There are 29,070 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Dominican republic
|
Chemicals
|
2019
|
18,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: DOM/SGP/OP6Y4/STAR/CH/2018/19 |
Utlilizacion de energía limpia para la producción de cazabe que sirva como modelo de protección del medio ambiente |
|
Colombia
|
Biodiversity
|
2019
|
20,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: COL/SGP/OP6/Y4/STAR/BD/2019/04 |
|
|
Colombia
|
CapDev
|
2019
|
33,201.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: COL/SGP/OP6/Y5/STAR/CD/2019/01 |
ASOPASFU pondrá a disposición todos sus asociados y otros promotores comunitarios externos a la asociación para brindar la asesoría y acompañamiento en temas como viverismo, recolección de semillas, apropiación comunitaria, fortalecimiento ( ... )
tivo, generación de acuerdos para restauración de humedales, rehabilitación hidráulica de caños, patios productivos, arroz criollo y con técnica AMTEC, sistemas silvopastoriles, entre otros.
Nuestra experiencia nos ha permitido ser más resilientes a los efectos del cambio climático y ser portavoces de las medidas de adaptación al cambio climático que se han ejecutado en el marco del
|
|
Colombia
|
Biodiversity
|
2019
|
19,464.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: COL/SGP/OP6/Y5/STAR/BD/2019/18 |
|
|
Colombia
|
Biodiversity
|
2019
|
20,000.00
|
Phase 5
|
Project Number: COL/SGP/OP5/Y9/STAR/BD/2019/02 |
|
|
Indonesia
|
Biodiversity
|
2019
|
35,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: INS/SGP/OP6/Y4/STAR/BD/19/052 |
Goal:
1) Results of the Study of Social Financial Governance: Study of the Development of Partner Terrace as a Social Financial Institution
2) Funding Application System Prototype
objectives (PROJECT SPECIAL PURPOSE)
Objective 1:
Mapping ( ... )
itra Partner Financing Needs
Activities:
1. Mapping Instrument Consignment
2. Survey
3. Data Processing
4. Consignment Analysis and Making Survey Reports
Objective 2:
Development of a Financing Application System
Activities:
Application Creation Package
Consignment of Application System Development
Objective 3
Pilot Project
Activities
1. Consignment of Making Application Testing
|
|
Georgia
|
Climate Change Mitigation
|
2019
|
21,270.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: GEO/SGP/OP6/Y4/STAR/CC/19/01 |
|
|
Kazakhstan
|
Climate Change Mitigation
|
2019
|
30,100.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: KAZ/SGP/OP6/Y2/STAR/CC/18/28 |
The project?s philosophy is to conduct a wide campaign to stimulate farmers in Almaty region to stop using gasoline and diesel generators (?shepherds?) and replace them with renewable energy sources (solar and solar-wind). The main principle of the ( ... )
resources formation is to ensure 50% equipment cost as contributions from
|
|
Djibouti
|
Biodiversity
|
2019
|
29,785.00
|
Phase 6
|
Project Number: DJI/SGP/OP6/Y2/CORE/BD/2019/11 |
Renforcement de la résilience de l'écosystème de la vallée d'Assamo
(Culture fourragères, maraîchères et pépinières) |
|
Cameroon
|
Biodiversity Climate Change Mitigation
|
2019
|
19,219.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: CMR/SGP/OP6/Y5/CORE/PWD/2019/02 |
Le Project vise le renforcement de capacité dans l?élevage du poisson de table (silure) pour contribuer à l?autonomisation des femmes et personnes handicapées notamment l?Association pour le Développement des Artisans Handicapés du Cameroun ( ... )
AM) résidant dans la commune d?arrondissement de Douala 4. Cette approche de la pisciculture à petite échelle qui renforce le concept de l?économie bleue considère les humains comme des agents capables de s'auto-organiser au sein de systèmes adaptatifs complexes - reliant les systèmes sociaux aux systèmes écologiques au sein de la société, et se reliant les uns aux autres par le biais
|
|
Colombia
|
Biodiversity
|
2019
|
20,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: COL/SGP/OP6/Y4/STAR/BD/2019/03 |
|
|
Turkiye
|
Biodiversity
|
2019
|
15,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: TUR/SGP/OP6/Y3/STAR/BD/19/03 |
Ayval?k Adalar? Nature Park consists of a total of 17,950 Hectares of land, including 19 islands. 78% or 13.969 hectares of the park is the sea/marine area. Despite the establishment of the fact that the marine biodiversity in the area is extremely ( ... )
hrough scientific research, no management plan of nature park has been implemented and in fact heavy use of the area continues. The most important factor in the continuation of marine biodiversity in the Mediterranean and in the Aegean is the sea meadows, in particular Posidonia oceanica. The sea meadows, in addition to their ecological value, are very important in ecosystem services. The
|
|
Papua new guinea
|
Land Degradation
|
2019
|
37,421.38
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: PNG/SGP/OP6/Y5/STAR/LDSFM/19/01 |
This project is seeking to scope out and establish an eco-tourism initiative that will undertake a marine conservation program and awareness on the Nissan island Attol covering more then 80% of the islands population. It is one of attols suffering ( ... )
mpacts from climate change and this project will be seeking to conduct awareness on climate change and promoting and implementing biodiversity
|
|
Afghanistan
|
Biodiversity
|
2019
|
28,000.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: AFG/SGP/OP6/Y5/STAR/BD/2019/39 |
This project is focused on conservation of Band-e-Amir, Afghanistan's first national park. The Band-e-Amir National Park (BANP) is among sites in Bamyan visited by national and international tourists in the summer months when the weather is warm. ( ... )
the big issues in BANP is unavailability of proper latrines and waste collection points. The number of latrines are few to provide ease for tourists to avoid open defection in the site. To address the above, the project will construct around 10 eco-friendly latrines and raise the awareness of the communities and tourist. This project will also document the best practices of GEF SGP in
|
|
Solomon islands
|
Land Degradation
|
2019
|
100,000.00
|
Phase 5
|
Project Number: SLB/SGP/OP5/Y7/STAR/LD/2019/02 |
The Barana upland forests and catchments are well-known tourism site but this has been going on without much coordination and any support from the government. Activities undertaken within the sites includes; bird watching, forest trekking, Mataniko ( ... )
trekking, vintage view visits and river kayaking for Lunga and Mataniko Rivers.
All these activities have been going on without any coordination with the community. The recent designation of some parts of the upper Lunga and Mataniko Rivers as the Barana Community Nature Park by the Secretariat of the Pacific Regional Environment Programme (SPREP) Pacific Ecosystem-Based Adaptation to Climate
|
|
Turkiye
|
Biodiversity
|
2019
|
5,000.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: TUR/SGP/OP6/Y3/STAR/BD/19/42/W |
|
|
Ukraine
|
CapDev
|
2019
|
5,000.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: UKR/SGP/OP6/Y5/STAR/CPS/2019/49 |
The main goal of the project is to provide expertize and support in updating baseline assessment as well as ensure multi-stakeholder consultation process for the GEF OP 7 Country Programme Strategy (CPS) development. The project is responsible for ( ... )
zation of public consultations on target landscape covering all interested stakeholders, namely CSOs, scientists, local authorities, private sector, etc. As a result, the project will carry on a landscape baseline assessment and provide cumulative proposals for the CPS update.
|
|
Nepal
|
Biodiversity
|
2019
|
44,845.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: NEP/SGP/OP6/Y5/STAR/BD/2019/11 |
|
|
Malaysia
|
Biodiversity
|
2019
|
48,000.00
|
OP6 - Y5 (Jul 19-Jun 20)
|
Project Number: MAL/SGP/OP6/Y5/STAR/BD/2019/04 |
Problem Statement:
Artificial lighting along the Padang Kemunting beach is having a detrimental impact on sea turtles by deterring female turtles from nesting; confusing hatchlings to orient landward instead of navigating seaward; and causing ( ... )
ings to linger near artificial lights and face death from dehydration, predation and exposure to the sun.
Rationale/Justification:
Through community engagement and local government support a new Light Management Plan will be developed that mitigates the detrimental impact of artificial lighting on sea turtles. This will minimize beach lighting, reduce wattage, change the direction of lighting
|
|
Uganda
|
Land Degradation
|
2019
|
30,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: UGA/SGP/OP6/Y4/STAR/LD/2019/10 |
To combat land degradation by restoring the degraded land, improved productivity of farmland using sustainable land management practices to increase soil fertility, reduce soil erosion and diversify sources of household incomes in Bunyaruguru ( ... )
, Rubirizi
|
|