There are 441 projects that match your search.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Tanzania
|
International Waters
|
2007
|
8,952.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/CWI/07/02 |
|
Kwimba District in Mwanza region is one of the very dry area, whose water table is not suitable for shallow wells, the area has a recurring water borne diseases outbreaks and this highly affects school children. The reliable solution for this area ( ... )
nwater harvesting tanks.
The project aims at demonstrating on how rainwater harvesting technology can be used to improve water supply and sanitation in schools, which are located in areas where conventional water supply systems such as gravity and shallow wells are not feasible.
There will be construction of a one rainwater harvesting tank of 50,000 litres and the project will develop two
|
|
|
Tanzania
|
Land Degradation
|
2007
|
8,804.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/CWI/07/04 |
|
Nella Secondary School is in Kwimba District. The district is affected with water shortage and has thus been affected with recurring outbreaks of water borne diseases. Schools being a public place is much more affected by the situation.
The ( ... )
t aims at demonstrating on how rainwater harvesting technology can be used to improve water supply and sanitation in schools, whcih are located in areas where conventional water supply systems such as gravity and shallow wellas are not feasible.
There will be construction of a one rainwater harvesting tank of 50,000 litres and the project will develop two wing improved pit latrines(VIP)
|
|
|
Tanzania
|
International Waters
|
2007
|
8,804.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/CWI/07/05 |
|
The project aims at demonstrating on how rainwater harvesting technology can be used to improve water supply and sanitation in schools, which are located in areas where conventional water supply sysytems such as gravity and shallow well as are not ( ... )
le.
There will be construction of a one rainwater harvesting tank of 50,000 litres and the project will develop two wing improved pit latrines(VIP) connected with the rainwater havesting tank of 10,000 litres capacity. Each wing will be for one gender for the students hygiene. There will also be some seminars on hygiene education and environmental sanitation. It is expected that the project
|
|
|
Tanzania
|
International Waters
|
2007
|
8,804.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/CWI/07/03 |
|
Nella Secondary School is in Kwimba District. The district is affected with water shortage and has thus been affected with recurring outbreaks of water borne diseases. Schools being a public place is much more affected by the situation.
The ( ... )
t aims at demonstrating on how rainwater harvesting technology can be used to improve water supply and sanitation in schools, whcih are located in areas where conventional water supply systems such as gravity and shallow wellas are not feasible.
There will be construction of a one rainwater harvesting tank of 50,000 litres and the project will develop two wing improved pit latrines(VIP)
|
|
|
Tanzania
|
Land Degradation
|
2007
|
5,990.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/07/01 |
|
Olkolili village is situated in Hai District near Kilimanjaro International Aitport in an area which is very dry. The area is occupied by pastoralist and has very strong winds, the area is also affected by wind soil erosion. The village experience ( ... )
wind destructions where by roof of schools and houses are frequent taken away by wind.
The main objective of this project is to conserve the area througth tree planting.The project will plant indigenous tree as well as other trees. The project expect the planted trees will reduce the effect of strong winds and wind soil erosion.
The project will conduct seminar on environmental conservation
|
|
|
Tanzania
|
Land Degradation
|
2007
|
28,063.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/SGP/OP3/Y2/07/01 |
|
In many areas, environmental degradation has been reported to increase with adverse effects on economy, health and social livelihood. Environmental degradation through deforestation has been done in natural and artificail forests causing adverse ( ... )
hortages, soil erosion and drought. Mamba Vunta in Same District Kilimanjaro Region is one of the areas that has been affected by environmental degradation whereby land has been cleared due to harvesting of trees for energy generation, agriculture and agroforestry industries. Community lack knowledge and skills or are unaware of conservation and protection efforts needed to maintain and improve
|
|
|
Tanzania
|
Land Degradation
|
2007
|
25,000.00
|
OP4 - Y1 (Jul 07-Jun08)
|
|
Project Number: TAN/NBI-NTEAP/07/02 |
|
The project main purpose is to minimize soil erosion and steer against deforestation so as to ehance sustainable livelihood and environment conservation. The project will cover for villages of Karuya, Nyanchabakenya, Marasibora and Kukona/Kwibuse ( ... )
tively in Tarime District, Mara Region. In the Mara River Basin natural resources including land, forest, game and water (groundwater as well as surface water water) in the river basin are being managed in unstastainable manner, thus leading to natural resources depletion and consequently environmental degradation in the river
|
|
|
Tanzania
|
Climate Change Mitigation
|
2006
|
23,339.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/NBI-NTEAP/06/11 |
|
The project purpose is to create awareness to the community members on the use of solar energy as an alternative source of energy in ten wards of Bukoba and Muleba districts respectively. Most of the remote areas in Kagera region have no access to ( ... )
ectricity power. The community members in these areas despite of their low income have been incurring high expenses for domestic energy use that is provided through fuel wood and kerosene respectively. Most of the people in Kagera region are unaware of the use of renewable energy they therefore spend a lot of money on kerosene and firewood for cooking and lighting. In the process they are led to
|
|
|
Tanzania
|
Land Degradation
|
2006
|
23,514.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/NBI-NTEAP/06/01 |
|
The project purpose is to strengthen the capacities of two primary schools along the lake to overcome environmental threats with negative impacts to Lake Victoria through addressing effects of deforestation and use of industrial agro-chemicals. The ( ... )
t will operate in two schools of Majita and Butata in Musoma Rural district. The project will enhance environmental education and community health education to the two schools, support schools to establish tree woodlots at their respective compounds to minimize soil erosion and act as wind breakers during wind period and will promote organic farming activities in schools to minimize the non point
|
|
|
Tanzania
|
Land Degradation
|
2006
|
17,307.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/SGP/OP3/Y2/06/02 |
|
Since demand for afforestation for ecological and economic reasons has increased and will continue to be so in the near future, private nurseires are expected to increase production of nursery stock to meet the increased demand.
The objective of ( ... )
oject is to build the capacity of private nursery owners as a strategy to ensure increased production of good quality nursery stock. It will also promote involvement of private nursery owners in the production of increased and good quality tree seedlings for sustainable land management in 8 divisions of Lushoto district. These will bring about ecological and economic benefits as the trees from
|
|
|
Tanzania
|
Biodiversity
|
2006
|
5,336.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/06/03 |
|
The project is schools focused whereby pupils are trained and participate in environmental conservation from their youthful stage, this will lead to a environmental conscious society in the future hence conserving the environment.The project ( ... )
es tree planting and fuel efficient stoves construction to the schools in the project coverage area, this technology may easily be adopted by families learning from the school performance of the stoves such as reduction in wood fuel use, hygiene and time serving
|
|
|
Tanzania
|
International Waters
|
2006
|
22,214.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/SGP/OP3/Y2/IW/06/10 |
|
Sea Sense, is a Tanzanian NGO is committed to protecting the coastal and marine environment for its management and poverty reduction. This Sea Sense project aims at solving the following main problems at Mafia, Mkuranga, Bagamoyo, Temeke and ( ... )
i districts. Its main objective is to protect the endangered marine species and their habitats in Tanzania. To make sure that the marine species and their habitats are conserved, owned and managed by local communities and districts authorities enabled for the betterment of local livelihoods and global
|
|
|
Tanzania
|
Land Degradation Land Degradation
|
2006
|
23,977.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/NBI-NTEAP/06/16 |
|
The project is designed to address very serious and pressing environmental problems that are faced by the community in Ikondo ward. The need assessment was conducted in partnership with community representatives in Ikondo ward the following issues ( ... )
dentified - (1) Poor farming methods leading to soil erosion (2) Uncontrolled bush fire that destroy vegetation cover and general ecology (3) Cultivation along the Ngono river banks (4) destruction of wetlands,(5) excessive tree cutting (6) lack of reliable sources of tree seedlings (7) supply for trees planting and inadequate awareness of community
|
|
|
Tanzania
|
Biodiversity
|
2006
|
4,830.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/06/08 |
|
Njoro Juu water spring is located in Moshi Town; this spring supports a big number of people in Moshi town. The water of this spring joins other springs in Miwaleni area an area which is very dry. Miwaleni water springs are surrounded by villagers ( ... )
aleni wards and thus affected by environmental due to demand for water for irrigation and fuel wood.
The objective of this project is to raise tree seedlings which will be planted in Miwaleni area. The project will also protect and conserve Njoro juu water spring. The project has planned to plant about 53,000 tree will be planted around these water springs.
The project will also contribute in
|
|
|
Tanzania
|
Biodiversity
|
2006
|
39,841.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/SGP/OP3/Y2/06/06 |
|
Recent surveys show that the Eastern Arc Mountain Forests are severely disturbed. As a result of these disturbances, most of the endemic and near endemic species are threatened to the extent of extinction. Concerted efforts have been made by both ( ... )
vernment and NGOs to secure effective conservation for biodiversity within the Eastern Arc Mountain Forests.
The purpose of this project is to provide training in forestry management to farmers around Montessori Training Centre in Lushoto so that they may actively participate in the reforestation activities in and around their
|
|
|
Tanzania
|
Land Degradation
|
2006
|
15,985.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/06/10 |
|
The Faru Irrigation canal was rehabilitated in the year 2003 but it still have few problems . Faru canal has been affected by siltation and over flows from Masaera irrigational canal . Water from Masaera Canal from time to time cause damage to Faru ( ... )
ional canal. Farmers of the Faru canal have been working on this problem but their efforts will only be temporary. This proposal intents to solve this problem parmanently.
After the rehabilitation of the Faru canal in the year 2003, farmers were able to obtain a lot of crops but the farmers were not organized to access good market for their products and also the farmers had lack of marketing
|
|
|
Tanzania
|
Biodiversity Biodiversity
|
2006
|
11,141.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/06/14 |
|
Every tribe has traditional food crops as the Chagga do, but due to increase modernization many tribes tend to move away from their traditional foods, for Kiilimanjaro the disappearing of traditonal food crops is increasing to a level that needs ( ... )
ion. Most of these crops required a well conserved land and agro-forestry practice, which is disappearing due to increased population and other economic factors. It has been noted that these crops have high health value.
Together with COMPACT, Lyamkara Environmental and Cultural Heritage Promotion Association (LECHPA) will work to propagate these crops for cultivation by communities around Mt
|
|
|
Tanzania
|
Multifocal Area
|
2006
|
19,402.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/06/15 |
|
The main purpose of this assignment is to capture and document impact of the COMPACT supported activities around Mt. Kilimanjaro particularly the interventions that have contributed into reduction of threats to Mount Kilimanjaro Natural Resources, ( ... )
y Reduction and Enhanced local community awareness and education on environmental conservation.
This documentation will also capture initiatives that has contributed to enhance the capacity of NGOs and CBOs to be stronger and self sufficient.
The documentation will also emphasize on areas where communities around the mountain have strengthen cooperation with the management of Kilimanjaro
|
|
|
Tanzania
|
Climate Change Mitigation
|
2006
|
22,825.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/COMPACT/GEF/06/13 |
|
Mailisita Vocational Training Centre is experiencing water shortage as well as high water bill. By drilling a water borehole it is expected that the center will use the water they will drill to irrigate small gardens around the centre to increase ( ... )
come (since the borehole is a more reliable source of water for the centre).Solar power will be used to pump the water.
The centre will further contribute to youths self employment through trainings they acquire at the centre, thus contribute to reduction in illegal activities on Mount Kilimanjaro natural forest.
The project objectives include to use solar as a source of energy for
|
|
|
Tanzania
|
International Waters
|
2006
|
23,502.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: TAN/NBI-NTEAP/06/05 |
|
The project purpose is to empower women economically through building their capacity in the production of water hyacinth products collected from Kagera River. The project will cover two wads of Kassambya and Minziro in Bukoba Rural district with the ( ... )
ration in the Kagera River which has been choked by the water hyacinth and its banks being degraded by the encroaching farmers. The group will address both river basin conservation as well as women economic empowerment through conservation. There is high siltation and high use of agro-chemicals resulting from agriculture; water hyacinth causes poor water navigation, dangers from crocodiles hiding
|
|
|