There are 27,190 projects available.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Mali
|
Biodiversity
|
2007
|
50,142.72
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/06/12 |
|
Le projet d'appui à la conservation de la diversité Biologique et à la restauration des terres dans le bassin de la rivière Boron, est issu d?un processus de réflexion et de concertation entre l?Association pour le Développement de Amani ( ... )
, les autorités (administratives, communales et villageoises) et les populations bénéficiaires avec l?appui ? conseil des Services Techniques et experts compétents.
Le projet visant à favoriser la conservation de la diversité biologique et la restauration des terres dans le bassin de la rivière Boron et le développement des activités génératrices de revenues par l?aménagement
|
|
|
Rwanda
|
Climate Change Mitigation
|
2007
|
49,542.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: RWA/OP3/2/06/15 |
|
The project aims to promote ecological bricks made from household waste collected in Nyakabanda and Kimisagara Sectors. The project also manufactures suitable cookers. |
|
|
Mali
|
Multifocal Area
|
2007
|
24,998.79
|
OP4 - Y1 (Jul 07-Jun08)
|
|
Project Number: MLI/SGP/OP4/Y1/CORE/07/02 |
|
L?Association pour la Formation de l?Élève Citoyen du Développement (AFECD) est créée de la volonté des parents d?élèves, enseignants, promoteurs d?école et particuliers soucieux de la protection de l?environnement et de l?avenir de ( ... )
le malienne.
Dans le cadre de sa mission « formation, éducation au service du développement équilibré », l?AFECD envisage la mise en ?uvre de ce présent projet pilote, dénommé « Projet d?appui à la promotion d?élèves prospères au plan de la promotion socio?économique, respectueux de l?environnement et militant des causes écologiques» en partenariat avec l?école privée «
|
|
|
Comoros
|
Biodiversity
|
2007
|
44,000.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: COM /SGP/OP3/CORE/Y3/ 07/01 |
|
Le projet vise à gérer durablement les ressources halieutiques du Parc Marin de Mohéli en offrant aux pêcheurs d?autres sources alternatives de pêche rentable et d?autres techniques de pêche qui ont fait leurs preuves dans d?autres pays avec ( ... )
s. Pour cela le projet entre parfaitement dans les domaines opérationnels du FEM/PMF que sont la gestion de la biodiversité et les eaux internationales puisqu?il est cadré dans la gestion rationnelle des ressources marines.
La culture de crevette, la pêche à la palangre et la pêche des langoustes sont des méthodes de pêche novatrices aux pêcheurs du Parc marin de Mohéli. Pourtant ce
|
|
|
Comoros
|
Biodiversity
|
2007
|
30,000.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: COM/SGP/OP3/CORE/Y3/07/04 |
|
Le projet vise à réduire sensiblement l'abattement des arbres , la production de charbon de bois et de l'utilisation du bois de chauffe.Leniveau de déboisement d'anjouan a atteint 65% et dans la région de Sima on produit 100 000 tones de ( ... )
nde bois par an.Ce projet cherche à baisser la pression sur les ressources ligneuses par la réduction de la consommation d'energie par les ménages grâce à la production et diffusion de 1800 foyers améliorés dans les sites appuyés par le
|
|
|
Mali
|
Multifocal Area
|
2007
|
7,295.88
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/06/24 |
|
Sommaire :
Le GRAPES (Groupe de Recherche ? Action pour la Promotion Economique et Sociale) est une Organisation Non Gouvernementale à but non lucratif ayant pour mission de contribuer à la promotion socio-économique des ( ... )
autés rurales et urbaines les plus défavorisées. Elle œuvre à l?accomplissement de cette mission depuis sa création en 1990.
En partenariat avec les bénéficiaires, elle initie, exécute et planifie les projets et programme de développement. C?est dans le cadre de sa mission d?appui à la base qu?elle a été sollicitée par l?intercommunalité dénommée SABAGA ? TISE qui
|
|
|
Mali
|
Multifocal Area
|
2007
|
38,984.20
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/SGP/43821/06/21 COMASOD |
|
Description somaire
Le présent projet exécuté par la COMASOD, est un appui à l?accompagnement du SECO/ONG en vue de faciliter et de mieux organiser le système de suivi/évaluation et d?évaluation finale des projets initiés dans le cadre de ( ... )
du PMF/ FEM.
Il s?appuie sur diverses activités d?accompagnement comme le suivi/évaluation des projets, l?évaluation finale des projets, les ateliers d?échanges d?expériences, la revue biennale du Programme afin d?analyser ses forces et faiblesses pour apporter des améliorations, des missions de suivi et d?évaluation sur le terrain.
Données sur le projet
Le PMF/FEM a pris de
|
|
|
Bolivia
|
Biodiversity
|
2007
|
5,717.92
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: BOL/OP3/2/06/19 |
|
La idea del proyecto nació a partir de una iniciativa del Centro de Investigación y Conservación de la Biodiversidad Andina (CIC ? BAGAF) y una sentida necesidad en la búsqueda de nuevas alternativas económicas de un grupo de productores de las ( ... )
ades de Asccapa y Cienega del municipio de Cotagaita, quienes a partir de la gestión 2001 iniciaron un proceso de capacitación y trabajo continuo, en el manejo de bosques de Palqui y posteriormente en la gestión 2003 inician con el procesamiento de productos derivados del Palqui en una planta de procesamiento con equipamiento básico, instalada en ambientes cedidos momentáneamente por la
|
|
|
Mauritania
|
Biodiversity Biodiversity
|
2007
|
32,500.00
|
OP4 - Y1 (Jul 07-Jun08)
|
|
Project Number: MAU/SGP/OP4/CORE/07/06 |
|
Il s'agit de la mise en place d'un arboretum (l'unique en son genre en Mauritanie) en vue de d'augmenter la prise de conscience des populations de la zone sur les risques liés à la dégradation progressive de biodiversité végétale consécutive ( ... )
©nomène de la désertification observée en Mauritanie depuis plus de trente ans. Ce projet est mis en place en concertation avec les différentes structures scolaires - écoles primaires, collèges et lycées - de la zone qui en feront un site d'observation et de travaux pratiques en vue de promouvoir l'éducation environnementale au profit des élèves notamment. L'ONG disposera plusieurs
|
|
|
Mongolia
|
Land Degradation Land Degradation
|
2007
|
7,214.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MON/06/26 |
|
Desertification is being intensified over most of Mongolia by many factors like sand shifts, rapid increase of mice and pasture land degradation. Due to desertification grasses are covered by sand and the steppe stays without anything to eat for ( ... )
ock. The community based project ?Tiny green grove? was established to plant fruit trees and establish a field protecting forest belt in order to mitigate land degradation, recover grassland and support surrounding eco-system in the area Khushuut bag, Argalant soum of Tuv province, which is 5 kilometer away from the north side the main road that comes from Ulaanbaatar
|
|
|
Samoa
|
International Waters
|
2007
|
1,581.03
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: WSM/NZD/OP4/Yr-3/07/65 |
|
PROJECT UPDATE: Yet to complete the write-up of full project proposal, based on site assessments and consultations. |
|
|
Kazakhstan
|
Biodiversity
|
2007
|
36,226.00
|
OP4 - Y1 (Jul 07-Jun08)
|
|
Project Number: KAZ/SGP/OP4/RAF/07/04 |
|
Talgar district of Almaty area has appeal to tourists. Such nature-protective territories like Almaty State Natural Reserve and Ile-Alatau National Park are located here. The settlements adjacent to the nature-protective territories have population ( ... )
undred thousands of people, and over a million and a half live in Almaty. Thus, the negative impact on the environment of the protected areas has increased. Fire numbers increase every year, non-organized tourists stream is becoming more aggressive, and this results with littering and cluttering up, disappearance of wild flora and fauna. Local people gather and sell herbs, mushrooms, berries,
|
|
|
Mali
|
Land Degradation Land Degradation Land Degradation
|
2007
|
13,525.15
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/06/35 |
|
Données sommaire:
Le Programme Micro Financement dans sa Phase Opérationnelle III, ou OP3 a été prioritairement centré sur : La mobilisation du cofinancement, la promotion des moyens d?existences alternatifs à partir de l?exploitation ( ... )
e des ressources naturelles, l?orientation stratégique du programme au plan national, la démonstration des avantages locaux et globaux, l?application des leçons apprises et des bonnes pratiques.
En matière de Renforcement de capacités des efforts importants ont été fourni par le Programme au cours des différentes phases qui ont contribué à l?atteinte des résultats probants
|
|
|
Mali
|
Chemicals
|
2007
|
18,470.99
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/06/28 |
|
Le Mali, pays sahélien, est agropastoral à plus de 80%. Il utilise beaucoup de pesticides tant en zone cotonnière, dans le delta que dans les périmètre rizicoles. Tirant les enseignements de la crise acridienne que notre pays a ( ... )
en 2004, la campagne d?information et de sensibilisation de ce présent projet contribuera à la sauvegarde des écosystème dans la commune de Djenné ; à la protection des espèces menacée par l?utilisation abusive des pesticides, à la protection des espèces endémiques de la zone donc de la Biodiversité.
Objectifs spécifiques :
- Identifier les différents pops
|
|
|
Mali
|
Multifocal Area
|
2007
|
14,597.16
|
OP4 - Y1 (Jul 07-Jun08)
|
|
Project Number: MLI/SGP/OP4/Y1/CORE/2007/03 |
|
Le succès du PMF/FEM dépend largement du degré de participation des ONG, des OCB et des populations à sa mise en ?uvre. Cependant, le constat qui se dégage révèle une faible implication des ONG/OCB locales et des conseils communaux à ( ... )
cution du programme soit par manque d?information ou par la non-maîtrise des outils (thèmes, guide, gestion axée sur les résultats). La plupart des documents de projets soumis au PMF/FEM ne correspondent pas forcement à ses préoccupations (thèmes mal ciblés) ou sont mal élaborés. La non-maîtrise des outils s?est souvent traduite par une mauvaise planification des activités et des
|
|
|
Mali
|
Multifocal Area
|
2007
|
19,624.33
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/06/15 |
|
Le présent projet qui s?inscrit dans le cadre de suivi évaluation préconisé par le PMF/FEM consiste à assurer la participation de l?ensemble des parties prenantes aux processus d?élaboration de la Stratégie du Programme au niveau ( ... )
al et d?évaluation périodique de la performance du Programme.
Il consiste à l?organisation de deux ateliers qui réuniront les ONG/OCB, les Service techniques, le CNP et les partenaires. La rencontre se fera autour d?une proposition de stratégie qui sera améliorée par les participants afin d?adopter un document final qui orientera les activités du PMF/FEM durant cette phase.
Le
|
|
|
Mali
|
Multifocal Area
|
2007
|
18,712.08
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/06/22 |
|
Au Mali, la protection de l?environnement est inscrite parmi les priorités définies par les différents cadres de référence du développement tels que le CSLP, les OMD. Elle est une politique transversale qui a besoin de ressources importantes ( ... )
ener à bien ses missions.
C?est dans un contexte de mobilisation accrue des ressources, d?incitation à la concertation et à plus de synergie des interventions que le Programme de Micro Financement du Fonds pour l?Environnement Mondial a démarré sa Troisième Phase Opérationnelle au Mali.
L?adoption par le Programme du Mali d?une approche de concentration géographique
|
|
|
Syrian arab republic
|
Climate Change Mitigation
|
2007
|
42,000.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: SYR/OP3/3/07/17 |
|
The project aims at raising awareness on gas emissions from vehicles and their long-term as well as short term effects, including climate change. To reach this end, catalyzers will be installed on the exhaust pipes of automobiles, and emitted gases ( ... )
e measured before and after the installation in order to demonstrate the effectiveness of the catalyzers.
|
|
|
Chile
|
Multifocal Area
|
2007
|
28,846.15
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: CHI/07/05 |
|
Es una comunidad muy aislada sercana a la costa de la región de Coquimbo, donde naturalmente existe neblina por la mañana. ellos ocuparan el agua colectada para el regadio de la huerta y la forestaciones comunitarias en los terrenos mas ( ... )
ados de su
|
|
|
Mali
|
Land Degradation
|
2007
|
45,301.45
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: MLI/06/32 |
|
Le barrage de Sélingué, a été construit en 1976 avec pour objectif principal la production hydroélectrique en vue de satisfaire les besoins croissants en énergie électrique de certaines grandes villes du Mali. Il devait en outre, permettre ( ... )
nagement de 1 350 ha pour la riziculture irriguée.
Sa construction sur le Sankarani à 130 Km de Bamako a permis la création d?un lac de retenue de 409 km², et entraîné le déplacement de plusieurs villages qui ont été réinstallés en amont et en aval du barrage. Plusieurs communes dont celles de Baya a été affectée par cette construction.
Les travaux de construction et de
|
|
|