There are 29,070 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
India
|
Multifocal Area
|
2002
|
11,464.20
|
Phase 2
|
Project Number: SGP/CCF/IND/OP2/02/MN02 |
Spreading Environment Education among teachers by organising training seminars and workshops at primeary and secondary level schools.
Some of the environmental problems the project area faces is water shortage, deforestation and neglect of ( ... )
g land, and these are leading to larger environmental issues concerning survival of the inhabitants in that area. The NGO, therefore, undertook to conduct capacity building programmes for teachers by developing resource material and organising a 4-day Teachers' workshop on Environmental Education Programme in Schools (upto the secondary level). Also, there will be recommendations for deciding
|
|
Albania
|
Biodiversity
|
2002
|
8,822.00
|
Phase 2
|
Project Number: ALB/02/17 |
This project consists in theoretical and practical education of target groups on environmental issues and specifically biodiversity; giving alternatives for sustainable natural resource use through introduction of values, legislation and criteria. ( ... )
groups consist in youth, students, members of environmental NGOs, representative of local authorities, municipalities, etc.
Activities of this project include: surveys on the level of knowledge on the environment, trainings with different stakeholder groups, demonstrative activities on the 5th of June, putting up tables with messages for environmental
|
|
Philippines
|
Biodiversity
|
2002
|
41,653.00
|
Phase 2
|
Project Number: PHI/27/02 GEF-RNE |
The project is a community-based watershed protection and conservation of traditional rice varieties and vegetable crops covering ten communities. This effort to save and utilize TRVs and vegetable genetic resources among the farmers is geared ( ... )
s crops improvement purposes and increasing production.
This project will promote the systematization of genetic resource conservation by farmers in the island which has long been restrained due to skills and fund inadequacy.
The main componnets of the projects shall be conservation and retrieval of seeds which includes network building for seed exchange and propagation, adoption of 40
|
|
Mali
|
Multifocal Area
|
2002
|
15,721.56
|
Phase 2
|
Project Number: MLI/02/17 |
Projet de renforcement de capacité sur les études d'impact environnemental.
Auparavant, les préoccupations environnementales ne concernaient en général qu?un nombre tres restreint d?activités et de développement de la plupart des projets ( ... )
ainsi qu?a été réalisé sans qu?intervienne la prise en compte des questions environnementales dans le processus de prise de décision. Le développement des projets ne peut donc s?accomplir de façon durable qu?a travers un diagnostic environnemental fait aux différents stades d?évolution. C?est pour cette raison que le présent séminaire a été initié dans le but de renforcer les
|
|
Bolivia
|
Multifocal Area
|
2002
|
48,001.10
|
Phase 2
|
Project Number: BOL/26/01 |
La empresa con el seguimiento y evaluación de los proyectos permitirá contribuir, bajo la modalidad de alerta temprana, al cumplimiento de los objetivos y metas de cada uno de los proyectos y permitirá conocer con la mayor precisión posible los ( ... )
ados, efectos e impactos logrados (deseados o no.
La sistematización permitira ordenar las experiencias desarrolladas, analiza el alcance de la propuesta y en base a ello extrae lecciones a
|
|
Iran
|
Multifocal Area
|
2002
|
50,000.00
|
Phase 2
|
Project Number: IRA-G52-2001&2004-006(IRA98G52) |
Poroject Location:Noor(36.5957130-52.0257570)-Sari(36.5790700-53.0529790)-Tehran(35.7096480-51.4215090)-Semnan(35.6069940-53.3990480)-Shiyan for Tehran(35.7745760-514966460)-Eghlid(30.9292440-52.706909)-Shiraz(29.6390470-52.35256350)
The project ( ... )
for the capacity building of NGOs in participatory approaches. This project was initially designed for 7 workshops (4 funded by Department of Environment and 3 by SGP) to provide training for 100 NGO members and equipment for networking. Based on the feedback from the first 3 workshops (funded from the co-funding by Department of Environment, DOE) on the Basics of Participatory Approaches it
|
|
Brazil
|
Biodiversity
|
2002
|
26,125.12
|
Phase 2
|
Project Number: BRA/01/03 |
This project aims to assist the Technical-Administrative Coordination of the SGP Brazil in its evaluation of the program as a whole and its individual projects, as well as offer technical support for production, processing and commercialization of ( ... )
ts and services originating from sustainable use of Cerrado biodiversity. Interchange among experiences will also be promoted. Dissemination of the evaluation results to grantees, similar programs, government organizations, and others, is planned. A study and research about the program will be carried out. Training will be offered to the Technical-Administrative Coordination team in conflict
|
|
Philippines
|
Multifocal Area
|
2002
|
44,588.00
|
Phase 2
|
Project Number: PHI/29/02 GEF-RNE |
Ten years passed since the pilot implementation of the Small Grants Programme in 1992, the UNDP GEF/RNE SGP is organizing its first ever Stakeholders' National Conference last December 03-05, 2002 to build on the gains of the programme through its ( ... )
rs of existence from the pilot phase in 1992-1995 to its operational phase in 1996-1998, all the way to its second operational phase from 1999 to the present.
One of the ways or means being considered to build on those gains is by creating a network of past and current SGP grantees and partners that would institutionalize the partnerships forged among them through the years. Among other
|
|
Philippines
|
Biodiversity
|
2002
|
48,982.00
|
Phase 2
|
Project Number: PHI/16/02 GEF-RNE |
The proposed project is a biodiversity conservation undertaking through the promotion and institutionalization of ecotourism programs and projects and setting-up of an island-wide network that will serve as support mechanism for environmental ( ... )
vation and management.
The project intends to assist local stakeholders develop and institutionalize Sibuyan ecotourism programs and activities that will support and complement the existing tourism and visitor management strategies of NIPAP aimed at preserving and protecting biodiversity of the Island, particularly the Mt. Guiting-Guiting.
It will initiate and undertake activities that will
|
|
Philippines
|
Biodiversity
|
2002
|
42,497.00
|
Phase 2
|
Project Number: PHI/21/02 GEF-RNE |
The project will undertake a community-based conservation of coastal and marine resources of Siquijor including support system to enhance the living conditions of the coastal communities.
The biodiversity significance of the project sites has ( ... )
stablished by the resource assessment undertaken by the SCFHPI with the Siliman University.
The project will rehabilitate and protect the coastal and marine environment of Siquijor Island with its primary objectives:
1. Organize and strengthen fisherfolk communities in selected barangays;
2. Assess and evaluate the biological and ecological condition of their coastal and marine environment
|
|
Uganda
|
Multifocal Area
|
2002
|
32,700.00
|
Phase 2
|
Project Number: UGA/01/08 |
Sironko Valley is one of the major features of the Mt. Elgon ecosytem, with several systems draining the valley, in turn feeding into river Nile through lake Kyoga. The high population density has placed heavy demands on the land, resulting in ( ... )
station, de-vegetation, and soil erosion especially on the slopes. This has led to enormous land degradation. The project collaborates with IUCN Mt. Elgon Conservation and Development Project in relieving pressure on the natural forest ecosystem especially in the sub-counties of Bumasobo, Bumassifwa, and Bulago which directly boarder the Mt. Elgon National Park. The main activities involve
|
|
Dominican republic
|
Biodiversity
|
2002
|
20,556.00
|
Phase 2
|
Project Number: DOM/02/02 |
Recuperación de zonas agrícolas degradadas en la parte alta de la vertiente sur de la Sierra de Neyba que hace frontera con Haití, mediante la promoción de sistemas agroforestales y prácticas de conservación de suelos, como una alternativa de ( ... )
ción sostenible en zonas montanosas, unido al fortalecimiento de las organizaciones de base de la
|
|
Nepal
|
Climate Change Mitigation
|
2002
|
50,000.00
|
Phase 2
|
Project Number: NEP/02/04 |
This project has been initiated in 4 remote Village Development Committees (VDCs) of two accessible districts namely Palpa and Lamjung. The main objectives of this project is to install 450 Solar Home System (SHS) replacing the use of Kerosene and ( ... )
d. US$ 35,000 (70%) of the total fund is allocated as Community Environment Trust Fund (CETF) ? a revolving fund to avail loan for the community people.
Of the four VDCs, Siluwa and Gandakot lie in Palpa district where as remaining two VDCs namely Neta and Dhuseni lie in Lamjung district of Western Development Region of Nepal. According to the District Profile, PDDP, 2000, the total number of
|
|
Poland
|
Climate Change Mitigation
|
2002
|
20,968.00
|
Phase 2
|
Project Number: POL/01/35 |
Creating model example of usage of renewable energy sources in rural environment. Encouraging local authorities and people to solar collectors and fotovoltanic systems usage. |
|
Poland
|
Climate Change Mitigation
|
2002
|
1,000.00
|
Phase 2
|
Project Number: POL/02/7p |
pre-site visit to Lyszkowice allowed to reshape the initial idea for this huge challenge;solar heating system could be additional to the total change of remote heating system, consuming unnormous amount of coal,electricity.Project preparation will ( ... )
installation of 2 small boilers for wood waste in order to replace very expensive immersion heaters.The whole technical project will be financed from savings during the heating season (September-April) .Succesful implementation ( preliminary feasibility study, technical design for installation of 2 boilers led to submission of full project POL/03/24.
|
|
Indonesia
|
Climate Change Mitigation
|
2002
|
15,125.00
|
Phase 2
|
Project Number: INDO/01/22 |
Project development Goal :
Dissemination on improved cook stove that are more efissient and healthier and gaining the local government supports
Project Objectives :
1. Dissemination and Application on improved cook stove on the community ( ... )
mproving information and Knowledge on an improved cook stove on the basic community on an effort to gain such support from the local government and the related government s Departement
Expected Output :
1. Spreaded the use of improved Cook stove and principles of more efficient and healthler through 50% minimum improved cook stove applicated on community from 600 families per village in
|
|
Kyrgyzstan
|
International Waters
|
2002
|
6,900.00
|
Phase 2
|
Project Number: KYR/SGP/OP2/Y4/CORE/2002/11 |
The main idea of the project is the reduction of water pollution in transboundary Isfana river basin. The main tools are: rehabilitation of a sewerage system, monitoring of ecosystem and notification, training of the local Tajik and Kyrgyz ( ... )
tion, , introduction of new system of the payment for maintenance of the sewerage
|
|
Thailand
|
Multifocal Area
|
2002
|
10,959.00
|
Phase 2
|
Project Number: THA/02/02 |
Following the advice and notification of grant allocation from the GEF/SGP Central Programme Management Team and the key action plan set forth in the Country Programme Strategy, the Thailand-GEF/SGP set to launch implementation of the year-4 ( ... )
ational phase two. The GEF/SGP information has been disseminated to target communities throughout the country. In addition, upon requests, the National Coordinator and some members of NSC travelled to meet and discuss face-to-face with groups of NGOs/CBOs who required further clarification.
From August 2001 to the June 2002, the programme has received 95 concept papers from target
|
|
Kenya
|
Multifocal Area
|
2002
|
9,600.00
|
Phase 2
|
Project Number: KEN-GEF-02-002 |
The GEF stakeholder workshop is held twice a year for participants drawn from the CBO and NGOs as part of capacity building in GEF/SGP thematic areas. The participants of the workshop were introduced by resource experts to the following thematic ( ... )
? Clarification of GEF/SGP focal areas (Biodiversity, Climate Change, International Waters and Land Degradation). An additional subject was Biodiversity related economic.
? Writing of proposals through practical exercise in working groups.
? Presenting the proposals to the plenary with following discussions.
? The GEF SGP Project monitoring was also discussed among the participants the
|
|
Kenya
|
Multifocal Area
|
2002
|
10,000.00
|
Phase 2
|
Project Number: KEN-GEF-02-011 |
The GEF stakeholder workshop is held twice a year for participants drawn from the CBO and NGOs as part of capacity building in GEF/SGP thematic areas. The participants of the workshop were introduced by resource experts to the following thematic ( ... )
? Clarification of GEF/SGP focal areas (Biodiversity, Climate Change, International Waters and Land Degradation). An additional subject was Biodiversity related economic.
? Writing of proposals through practical exercise in working groups.
? Presenting the proposals to the plenary with following discussions.
? The GEF SGP Project monitoring was also discussed among the participants the
|
|