|
2,000.00
|
Phase 3
|
|
Project Number: MSP05/013 |
|
|
|
|
Micronesia
|
Climate Change Mitigation Climate Change Mitigation
|
2006
|
44,050.00
|
Phase 3
|
|
Project Number: MSP05/009 |
|
|
|
|
Micronesia
|
Biodiversity
|
2006
|
42,476.00
|
Phase 3
|
|
Project Number: MSP05/012 |
|
This project is to pilot a sustainable handicraft promotional system for RMI that addresses the problems and challenges, starting on 3 atolls (Ailinglaplap, Jaluit, Maloelap), to help sustain the resources and the lives of the people in these ( ... )
. The system will provide:
*technical assistance to the outer island women;
*a distribution channel;
*establish business connections between the outer island women crafters and the handicraft traders on Majuro and Ebeye.
*a website www.wutmi.org;
*nurseries of indigenous trees int eh three attolls that can be used for making handicrafts and preventing coastal erosion.
*seashell collection
|
|
|
Micronesia
|
International Waters
|
2006
|
29,000.00
|
Phase 3
|
|
Project Number: MSP05/011 |
|
The project will pilot the development and wide dissemination of modern educational/public awareness tools such as video and comic books with the full participation of a local community where participation will be in the development of content as ( ... )
s the participation in the decision-making and development of the actual materials. The issue of focus will be related to coastal marine areas and coral reefs and incorporating traditional conservation methods.
|
|
|
Viet nam
|
Biodiversity
|
2006
|
3,746.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: VN/06/007 |
|
Through surveys in some localities after storms number 2, 6 and 7 in 2005, managers, scientists and local authorities showed that damages on dykes and properties during 3 storms number 2, 6 and 7 in 2005 were very substantial. However, places that ( ... )
nd protect mangrove forest would not have their dykes eroded or broken like Bàng La ? Ð? S?n, Vinh Quang ? Tiên Lãng ? H?i Phòng, Thái Ðô-Thái Th?y-Thái Bình.
Preliminary research on types of mangrove forests that reduces drastically the intensity and height of waves when the tide is high, along with the storms in 2005 have demonstrated the importance of mangrove forests in
|
|
|
Fiji
|
Biodiversity
|
2006
|
2,000.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: FJI/01/06 |
|
|
|
|
Guatemala
|
International Waters
|
2006
|
21,733.66
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: GUA/CWI/OP3/02/06/15 |
|
The project consists of building a gravity fed drinking water system, by tapping water from four springs, building two storage tanks and installing distribution pipes, that will provide for 27 households or a total of 165 inhabitants. Each family ( ... )
ave its own water tap.
Project beneficiaries will be trained in the installment and maintenance of the water distribution system. They have set management rules and will form different administration and maintenance committees.
The project also includes reforestation around the water sources, with 1,200 trees on a total area of 1ha.
Protecting the water sources will help conserve the
|
|
|