There are 29,070 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Ghana
|
Biodiversity
|
2001
|
1,600.00
|
Phase 2
|
Project Number: GHA/00/057 |
The NGO was to use PRA to gather baseline socio-economic data and biodiversity baseline data that can be used to develop a project proposal for sustainably managing the natural resources in the Tuluwe area of the Northern Region of Ghana. |
|
Malaysia
|
Multifocal Area
|
2001
|
2,000.00
|
Phase 2
|
Project Number: MAL/00/07 |
Development of a full project proposal through a stakeholder workshop and interviews conducted with the concerned stakeholders, undertaking an initial survey of the two proposed project sites (watershed areas) in Petaling Jaya, Selangor, including ( ... )
inary information gathering for the full project to be later implemented. The project is being developed in support of Local Agenda 21 pilot projects being conducted in the project area and to show a way for the enhancement of water bodies as well as to provide local communities with an understanding of how to inventory sources of pollution, in particular greenhouse gas emissions from mobile and
|
|
Mauritius
|
Multifocal Area
|
2001
|
991.00
|
Phase 2
|
Project Number: MAR/01/01 |
This Planning grant was used to develop a project aiming to reconvert a group of 12 artisanal fishermen of the Port-Louis region (which use traditional techniques/equipment and fish within the lagoon) into professional fishermen (using modern and ( ... )
nmentally sustainable techniques/equipment and carry out offshore fishing) in order to allow them to earn their living and that of their family. This project was initiated following the increased environmental degradation by industrial pollutants, of the lagoons in the region of Pointe-aux-Sables/Baie du Tombeau, resulting in a drastic reduction in fish
|
|
Mauritius
|
Multifocal Area
|
2001
|
50,000.00
|
Phase 2
|
Project Number: MAR/01/03 |
This pilot project aims to reconvert a group of 12 artisanal fishermen of the Port-Louis region (which use traditional techniques/equipment and fish within the lagoon) into professional fishermen (using modern and environmentally sustainable ( ... )
ques/equipment and carry out offshore fishing) in order to allow them to earn their living and that of their family. This project follows the increased environmental degradation by industrial pollutants, of the lagoons in the region of Pointe-aux-Sables/Baie du Tombeau, resulting in a drastic reduction in fish catch. In order to achieve the above objective, the GEF/SGP grant will be used for the
|
|
Sri lanka
|
Biodiversity
|
2001
|
5,432.00
|
Phase 2
|
Project Number: SRL/01/026 |
Community forestry in five acres of watershed; establish 20 model homegardens with 20 farmers; awarenss raising programmes; sharing of experiences and promotion of organic farming methods. The farmers live in degraded sugar cane growing lands where ( ... )
e income is from this but as the lands grow barren each year, the input of fertilizer increases a heavy cost for the farmer. The attempt is to wean the farmer away from sugar cane growing to home garden development and soil conservation.
|
|
Chile
|
Biodiversity
|
2001
|
14,214.00
|
Phase 2
|
Project Number: CHI/01/15 |
La comunidad Romeralcillo realizara un plan de Manejo Integrado basado en un diagnostico de los propios comuneros y apoyados por un equipo tecnico adecuado |
|
Chile
|
Biodiversity
|
2001
|
4,181.00
|
Phase 2
|
Project Number: CHI/01/16 |
La comunidad realizara un plan de Manejo Integrado basado en un diagnostico realizado por ellos , que determina las areas de acción que seran abordadas con el apoyo de profesionales idoneós |
|
Chile
|
Biodiversity
|
2001
|
14,214.00
|
Phase 2
|
Project Number: CHI/01/14 |
La Comunidad Potrerillos Alto Realiza un dignostivo de su Microcuenca Quebrada Potrerillos, con la finalidad de realizar un Plan de Manejo Integrado de Microcuenca |
|
Chile
|
Biodiversity
|
2001
|
14,214.00
|
Phase 2
|
Project Number: CHI/01/13 |
La Comunidad Agrícola La Colorada de Aguilera Sarmiento y otro ha realizado un diagnóstico de la Microcuenca y para ella van a desarrollar un Plan de Manejo integrado que considere el maeno de gando, manejo forestal optimización del recurso ( ... )
|
|
Peru
|
Climate Change Mitigation
|
2001
|
3,000.00
|
Phase 2
|
Project Number: PER/01/09 |
El uso indiscriminado de lena y aceite quemado como insumos energéticos para la generación de calor en las calderas de los microempresarios de Saunas en Huancayo incrementa la emisión de CO2 a la atmósfera y contaminación de esta ciudad. ( ... )
royecto promoverá el aprovechamiento de la energía solar para mitigar el cambio climático, disminuir la contaminación de la ciudad de Huancayo y mejorar las condiciones económicas de las microempresas de servicios de
|
|
Kazakhstan
|
Biodiversity
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/13 |
Planning grant 1) enhances the degree and quality of community and stakeholders participation in the project design and development, 2) provides grantee's access to relevant scientific and technical expertise to ensure that the project has a sound ( ... )
ific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Kazakhstan
|
Biodiversity
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/12 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Dominica
|
Biodiversity
|
2001
|
2,000.00
|
Phase 2
|
Project Number: DMA/UNF/PLN/01/02 |
To help the Cockrane Village Improvement Committee with their project writing skills in the further development and costing of their Eco Village Transformation Project |
|
Kazakhstan
|
Biodiversity
|
2001
|
300.00
|
Phase 2
|
Project Number: KAZ/00/24 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Kazakhstan
|
Biodiversity
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/06 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Kazakhstan
|
Biodiversity
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/05 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Kazakhstan
|
Biodiversity
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/03 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Kazakhstan
|
International Waters
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/08 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Kazakhstan
|
Climate Change Mitigation
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/07 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|
Kazakhstan
|
Biodiversity
|
2001
|
450.00
|
Phase 2
|
Project Number: KAZ/01/04 |
This planning grant 1) enhances the degree and the quality of community and stakeholder participation in the project design and development, 2) provides the grantee with access to relevant scientific and technical expertise to ensure that the ( ... )
t has a sound scientific and technical foundation, 3) provides access to technical assistance in sound project design and
|
|