There are 29,070 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Thailand
|
Biodiversity
|
2004
|
22,392.33
|
Phase 2
|
Project Number: THA/04/04 |
Project location/Targeted Population:
Situated in the Indo-Chinese sub region of the bio-unit, the target location represents an integrated part of forest ecosystems and fresh water ecosystems. Target population comprising local Thai and ( ... )
ethnic minority groups ,i.e. the Kareni , Lahu and Mien , dwell in the vicinity of Jae Sorn National Park and Mae Suk Mae Soi National Forest. Paddy farming, husbandry, cash crop , forest products and general services are sources of income and livelihood. Especially, the Kareni traditional rotating cultivation has preserved more than 50 endemic species. Daily energy ranges from grid electricity,
|
|
Kenya
|
Biodiversity
|
2004
|
7,901.00
|
Phase 2
|
Project Number: KEN/UNF-GEF/04/06 |
This project is the continuation of the "Planting indigenous trees for Mt. Kenya forests using primary and secondary schools around Mt. Kenya"project (KEN/UNF-GEF/02/03 ).
The project will involve both primary and secondary school children in tree ( ... )
g activities and conservation programmes aimed at awareness raising with a view of conserving the Mt. Kenya forests.
FENCOM will:
(1) Mobilize communities and identify casual labourers
(2) Supervise labourers to spot clear and do pitting for 60 ha
(3) Organise to transport seedlings from the tree nurseries to the forest station and from the forest station to the planting site.
(4) Supervise
|
|
Kenya
|
International Waters
|
2004
|
35,512.50
|
Phase 2
|
Project Number: KEN-GEF-04-022 |
Situated on the Kenya Tanzania boundary in Taita Taveta district, the 30 sq km Lake Jipe is dying. The lake has lost about 50 % of its water mass within the last 10 years, due to siltation caused by destruction of the water catchment are and ( ... )
nds, proliferation of the typha weed, and diversion of fresh water recharge from river Lumi. The lake has increasing salinity, decreasing depth and biodiversity. Hippos and crocodiles have migrated upstream due to salinity. The lake is of global importance and the only place in the world where the fish Oreochromis jipe is found, and which is on the verge of extinction. In a joint effort to
|
|
Kenya
|
International Waters
|
2004
|
14,942.50
|
Phase 2
|
Project Number: KEN-GEF-04-023 |
Situated on the Kenya Tanzania boundary in Taita Taveta district, the 30 sq km Lake Jipe is dying. The lake has lost about 50 % of its water mass within the last 10 years, due to siltation caused by destruction of the water catchment are and ( ... )
nds, proliferation of the typha weed, and diversion of fresh water recharge from river Lumi. The lake has increasing salinity, decreasing depth and biodiversity. Hippos and crocodiles have migrated upstream due to salinity. The lake is of global importance and the only place in the world where the fish Oreochromis jipe is found, and which is on the verge of extinction. In a joint effort to
|
|
Kenya
|
International Waters
|
2004
|
31,844.00
|
Phase 2
|
Project Number: KEN-GEF-04-019 |
Situated on the Kenya Tanzania boundary in Taita Taveta district, the 30 sq km Lake Jipe is dying. The lake has lost about 50 % of its water mass within the last 10 years, due to siltation caused by destruction of the water catchment are and ( ... )
nds, proliferation of the typha weed, and diversion of fresh water recharge from river Lumi. The lake has increasing salinity, decreasing depth and biodiversity. Hippos and crocodiles have migrated upstream due to salinity. The lake is of global importance and the only place in the world where the fish Oreochromis jipe is found, and which is on the verge of extinction. In a joint effort to
|
|
Kenya
|
International Waters
|
2004
|
34,097.00
|
Phase 2
|
Project Number: KEN-GEF-04-021 |
Situated on the Kenya Tanzania boundary in Taita Taveta district, the 30 sq km Lake Jipe is dying. The lake has lost about 50 % of its water mass within the last 10 years, due to siltation caused by destruction of the water catchment are and ( ... )
nds, proliferation of the typha weed, and diversion of fresh water recharge from river Lumi. The lake has increasing salinity, decreasing depth and biodiversity. Hippos and crocodiles have migrated upstream due to salinity. The lake is of global importance and the only place in the world where the fish Oreochromis jipe is found, and which is on the verge of extinction. In a joint effort to
|
|
Kenya
|
International Waters
|
2004
|
28,703.00
|
Phase 2
|
Project Number: KEN-GEF-04-020 |
Situated on the Kenya Tanzania boundary in Taita Taveta district, the 30 sq km Lake Jipe is dying. The lake has lost about 50 % of its water mass within the last 10 years, due to siltation caused by destruction of the water catchment are and ( ... )
nds, proliferation of the typha weed, and diversion of fresh water recharge from river Lumi. The lake has increasing salinity, decreasing depth and biodiversity. Hippos and crocodiles have migrated upstream due to salinity. The lake is of global importance and the only place in the world where the fish Oreochromis jipe is found, and which is on the verge of extinction. In a joint effort to
|
|
Sri lanka
|
Land Degradation
|
2004
|
8,635.00
|
Phase 2
|
Project Number: SRL/04/12 |
Awareness raising of communitites on high degradation afffects on forsts, land and riverbanks due to gem mining, rehabilitate degraded land to agriculturally viable land and eliminate factors that give rise to malaria and other vector diseases due ( ... )
er stagnation in abandoned gem pits.
The propsed project area is the catchments of the major irrigation scheme, Kumbukan Oya in the Moneragala district. The mitigation of land degradation in the upper catchments will be highly effected to the irrigation project and its sustainability. The project will also emphasize the additional income generating activites such as introduction of proper
|
|
Kenya
|
Biodiversity
|
2004
|
46,336.00
|
Phase 1
|
Project Number: KEN/UNF-GEF/04/12 |
The project endeavors to mobilize communities around 7 traditional sacred sites all situated around the Mt Kenya World Heritage Site to reclaim, demarcate and conserve them for posterity. This will also sustain their significance as important ( ... )
nial localities for the different communities when performing religious and traditional rituals.
Other activities include re-afforestation, gazetting of the sites and erecting signage and spreading publicity.
|
|
Thailand
|
Climate Change Mitigation
|
2004
|
10,250.51
|
Phase 2
|
Project Number: THA/03/25 |
Farming community effort to initiate energy conservation at household level and reverse degradation trend of ecosystems of Mekhong River, by fabricating and using high efficiency stove, planting native-species tree for firewoods and other use as ( ... )
s producing and using organic compost in agricultural
|
|
Kazakhstan
|
International Waters
|
2004
|
2,000.00
|
Phase 2
|
Project Number: KAZ/04/09 |
Practically all water basins of Kazakhstan are transboundary ones, and each faces pollution problem and lack of water resources. Kazakhstan had signed and ratified a number of conventions and agreements on environment, some of them directly touch ( ... )
problems, such as Convention on protection and use of transboundary water basins, the Frame agreement on water partnership, and others. But international water issues are not enough highlighted in mass media. The project is directed to raising awareness of a wide audience about problems connected to transboundary water resources, and also attraction of the public to the decision of these
|
|
Egypt
|
Biodiversity
|
2004
|
21,241.83
|
Phase 2
|
Project Number: EGY-03-102 |
The objectives of the project are: 1.Contribute in recovery of the natural ecological system of lake Brulus. 2.Contribute to recovering and protecting the biodiversity in the lake 3.Improve the social and economical of the fishermen and their ( ... )
es. 4.Increasing environmental tourism by facilitating the sailing in the lake. 5.Increasing environmental awareness about reservation of the natural resources and protection of the
|
|
Egypt
|
Biodiversity
|
2004
|
21,207.18
|
Phase 2
|
Project Number: EGY-03-124 |
The Purpose:
Rehabilitation of Lake Borollous and improvement of fishermen's income (The water of the lake was freshened as a result of the unblocking of the waterway linking the lake to the Mediterranean. The blockage had caused the reeds to ( ... )
vastly in the Lake, covering 17% of its surface, which led to blocking the water flow, upsetting the ecosystem, decreasing fish resources; threatening biodiversity and handicapping fishing activities)
The objectives of the project are: 1.Contribute in recovery of the natural ecological system of lake Brulus.
2.Contribute to recovering and protecting the biodiversity in the lake
3.Improve
|
|
Sri lanka
|
Climate Change Mitigation
|
2004
|
13,638.50
|
Phase 2
|
Project Number: SRL/04/01 |
Promote awareness on solar spice drying technologies, expand the pilot-scale demonstration models and new market mechanisms, transfer the manufacturing technology to rural workshops and produce a handbook and to further develop the solar drying ( ... )
logy. The project attempts to promote spice drying based on renewable energy- solar energy with bio mass energy as auxiliary supply. Solar spice drying technology will improve the income of rural spice producers by enabling them to dry spices in the farm during the rainy harvesting seasons; by eliminating losses from soilage that ususally occur during traditional sun drying; and by obtianing
|
|
Poland
|
Biodiversity
|
2004
|
11,330.00
|
Phase 2
|
Project Number: POL/04/16 |
many old native, local varieties of plants, vegetables were rejected in past decades due to invasion of industrial agriculture, demands from the market for more "economic" varieties. It causes rejection of cultivation of various ( ... )
bles,plants.
Local CBO , womens CBO is ionvolved in restoration of cultivation of Wyszeborski Potato, local, native variety, replaced in past decades by imported varieties. In Bonin, nearby well known Potato Institute knowledge is but no funds to restore well known potato.
Project is targeting one local community- women's CBO in restoring Wyszoborski potato, bringing back to the market
|
|
Cote d'ivoire
|
Biodiversity
|
2004
|
4,140.00
|
Phase 2
|
Project Number: IVC/04/14 |
Le village de Djékekro dans la commune de Toumodi, dispose d'une forêt de 3 ha. Cette forêt est le résultat d'un reboisement fait en 2000 grâce à un financement du micro-FEM. Cette forêt subit des pressions des riverains. De plus elle est ( ... )
©e aux feux de brousse et à l'abattage massif des jeunes arbres.
Ce projet a pour but de produire et d'utiliser rationnellment la biomasse, d'installer et de construire des foyers améliorés à Djèkèkro (Toumodi) en vue de contribuer à la conservation de plantation forestière du village et de permettre à la population locale de disposer d'une source de revenus. En somme, il vise Ã
|
|
Cote d'ivoire
|
Biodiversity
|
2004
|
13,770.00
|
Phase 2
|
Project Number: IVC/04/13 |
Ce projet vient en appui à des activités déjà existantes dans une écoferme créée par la coppérative GMCI depuis 1997, dans la localité de M'Batto.Il s'agit d'un embryon d'écoferme qu'il convient de renforcer pour promouvoir la ( ... )
contre la déforestation et la dégradation des terres. En outre, ce projet a pour objectif de contribuer à la lutte contre la pauvrété par le développemnt de spéculations à haut rendement basé sur l'agriculture écologique. Le renforcement de ce projet portera sur la construction d'un local de formation en agriculture écologique, sur l'aménagement d'étangs piscicoles et sur la
|
|
Mali
|
Multifocal Area
|
2004
|
23,264.30
|
Phase 2
|
Project Number: MLI/04/18 |
Ce projet vise a accroitre la visibilité et une meilleure connaissance du PPS/FEM aux niveaux local et national.
Les principales activités sont :
-conception d?un document sur les acquis du programme
-confection des produits ( ... )
itaires
-distribution des
|
|
Niger
|
Multifocal Area
|
2004
|
12,129.00
|
Phase 2
|
Project Number: NER/SGP/OP2/CORE/MF/2004/09 |
|
|
Morocco
|
Multifocal Area
|
2004
|
50,000.00
|
Phase 2
|
Project Number: MOR/03/11 |
Ce projet vise a contribuer a la conservation de la Réserve de Biosphere de l?Arganeraie (RBA), a travers le renforcement des capacités de 150 associations de développement local, faisant partie du Réseau des Associations de la RBA (RARBA). La ( ... )
re catégorie d?activités du projet, en lien avec le renforcement institutionnel du réseau, consistera a élaborer un plan de communication, a produire des outils de communication sur la gestion des ressources naturelles, a créer et renforcer les structures institutionnelles du réseau et a mettre en place un mécanisme durable d?autofinancement du réseau. La seconde catégorie d?activités,
|
|