There are 1,032 projects that match your search.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Benin
|
International Waters
|
2014
|
25,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: BEN/SGP/OP5/Y4/CORE/IW/14/02 |
|
Le Centre Afrika Obota a, depuis la communication des résultats des recherches effectuées dans la région des Collines entre 2003 et 2007, procédé à :
-l?assainissement de l?environnement de trois localités pilotes ;
-la réalisation de ( ... )
es familiale EcoSan, pour les ménages ;
-la réalisation de périmètre de protection des forages ;
-etc.
Au regard des acquis, le Centre Afrika Obota a décidé renforcer les actions menées et étendre la stratégie à trois autres villages (Akouègba, Hoco et sowé) où le taux de couverture en latrines reste très faible.
Pour accompagner les mesures de changements de comportement
|
|
|
Uganda
|
International Waters
|
2014
|
45,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: UGA/SGP/OP5/STAR/IW/14/33 |
|
ECE Wetland Ecosystems Services Project aims to contribute towards improved management of wetlands in Luuka district and promote the provision of wetlands ecosystem services to local communities which include small holder farmers and schools by ( ... )
ing local leadership committees and community based groups/organizations with skills for alternative livelihoods through participation and sensitization on sustainable use of
|
|
|
Bahamas
|
International Waters
|
2014
|
150,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: BHA/SGP/OP5/CORE/IW/2013/25 |
|
The main goals of this newly proposed project are to encourage sustainable use of coral reef ecosystem
services and goods and to increase awareness of coral reefs, and their threats with special emphasis on
the impacts of habitat loss and climate ( ... )
. The activities of the project will increase awareness of the
mechanism, causes, and impacts of climate change on coral reefs and coastal areas by using a multimedia
approach in order to reach out to all age groups. The activities will be designed to reach a variety of target
groups including schools, community groups, the dive industry, and the general public countrywide. The
outcomes will
|
|
|
Micronesia
|
International Waters
|
2014
|
50,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: FSM/SGP/OP5/Y3/STAR/IW/2014/02 |
|
This project aims to reduce the E.coli level of the Awak river/stream to/or under the accepted recreational level of <576 mpn/100ml. The Awak Youth Organization proposes to work with the village leaders and pig farmers/owners to convert all ( ... )
ximately 26 pens) pigpens in Awak to the dry-litter system to prevent pig waste/contaminants from entering the
|
|
|
Micronesia
|
International Waters
|
2014
|
50,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: FSM/SGP/OP5/Y3/STAR/IW/2014/04 |
|
Project intends to address problems concerning overfishing through traditional resources
management, fisheries habitat protection and community based enforcement and
monitoring protocol to increase community support and compliance. |
|
|
Micronesia
|
International Waters
|
2014
|
5,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: FSM/SGP/OP5/Y4/STAR/IW/2014/03 |
|
The project will aim to support proper planning, stakeholder consultations, community meetings, project design and development of a self sufficient methane gas pilot farms productions in Pohnpei, FSM communities. Additionally within the planning ( ... )
stage grantee will work with relevant stakeholders in development of a strategic plan to guide full project development and implementation
|
|
|
Micronesia
|
International Waters
|
2014
|
48,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: FSM/SGP/OP5/Y4/CORE/MF/2014/01 |
|
The expected impact of the project will result in the enhanced image of U as an environmentally, socially, and economically sustainable and friendly place, where people will want to visit, work, and live.
A balance between a clean environment and ( ... )
oping economy mean
protecting the source of livelihood of the people; that is, the mangrove forest and coastal
water to ensure marine lives such as fish, clams, mangrove crabs, seaweed and corals have a clean environment in which to live and grow.
To combat the effect of climate change and promote biodiversity, UOW will be planting Pandanus trees along the coastline in Nan U to help mitigate
|
|
|
Georgia
|
International Waters
|
2014
|
25,140.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: GEO/SGP/OP5/Y3/CORE/IW/14/16 |
|
Project aim: identify eutrophicated reservoirs in Poti-Paliastomi area, determine management mechanisms together with the local population and the government, reduce the area of eutrophicated places and arrange pilot fish farming on the selected ( ... )
oir in order to promote using the area for fish farming.
|
|
|
Georgia
|
International Waters
|
2014
|
19,154.27
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: GEO/SGP/OP5/Y3/CORE/IW/13/05 |
|
Introduction of sustainable management of the river Alazani basin, caring out boarder reinforcement activities with the participation of the local community in the village Jokolo. Plants planting close to the banks in order to support banks of the ( ... )
Community mobilization and their participation strengthening in water management practice.
|
|
|
Tanzania
|
International Waters
|
2014
|
43,408.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: TAN/SGP/OP5/Y3/STAR/IW/13/21 |
|
Context:
Mangrove forests are considered to be formidable defense lines against the sea offensive. Mangroves thwart on-land charging sea waves, which are highly destructive. Absence of mangroves results in degradation of the coastline and ( ... )
ion of the sea towards land. Mangroves also provide a myriad of social benefits. They include breeding grounds for fish; provision of building poles, fuel wood and critical habitats for a variety of bird species. Most of the mangrove forests are threatened by unsustainable extraction pressure for fuel wood and building poles. Some of the mangrove forests are cut down to make way for salt farms.
|
|
|
Uganda
|
International Waters
|
2014
|
47,200.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: UGA/SGP/OP5/STAR/IW/13/16 |
|
to equip communities in Sironko district with knowledge, skills and technology to sustainably manage water and land resources in order to reduce the impacts of climate change and increasing resilience To future impacts by supporting communities to ( ... )
e land and water management to increase agricultural production; adopt environmentally friendly agricultural practices to equitably use the available water resources, minimize land degradation and increase agricultural production; promote energy efficiency, use of improved cook stoves; and support establishment of sustainable agricultural enterprises through a communal revolving
|
|
|
Moldova
|
International Waters
|
2014
|
48,476.21
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: MDA/SGP/OP5/Y3/STAR/IW/13/10 |
|
In 2012, the NGO "National Environmental Center" elaborated the report "Ecological status of river Bic river basin", involving the 63 Public Local Authorities (PLA), Ecological Inspections and Public Health Centers from Calarasi, Straseni, Ialoveni, ( ... )
Noi districts and Chisinau municipality, which implied planning, coordinating and organizing and mobilizing the population in practical activities. The project assumes a broad spectrum of activities involving population from Bic River Basin localities. These activities have the purpose to raise awareness and empowerment of the population on the protection of water resources, preventing pollution
|
|
|
Belarus
|
International Waters
|
2014
|
50,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: BLR/SGP/OP5/Y3/STAR/IW/13/01 |
|
Project goal ? Organization of a system of preservation and use of the national importance monument "Blue spring"
Project tasks:
1. Create working group consisting of district stakeholders (Local population, NGOs, business, Authorities) for ( ... )
nservation and use of sources;
2. Develop and set up the Special protection Status around the Source area and to develop and introduce the regime of its use;
3. Create conditions and infrastructure around the Source, preventing pollution and improving the Source attraction for local people and tourists;
4. To create in the "Environmental Center of spring water "Blue spring"
Project
|
|
|
Guinea
|
International Waters
|
2014
|
29,450.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: GIN/SGP/OP5/Y3/STAR/IW/14/21 |
|
Le projet vise à maintenir l?équilibre de la biodiversité suite au fait que les ressources en eaux subissent aujourd?hui les conséquences directes de la dégradation des forets dont on peut citer : Irrégularité des régimes, Tarissement des ( ... )
n période sèche, Exposition des berges, Ensablement des lits, Disparition des espèces animales et végétales aquatiques. L?objectif du projet est de renforcer la couverture végétale des têtes de sources pour réguler leur régime au profit des communautés
|
|
|
Tanzania
|
International Waters
|
2014
|
45,821.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: TAN/SGP/OP5/Y3/STAR/IW/13/19 |
|
Context:
Increased human socio-economic activities in Mwanza have degraded the Nyashishi wetland. The activities include horticulture, overgrazing and discharge of industrial effluent. As a result of these degrading actions, vegetation ( ... )
ically elephantiasis and papyrus that used to flourish in the wetland and provide fish breeding grounds are not there anymore. The crocodiles, large lizards and a host of other creatures that used to populate those areas cannot be seen today. This project intends to restore the Nyashishi wetland to its former glory through strong advocacy, awareness creation actions, grass seeding and planting of
|
|
|
Zambia
|
International Waters
|
2014
|
50,000.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: ZMB/SGP/OP5 /CORE/IW/14/29 |
|
1. About the NGO
Save Environment and People Agency (SEPA) was founded in 2004 and registered in 2005. Its major focus was to address the adverse effects of climate change and HIV and AIDS. Through these years it has been in existence, it has ( ... )
in leaps and bounds by networking, providing information, building the capacity and complementing government efforts. Apart from being concerned with issues of the environment as its primary business, SEPA is also concerned with HIV and AIDS, education and gender equality. While SEPA is a national organization, meanwhile it has narrowed down its operations to North Western Province (Chavuma,
|
|
|
Kazakhstan
|
International Waters
|
2014
|
26,408.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: KAZ/SGP/OP5/Y3/STAR/IW/14/49 |
|
Project aims to reduce the load on the small trans-boundary river Aspara by means of water saving technologies to be implemented in agriculture in Merke district, Zhambyl oblast.
Project tasks: 1) to reduce water use from Aspara river during ( ... )
tion season by using efficient water use practices; 2) enhance local community capacity on new methods and practices of efficient agriculture and water saving technologies
|
|
|
Palau
|
International Waters International Waters
|
2014
|
47,925.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: PLW/SGP/OP5/Y4/STAR/2014/06 |
|
Reviving Historical Natural Spring NGETERUR towards saving Ngerbeched's Taro Patches, is an initiative driven by Ngerbeched's youth group with the following objectives: so that it becomes a source of public water as well as a constant water source ( ... )
taro patches of Ngerbeched; developing and implementing sustainable practices toward climate resilient NGETERUR and taro patches; eliminating the major land-based threat (culvert) to the freshwater source NGETERUR; and strengthening Ngerbeched?s traditional system through the revival of NGETERUR and recharge of its ground
|
|
|
Georgia
|
International Waters
|
2014
|
20,248.49
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: GEO/SGP/OP5/Y3/CORE/IW/13/06 |
|
Supporting local population participation in environment protection and international water management activities as well as strengthening community mobilization capacity in flood risk reduction achieved via bank reinforcement, mainly arranging ( ... )
te boarders and restoring the floodplain across the
|
|
|
Saint Kitts and Nevis
|
International Waters International Waters
|
2014
|
46,831.40
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: STK/SGP/OP5/Y3/CORE/IW/14/01 |
|
The problem identified is the lack of awareness programs that cater to educating the locals of St. Kitts about the marine environment. This is especially true for our local children who are generally taught to fear the sea rather than to explore and ( ... )
ate its overall significance to our existence. The concept of introducing a performing arts day camp will serve as the catalyst for promoting marine based education.
The Seaventure Stars of Tomorrow Day Camp is a sensitization initiative developed in order to raise awareness to elementary, junior high and tertiary students (male and female) about differing aspects of the local and regional
|
|
|