There are 289 projects that match your search.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Albania
|
International Waters
|
2000
|
950.00
|
Phase 2
|
|
Project Number: ALB/00/12 |
|
This Planning Grant will be used for the following purposes:
-to organise meetings in the area of Korca and Pogradeci with local communities, environmental regional organizations and societies, specialists from public and private economic sectors, ( ... )
entatives from Municipalities and Prefectures of these areas;
-a full information will be provided in terms of production capacities in these areas, raw materials, energetic consumption, discharges and emissions in the environment and other environmental concerns;
-a concrete discussion with local NGOs will take place, regarding the implementation of this project and other suggestions might be
|
|
|
Albania
|
Biodiversity
|
2000
|
11,280.00
|
Phase 2
|
|
Project Number: ALB/00/06 |
|
This project came up as a result of a planning grant, which paved the way to the preparation of this full project-proposal
The main aim of this project is a general inventory, pointing out the permanent and temporary habitats of bobcat in the ( ... )
of Shkodra, Malesi e Madhe, Puka, Bulqize, Mat and Librazhd. This study will serve as a preliminary basis for developing the bobcats conservation system in Albania. The project will intend to involve the whole local communities of the above mentioned areas, in public awareness campaigns which will be developed through this project on bobcat inventory and its protection. Thus, meetings,
|
|
|
Albania
|
Multifocal Area
|
2000
|
10,580.00
|
Phase 2
|
|
Project Number: ALB/00/10 |
|
The two-day Stakeholder workshop in Shkodra and Fier, is intended as a catalytic training and capacity-building activity designed to foster the development of country "teams" who experience themselves as responsible for the successful implementation ( ... )
GEF/SGP.
While the workshop will focus principally on the specific work of the GEF/SGP, it will also build capacity in dealing with issues of sustainable livelihoods and the environment, including:
O fostering broader awareness and understanding of the linkages between local environment and livelihood concerns and the GEF focal areas;
O building capacity in small scale project development and
|
|
|
Albania
|
Biodiversity
|
2000
|
7,140.00
|
Phase 2
|
|
Project Number: ALB/00/02 |
|
The main aim of the project is rising of public awareness for the protection of real values of Bozdovec-Dardhe-National Park. A special attention should be given to the training and promotion of local communities for preservation of rare trees, ( ... )
h putting tables, cleaning up and planting new saplings. An important element is considered also the strengthening of co-operation among NGOs, ocal authorities and other relevant institutions with local communities and particularly with young generation. A monitoring study will be undertaken to identify the real situation in this Park, damages recently caused to the trees in order to point out
|
|
|
Albania
|
Multifocal Area
|
2000
|
11,000.00
|
Phase 2
|
|
Project Number: ALB/00/11 |
|
This project intends to point out the real values of the biodiversity in the Viluni Lagoon, its habitats and the areas which should be protected. An inventory and monitory will be carried out in the Velipoja region aiming the preservation of the ( ... )
resources with particular attention biological production and fish farming.The project aims also the improvement of actual state of birds through different actions in the field and cooperation with Hunters Association ad Directorate of Forests. Strong awareness campaign will be developed through establishment of a new information center, a brochure, leaflets and posters will be published,
|
|
|
Albania
|
Multifocal Area
|
2000
|
500.00
|
Phase 2
|
|
Project Number: ALB/00/21 |
|
This funding is provided to NGO for planting of decorative tree saplings in the degraded parts of Tirana National Park. This activity will take place on Saturday, 16 December 2000, and a large participation of people is expected to be active in it. |
|
|
Albania
|
Biodiversity
|
2000
|
6,300.00
|
Phase 2
|
|
Project Number: ALB/00/08 |
|
This project aims at:
-rising of public awareness of local community and school pupils, aiming the acknowledgement of economic and eco-tourism values of the area 'Bredhi i Hotoves';
-Preservation and protection of this area, aiming a better ( ... )
ment of it;
-regeneration of the damaged areas through cleaning-up and planting new saplings and seeds, in an area of about 120 ha.
-protection and increase of threatened species of flora and fauna in this area;
-creation of good circumstances for tourism development;
-Public awareness campaign will be developed through meetings, seminars with local communities and school pupils, a special
|
|
|
Albania
|
Biodiversity
|
2000
|
5,200.00
|
Phase 2
|
|
Project Number: ALB/99/07 |
|
The main aim of the project is rising of public awareness, mainly of local community on preservation and protection of biodiversity values in the area, through active community participation in concrete demonstration to biodiversity protection. The ( ... )
t will occur in area Strelca-Korce. Rare threatened species of the zone will be identified and some measurements will be taken for their preservation and protection. The project will have its effect and influence on improvement of village stream flow reducing the erosion level and increasing the fish quantity in it. The local community will participate actively in the project, showing their
|
|
|
Albania
|
Biodiversity
|
2000
|
12,765.00
|
Phase 2
|
|
Project Number: ALB/00/16 |
|
This project aims at rising of local community awareness on the protection and preservation of the Mati River Lagoon and the whole natural environment. Participation of local community in different actions is considered a key element for protection ( ... )
eservation of the environment in this area. This project aims also: the forestation of a part of degraded habitats (2ha); determination and evidence of threatened species and actual situation of flora and fauna. Are also intended to be minimized the negative effects caused by erosion, uncontrolled woods cutting, collection without any criteria of the medical plants in the area around the lagoon,
|
|
|
Albania
|
Biodiversity
|
2000
|
12,120.00
|
Phase 2
|
|
Project Number: ALB/00/14 |
|
The project intends to evidence the biodiversity values in this area; to monitor and inventory of nesting and migrating birds; fishing monitoring in the lagoon; estimation of water quality; rising of local community awareness on real values of ( ... )
ersity in this area. Community participation is considering a key factor and the local community will be thoroughly involved in the process of drafting a 'Management Strategy' for this area in close cooperation with Local and Central Authorities. A Local Organization will be set up, with a large participation of local people, fisherman, hunters, farmers, pupils etc, aiming the area protection and
|
|
|
Albania
|
Biodiversity
|
2000
|
4,770.00
|
Phase 2
|
|
Project Number: ALB/00/03 |
|
The main objectives of this project are as follows:
-pointing out the real values in the area 'Pylli i Sotires' and the present situation of trees and rare species.
-rising of public awareness, particularly of local community, aiming the ( ... )
tion of recent damages, uncontrolled cuttings and unlegal hunting in this area.
-drafting a set of measurements aiming a long-term common strategy for improvement of the actual situation in the area
-increase of lobbying among organisations and public authorities for right implementation of actual legal frame for this area.
-the project intends to withdraw the attention of local and
|
|
|
Albania
|
Multifocal Area
|
2000
|
13,626.00
|
Phase 2
|
|
Project Number: ALB/00/19 |
|
The main aim of the project is the protection of the biodiversity in the Bedeni Forest (near Kavaja)as well as the protection of coastal waters in the Gjenerali Beach. Participation of Local Community in different actions for biodiversity protection ( ... )
idered the key element in the project success. Local Community in accordance with the Biodiversity Protection Strategy will implement different concrete measurement. Mention should be made on cleaning and forestation of a part in Bedeni Forest (1000 saplings will be planted); some actions against erosion will take place inside the Forest; a tourist infrastructure will be prepared for the area;
|
|
|
Albania
|
Biodiversity
|
2000
|
6,935.00
|
Phase 2
|
|
Project Number: ALB/00/20 |
|
The main objective of this project is the preservation and protection of flora and fauna in the Sopot Area. Thus: 80% of local people will be trained on different actions have to be undertaken in the area, like forestry regeneration, area ( ... )
ation etc. 60% of Local Community will be skilled on different actions have to be undertaken for earth protection from erosion; A very important element in the project will be the strengthening of cooperation amongst NGOs, Local Communities and Local Authorities in taking measures for controlling and stopping all activities like hunting of rare species, cutting of woods and rare plants, etc. It
|
|
|
Albania
|
Biodiversity
|
2000
|
14,080.00
|
Phase 2
|
|
Project Number: ALB/00/04 |
|
This project aims at:
a) building and developing capacities of environmental specialists and NGO members through a series of training courses, adaptable for different levels;
b) exchanging experience among specialists and NGO members in different ( ... )
of protection and efficient use of biodiversity sources in Albania;
c) offering opportunities for cooperation in the future, as well as for figuring out the areas where NGOs might be involved in protection of biodiversity.
Results include:
Three training courses (3 days) offering methodologies in inventory, planning, management and monitory of biodiversity level in Albania would be held at
|
|
|
Albania
|
Biodiversity
|
1999
|
7,900.00
|
Phase 2
|
|
Project Number: ALB/99/06 |
|
The main aim of the project is the study, estimation and preservation of the today's biodiversity and habitats, flora, fauna in the area between Vjosa Delta Zone and Narta Lagoon. The long term aim is the renewal of biodiversity of this area and ( ... )
urroundings area. The project would draft an inventory with identification of globally threatened species (animals or plants) by extinction as well as defining some measurements for their preservation and renewal. A preliminary documentation will be compiled in order to preserve the natural values and to ensure the rational use of natural resources.
A short and long term strategy will be defined
|
|
|
Albania
|
Biodiversity
|
1999
|
16,670.00
|
Phase 2
|
|
Project Number: ALB/98/01 |
|
The main aim of the project is conservation of the Dalmatian Pelican (Pelecanus crispus), which is a globally threatened species. The project would occur at the Lagoon of Karavasta, which is a Ramsar site, and home to many rare and endangered ( ... )
s. The local community will be thoroughly involved in every step of the project. Strong awareness campaigns will be developed will particular attention on the education of school children.
Bird communities will be monitored throughout the year in order to evaluate their situation. Nesting sites of the Dalmatian Pelican would be guarded in order to protect the species and to improve their
|
|
|
Albania
|
Multifocal Area
|
1999
|
4,640.00
|
Phase 2
|
|
Project Number: ALB/99/04 |
|
The main aim of the project is to clean-up from parasite of infected pine trees. Strong campaigns will be developed for rising of public awareness with particular attention environmental education of school's pupils, local communities and ( ... )
ery's monks. The project will occur in the area Rrapez and Kolonja. Very good and closed links will be established with school's teams in the area, i order to monitor and help in cleaning-up of pine trees branches and developing the public awareness campaigns. 300 pine trees will be cleaned-up by school's pupils and by monks who wish to have a very cleaned environment. They will also clean-up the
|
|
|
Albania
|
Multifocal Area
|
1999
|
2,050.00
|
Phase 2
|
|
Project Number: ALB/99/05 |
|
Through this project intends to be demonstrated and in the same time to be improved the social economic conditions of local community through improvement of environmental-ecological living conditions The main aim of the project is to clean up, to ( ... )
t and well manage the Kashar water reservoir. The Kashar reservoir will be used as a "model" for other communities in Tirana and other cities order to promote them to undertake such initiatives. Women involvement is considered of a great importance in the project. The project will also realize the biological water purification, turn of organic cattle manure to a useful product-increase of fish
|
|
|
Albania
|
Multifocal Area
|
1999
|
6,200.00
|
Phase 2
|
|
Project Number: ALB/99/02 |
|
The main aim of the project is to establish an Eco-Counseling Center (Green Line) The Center will be established in Tirana. A new programme will be drafted and new instruments will be defined to be used for environmental education A new database ( ... )
e set up on environmental data at the region, new contacts will be established between Local Community , Local State and other relevant specialists of Scientific Institutions for solving different environmental problems. Strong awareness campaign will be developed with particular attention on environmental education of different people, students, pupils etc.A new model will be set up aiming the
|
|
|
Albania
|
Biodiversity
|
1999
|
690.00
|
Phase 2
|
|
Project Number: ALB/99/09 |
|
This planning grant will mainly be used to afford some field trips to some areas in Albania, where bobcat lives and grows. This areas are: Shkodra, Malesi e Madhe, Puka, Bulqize, Mat, Librazhd and Devoll. Meetings, discussions with local communities ( ... )
ir involvement in the project are considered of a great importance for drafting a successful project. The main directions where the project will consist are:
- Determination of the bobcat's habitats in Albania
- Evidence of actual problems of this specie in different areas
- Conclusions and ideas will be drafted in a new project on bobcat's evidence, protection and its
|
|
|