I. AIM OF THE PROJECT
The aim of the Project is to do reforestation (800 cedar trees) of 50 dunum located on a sloppy area in the upper site of Douma village. Douma is located at 1500-1600 meters above sea level. This area is protected from ( ... )
g by a ministerial decision. It is located on the historical natural cedar forest line.
II. OBJECTIVES
The Project objectives are to:
? increase green spaces
? prevent land erosion
? contribute in reducing climate change
III. ACTIVITIES
? purchase and transport seedlings
? Plant seedlings
? Provide irrigation water for the seedlings
? Maintain the site and follow-up on the
|
|
Brazil
|
Biodiversity
|
2006
|
46,000.00
|
Phase 3
|
Project Number: BRA/06/01 |
Articulation and organization of a socio-technical network to strengthen productive arrangements in the Cerrado of Minas Gerais, focused on ecobusiness, embracing wild collection, agricultural production based on traditional knowledge, and ( ... )
cializing
|
|
Brazil
|
Biodiversity
|
2006
|
30,000.00
|
Phase 3
|
Project Number: BRA/06/16 |
Mid Mato Grosso State is one of the areas with worst current brutal expansion of agribusiness over natural ecosystems, resulting in heavy impacts on native environment (which is converted into homogeneous productive landscapes), on local communities ( ... )
were or are still directly or indirectly under pressure to sell their lands) and on family farmers (who are generally concentrated in agrarian reform settlement projects created since the 1970s).
The project proposes development of a model for sustainable agriculture, contributing to generation of income, social inclusion and improved quality of life for family farmers in Mid Northern Mato
|
|
Brazil
|
Biodiversity
|
2006
|
29,986.05
|
Phase 3
|
Project Number: BRA/06/25 |
The project aims to reinforce the production process, the agro-industrialization and the commercialization of the agroextractive goods produced by COOPEVIDA. This will all be locally and regionally done through the sustainable and solidarity ( ... )
pment strategy of the CCAMA (Maranhão Agroextractive Cooperatives Center) network. The network?s objectives are to increase agro-ecological awareness, conserving the Cerrado biome in the state of Maranhão, increase gender and generation parity, income generation and to ameliorate work conditions.
Specific objectives:
? To build a fair trade marketing stand of the agro-extractive production
|
|
Thailand
|
Chemicals
|
2006
|
5,359.32
|
Phase 3
|
Project Number: THA/05/17 |
Target Population/Location of project:
150 community members from 40 households in Tambol Ranghua, Jombung District, Ratchaburi Province. Target population earns their living by animal husbandry and vegetable-raising; they reside in a ( ... )
ed area of approximately 120 ha in the Mae Klong River basin of the Gulf of Thailand / South China Sea. The Farmer?s Group is trying to reverse land degradation by demonstrating sustainable agriculture.
Objectives:
1. Restore soil stability and fertility in the target location
2. Practice sustainable agriculture: minimize water and conventional energy use
3. Encourage youth group,
|
|
Kenya
|
Multifocal Area
|
2006
|
17,081.00
|
Phase 3
|
Project Number: KEN-CWI-06-02 |
Construction of a water pan, auxiliary and sanitary facilities, technical backstopping, establishment of a tree nursery and community capacity building |
|
Dominican republic
|
Climate Change Mitigation
|
2006
|
17,500.00
|
Phase 3
|
Project Number: DOM/06/01 |
Establecimiento de una agroindustria local de subproductos elaborados con chivas lecheras y la instalacion de un sistema energetico solar para el procesamiento de frutas y posterior venta en la comunidad de El Limon, Provincia San Jose de Ocoa |
|
Mozambique
|
Land Degradation
|
2006
|
8,096.20
|
Phase 3
|
Project Number: MOZ/OP3/Y1/2005/14 |
The high groundwater table of Munhava area sets it as a sensitive habitat that needs careful attention. Soil pollution, land degradation, and environmental cleanliness are major concerns for the area. Inadequate farming practices also put in risk ( ... )
tegrity of the area. The project will address these problems by promoting land degradation mitigation activities, through sanitation and environmental cleanliness, control of spread of cholera during the rainy season, and engagement of women groups in income generation activities. The mainly objective is to build for the neighborhoods of Mananga and Maraza 40 improved latrines and raising
|
|
Poland
|
Climate Change Mitigation
|
2006
|
29,622.00
|
Phase 3
|
Project Number: POL/06/OP3/13 |
Krzyzowki village is located in mountain valley. Stream with trouts, brook minnows and gudgeons flows through the middle of the valley.
In past, solar collectors have been installed in school, thanks to previous financial assistance of GEF/SFP. ( ... )
ctivity was the beginning of "Rural Center for Ecological Education" creation,
The main aims of the current project:
1. organization of training for local community about environment protection (to demonstrate possibilities of usage of renewable energy in villages);
2. installation of 20 solar collectors for residents of
|
|
Egypt
|
Climate Change Mitigation
|
2006
|
26,068.94
|
Phase 3
|
Project Number: EGY-06-269 |
Reducing emissions from the electricity generation process through rationalizing energy consumption and integrating energy-saving lamps into the Bani Suef governorate. The cost of these lamps will be paid back in small installments, making them ( ... )
able for the whole community. At the same time, awareness about the importance and proper use of the lamps will be spread. This will limit the burning of fossil fuels and urge the local community to adopt better methods of living, which in turn will reduce the effects of greenhouse gas emissions and instill better atmospheric conditions in the target
|
|
Jamaica
|
Climate Change Mitigation
|
2006
|
25,440.00
|
Phase 3
|
Project Number: JAM/06/04 |
The rising cost and consumption of oil in Jamaica is an expensive and an environmentally unhealthy practice. At the moment Jamaica spends nearly $US1 billion to procure oil from OPEC countries. While it is no secret that use of fossil fuels have ( ... )
inked to global warming and is the main contributor of human led global climate change, very little is being done on the ground to mitigate its effects.
Global climate change will be especially drastic for low-lying island states such as Jamaica and our neighbours. Already rising sea levels, warming sea temperatures and extreme weather conditions are wreaking havoc on our delicate ecosystems
|
|
Zimbabwe
|
Climate Change Mitigation Land Degradation
|
2006
|
30,250.00
|
Phase 3
|
Project Number: ZIM/SGP/OP3/Y2/CORE/2006/05 |
background
The project will be implemented in ward 2 , Avilla in Nyanga district. Due to climate change the area has been experiencing severe droughts. in response to droughts and the attendant economic hardships some community members in ward 2 ( ... )
sorted to gold panning along the Rwenya river and its tributaries. gold panning and the expansion of the farming area close to the river has contributed towards erosion and desertification.erosion resulting in the development of gullies is exacerbated by the impact of cattle which tend to follow the same tracks as they go to the watering points particularly during the dry season.households in the
|
|
Ethiopia
|
Biodiversity Land Degradation
|
2006
|
44,900.00
|
Phase 3
|
Project Number: ETH/RNE/06/002 |
The project focuses on providing support to the local communities, their local experts and administrators in 4 kebeles (Shelle Mela, Genta Kenchema, Genta Meyche and Genta Bonke) in Arba Minch Zuria Woreda of Gamu Zone in Southern Nations, ( ... )
alities and Peoples Regional State. The overall goal of the project is to help the local communities combat climate change and rehabilitate their environments, including improving their crop production through an organic approach. The global impact will be the conservation and sustainable use of the local biodiversity, and particularly the maintenance of the rich bird diversity of the area. The
|
|
Uganda
|
Biodiversity
|
2006
|
2,000.00
|
Phase 3
|
Project Number: UGA/06/64 |
Kageye members in the recent past noted with serious concern the continuous bad trend in Wakiso District of:
? Land degradation through surface run-offs along roads and farms. The run-offs have resulted into a semi-productive land since the fertile ( ... )
s are washed away into valleys ending up to local rivers, namely Kageye Rubigi and Namatovu. These local rivers eventually converge into River Mayanja which also carries the collected silt into river Nile in Lake Kyoga.
? Biodiversity loss ? Disappearance of high canopy trees like Mvule, Cinnamonum (Budalasini), Maesopsis eminii (Musizi) and Podocapus that used to be a habitat for the now
|
|
Ethiopia
|
Biodiversity Climate Change Mitigation Land Degradation
|
2006
|
43,850.00
|
Phase 3
|
Project Number: ETH/RNE/06/003 |
The project addresses problems of land degradation especially indigenous plants and contributes to climate change mitigation through promotion of integrated sustainable land and natural resource management practices and efficient wood saving ( ... )
logies. The general development goal of this project is to halt land degradation and improve the vegetation coverage and to protect the biodiversity loss in the project
|
|
Mongolia
|
Land Degradation
|
2006
|
3,936.00
|
Phase 3
|
Project Number: MON/06/24 |
The project proponent intends to combat land degradation by establishing a field-protecting forest-belt. Also within the project framework a small tree plantation will be established for further expansion of Herlen soum?s green belt. |
|
Namibia
|
Land Degradation
|
2006
|
2,000.00
|
Phase 3
|
Project Number: Nam-OP3-1-06-02 |
The goal of this project is to take in hand the evident human influenced land degradation in Maltahohe via the revitalization and rehabilitation of this village?s degraded land through soil conservation and reforestation activities. Maltahohe is a ( ... )
e situated, approximately 113 kilometers from the town of Mariental within the Gibeon constituency, in the fragile ecosystems of Southern Namibia.
The proponents of this project will create green spaces and/or community forests which apart from contributing to the aesthetic quality of the village will also have enormous socio economic and environmental benefits to the
|
|
Barbados
|
Land Degradation
|
2006
|
21,976.00
|
Phase 3
|
Project Number: BAR/OP3/YEAR2/06/10 |
The goal of this project is to "equip Saint Lucian farmers with the tools of organic and sustainable land management practices through the promotion of soil conservation, soil regeneration, and participatory planning systems for sustainable land ( ... )
he proposed project activities include:
? The establishment of one acre in demonstrations plots around the island managed by select farmers who will be trained in organic farming techniques. These sites will serve as demonstration farms for viewing by farmers and the general public.
? The hosting of four introductory training and capacity building workshops on principles of organic farm
|
|
Mongolia
|
Land Degradation
|
2006
|
14,636.00
|
Phase 3
|
Project Number: MON/06/05 |
The project will construct a community dam and establish an artificial pond in Sergelen soum of Tuv province in order to combat pastureland degradation by accumulating rainfall and now melt waters. |
|
Kazakhstan
|
Land Degradation
|
2006
|
5,474.00
|
Phase 3
|
Project Number: KAZ/06/13 |
Akkol settlement is located in Talas area. Over 2500 people live there, 54 farming companies work there. The settlement is located in semi-desert zone. The main problem for inhabitants of the village is lack of water for irrigation. The sowing ( ... )
s round the village are degraded, the sown area doesn?t yield harvest because of its strong salinity.
The project is aimed at raising pastures productivity through water supply of these sites.
The project tasks are: (i) improvement of irrigational system to supply the pastures with water through mobilization of population on refinement of Zhanatogan canal, (ii) Carrying out of information
|
|