There are 29,070 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Iran
|
Biodiversity
|
2003
|
23,000.00
|
Phase 2
|
Project Number: IRA-G52-2003-027(IRA98G52) |
Project location:Doshakh village, Bisotoun, Kermanshah(Lat/Long:34.5133460-45.5877690)
The project aims to protect and revitalize Taghbostan Mountain Ecosystem through planting domestic plant species and developing a strategy to be pursued in ( ... )
areas in collaboration with local people. Through organizing volunteer teams and applying the program to other regions, the causes of environmental degradation including fires, shrub cutting, overgrazing, pollution, soil erosion and waste could be prevented. Lessons learned from implementing the project will also be used to provide a plan applicable to other regions.
The main activities in
|
|
Iran
|
Biodiversity
|
2003
|
2,000.00
|
Phase 2
|
Project Number: IRA-G52-2002-PG004(IRA98G52) |
The planning grant would be used for the preparation of SGP proposal. To this end the project proponents need to acquire the baseline studies on the condition of the biodiversity, natural and human resources and conduct a stakeholder analysis. The ( ... )
proponents will seek the collaboration of local communities, stakeholders, authorities and NGOs to attain a participatory solution via an integrated management
|
|
Iran
|
Biodiversity
|
2003
|
17,500.00
|
Phase 2
|
Project Number: IRA-G52-2002-020(IRA98G52) |
Project location:Rameh village, Garmsar, Semnan(Lat/Long:35.1962560-52.3278810)
Rameh Village is one of the pilot projects of UNDP Land and Water Project (Desertification Project). During the workshops and implemented projects, the villagers ( ... )
remarkable capacity and potential. The Women's CBO of Rameh Village is one of the results of this project. Promoting the capacity of the local community will help achieve a better management of the national resources, especially rangelands.
The overall goal of the project is to develop and practice a participatory and sustainable local management plan for rangelands of Rameh Village.
|
|
Egypt
|
Climate Change Mitigation
|
2003
|
10,065.00
|
Phase 2
|
Project Number: EGY-02-65 |
Project's activities are : 1. To design, manufacture, install, operate and maintain windmills. 2. To encourage local manufacture of producing windmills. 3. To generate electricity. 4. To reduce the greenhouse gases emissions which cause the increase ( ... )
al warm phenomenon. 5. To motivate the community to improve their ways in
|
|
Mauritania
|
Climate Change Mitigation
|
2003
|
21,610.00
|
Phase 2
|
Project Number: MAU/98/G52/02/10 |
La localité de Boubacar se situe a 200 km au Sud-Est de Nouakchott et compte environ 3000 habitants. Pour satisfaire leur besoin en eau et électricité cette population utilise deux groupes électrogènes (le plus souvent sur-dimensionnés par ( ... )
t a la nappe) dont l'un a été acquis il y a plus dix ans grâce à la générosité du chef spirituel de la localité. L'eau est tirée a partir de ce vieux groupe et est stockée dans une cuve de 12 mètres cubes. Compte tenu de la taille de cette cuve par rapport au besoin de la population, il faut au moins huit heures par jour pour assurer de l'eau en quantité suffisante.
C'est partant
|
|
Mauritania
|
Climate Change Mitigation
|
2003
|
20,154.00
|
Phase 2
|
Project Number: MAU/98/G52/03/06 |
Le présent projet vise a introduire dans le processus de développement du pays, l?utilisation des technologies d?énergies renouvelables fiables et confirmées répondant a des besoins jugés prioritaires par les populations avec des rapports ( ... )
/ avantages favorables dans ce milieu rural. Il se traduira par la mise en ?uvre de cinq actions :
- mise en place d?un système d?appui aux populations,
- diffusion et vulgarisation de cuiseurs solaires, par un système de crédit pour permettre la durabilité du projet
- capitalisation de la diffusion des foyers améliorés à bois et charbon de bois,
- création et équipement en solaire
|
|
Poland
|
Biodiversity
|
2003
|
10,026.00
|
Phase 2
|
Project Number: POL/03/10 |
Wigry National Park is facing permanent conflicts with farmers within the Park and in the buffer zone.Protection plan for the Park and buffer zone provide some restriction in form of farming and economic activities.farmers are under pressure of ( ... )
from other parts of Poland requesting sale of land for recreational purposes and these ideas (extra income, speculative price of land in past years!) are welcomed due to very low land productivity, small size of farms, demographic reasons (yopung people are leaving for towns). These recreational land, hundreds of plots became a great threat to value (biodiversity) of this park, waters
|
|
Kyrgyzstan
|
Climate Change Mitigation
|
2003
|
11,300.00
|
Phase 2
|
Project Number: KYR/SGP/OP2/Y5/CORE/2003/48 |
Main idea of the project is promoting and introducing environmentally friendly and sustainable transport by creating bicycle station and popularization of non-motorized transport
The basic components of the project are:
1. Promotion of ( ... )
nmentally friendly type of transport.
2. Determination of the market demand for bicycle services
3. Organization of 10 bicycle hiring posts in Naryn city
4. Organization of service
|
|
Kyrgyzstan
|
Climate Change Mitigation
|
2003
|
15,000.00
|
Phase 2
|
Project Number: KYR/SGP/OP2/Y5/CORE/2003/58 |
Main idea of the project is promotion and introduction of environmentally friendly and sustainable transport by creating bicycle hiring posts and advocacy of non motorized transport in the recreation zone of national importance.
Actions to be ( ... )
aken by Public Charitable Foundation «Jolchoro»
1. Promote environmental friendly type of transport.
2. Together with city authority co-ordinate rule of the bike road
3. Organize bicycle stations for rent.
4. Purchase bicycles.
5. Organize repairing shop.
6. Information
|
|
Sri lanka
|
Climate Change Mitigation
|
2003
|
28,946.16
|
Phase 2
|
Project Number: SRL/03/14 |
Introducing zero emission electric three wheeler scooters, train unemployed youth to operate and maintain the demonstration model and produce vehicle parts in order to assemble electric three wheelers locally, conduct an awareness campaign on the ( ... )
ts of electric vehicles use for reducing vehicular emissions and
|
|
Pakistan
|
Climate Change Mitigation
|
2003
|
31,134.00
|
Phase 2
|
Project Number: PAK/02/39 |
Environment, in Balochistan, has degraded somewhat rapidly in the past two decades as compared to the rest of the country. Main causes for this fragmentation have been both natural as well as human. Among the human causes is inordinate increase in ( ... )
tion, influx of Afghan Refugees, unsustainable management of available natural resources and lack of awareness. The nature has also contributed to the plight of the populace of the province in shape of a relentless drought during the past four years. This drought was, though, a recurring feature of Balochistan?s geo-climatic setting but had been more destructive, again because of human causes
|
|
Kyrgyzstan
|
Climate Change Mitigation
|
2003
|
1,500.00
|
Phase 2
|
Project Number: KYR/SGP/OP2/Y5/CORE/2003/41 |
The aim of the project is demonstration of ecological and economic advantages of using the small volume (5m3-10 m3 ) biogas installations .The project is realized in Issyk-Kul biosphere territory.
The basic components of the project are:
- The ( ... )
uction of 3 biogas installations in Kyzyl-Suu, Barskon, Saruu villages of Dzhety-Oguz district.
- The analysis of operating experience.
- Dissemination of experience
- Training of potential
|
|
Guatemala
|
Climate Change Mitigation
|
2003
|
2,180.00
|
Phase 2
|
Project Number: GUA/03/17 |
This project will establish diagnose in the air pollution measurement stations to determine the levels that are present at Quetzaltenango city. With the obtained results will develop a public awareness campaign that includes locals goverment and ( ... )
nts institutions situation and problem solutions.
With this projec hope obtein the more support of the local goberment and the people of the city. Too hope better enviroment for people of the
|
|
Kazakhstan
|
Biodiversity
|
2003
|
2,000.00
|
Phase 2
|
Project Number: KAZ/03/06 |
The project is aimed at involving of the local population, youth and teenagers into active nature protection activity to conserve biodiversity of Zailiisky Alatau mountain range.
A large-scale information campaign will be implemented to attract ( ... )
ion of the local population to the issues of rehabilitation and conservation of biodiversity of the region. For that, and also to involve the youth into environmental activities, ?ecological landings? of young ecologists of among of schoolchildren of Talgar city and nearby settlements will be arranged (100 participants are expected to be engaged), actions will be implemented, excursions,
|
|
Iran
|
Multifocal Area
|
2003
|
50,000.00
|
Phase 2
|
Project Number: IRA-G52-2003-025(IRA98G52) |
Project location:Khar Touran- Khoshyelagh- Miankaleh Areas and Golestan National Park(Lat/Long: 36.713275-55.653992)
The project will present the different ecosystems and their species of three provinces in all seasons in 11 bilingual ( ... )
ntaries (English and Farsi) for a semi-technical target group. Also the project aims to promote the inclusion of practical field training in the curriculum of universities. Alongside the production of the documentaries the project proponents will:
o use native knowledge and conduct studies to prepare the film scenarios
o encourage and educate university students (post graduate, under
|
|
Albania
|
Multifocal Area
|
2003
|
780.00
|
Phase 2
|
Project Number: ALB/03/13 |
This minigrant is given with the purpose of organizing an activity on June 5th, World Environment Day. A festive activity involving school children will be organized on this day in Tirana. |
|
Trinidad and tobago
|
Multifocal Area
|
2003
|
6,700.00
|
Phase 2
|
Project Number: TRI/03/09 |
The Junior Environmental and Sustainable Development Initiative (JEDI) project will be a dynamic instrument that would continue the work of the previous expanded response by working through and with youth at the grassroots and national level. It is ( ... )
friendly in its concept and design utilising innovative learning modules with a mixture of theory and practicum.
Data obtained in a feasibility study conducted by IFGL indicated that there is need for an educated and mobilised youth force that would be able to be used as a resource in their communities as youth advocates/practitioners in environmental conservation and sustainable development.
|
|
Kyrgyzstan
|
Biodiversity
|
2003
|
17,800.00
|
Phase 2
|
Project Number: KYR/SGP/OP2/Y5/CORE/2003/33 |
The basic of ideas of the project is counteraction to the tradition to make sepulchral fences and monuments from a juniper and also introduction of new custom to plant trees in cemeteries. There is no tradition to plant trees and gardens in ( ... )
ries among the Muslims of the south of Kyrgyzstan. The basic components of the project are:
- Creation of nurseries of a juniper in three ayil okmot of Uzgen and Suzak districts.
- Creation of 3 workshops on manufacturing gravestones and fences made of cheap alternative materials (a marble crumb, cement, metal) in the same ayil okmots where nurseries of a juniper will be created.
-
|
|
Zimbabwe
|
Biodiversity
|
2003
|
48,000.00
|
Phase 2
|
Project Number: ZIM/02/04 |
1. EXECUTIVE SUMMARY
The conservation of biodiversity by declaring some environments protected areas has often attracted a myriad of responses from communities living on the fringes of the protected area or those who sometimes are inclined to be ( ... )
ted to create space for conservation of flora and fauna. These responses have ranged from clandestine activities such as poaching in the protected area under the cover of darkness, destruction of fences erected to demarcate human settlement and the protected area, to outright acts of defiance of regulations which includes violent confrontation with the authorities.
Karamba Ward in which the
|
|
Bhutan
|
Biodiversity
|
2003
|
24,472.00
|
Phase 2
|
Project Number: BHU/03/02 |
This project aims to regenerate Karsa Yungma water catchment. This would sustain and revive volume of drinking water for Pang Communities and the main Nagor village communities. The regeneration of Karsa Yungma Water Catchment area will bring about ( ... )
hange in the lives of people of 34 households of Pang village.
As per the 1st and 2nd Progress Report of the project, most of the project activities has been carried out as the following:
1. Rural Water Supply survey;
2. Community planning and management course;
3. Water caretaker training for maintenance and sustainability;
4. Establishment of Nursery;
5. Materials for catchment
|
|