There are 29,070 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
China
|
Biodiversity
|
2023
|
50,000.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: CPR/SGP/OP7/Y3/STAR/BD/2022/08 |
? Baseline
Yangping Township is located in the north of Yongsheng County, with 10,000 hectares of woodland and grassland (6,000 hectares of woodland and 4,000 hectares of grassland). The average altitude is over 2,600 meters, the terrain is high in ( ... )
theast and low in the southwest, and there are high mountains (Talpo Ren Peak 3,593.5 meters above sea level), river valleys (Shangyangping River, Yangliu River, Banboqing River, Qingshui River) and Pinghu Lake (Yangping Reservoir) in the territory. The huge altitude difference and three-dimensional climate have bred biological diversity. There are rich biological resources in the territory. The
|
|
China
|
Climate Change Mitigation
|
2023
|
50,000.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: CPR/SGP/OP7/Y3/STAR/CC/2023/04 |
Baseline Information:
Under the global pressures of energy and climate change, achieving "carbon peak" and "carbon neutrality" has become a shared goal. The messages from the 2021 two sessions indicate that the next five years will see a ( ... )
icant focus on energy efficiency and carbon emission reduction. Central air conditioning systems, which account for 50%-60% of energy consumption in public buildings, have emerged as a key factor in achieving these goals. The HVAC sector, being a significant energy consumer, needs to adapt by using advanced R&D, installation, and control technologies to achieve efficient and eco-friendly
|
|
China
|
Chemicals
|
2023
|
41,147.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: CPR/VF/CH/2023/05 |
Description:
The Fengtai Centre is very representative of the business communities in Dongcheng District. As a comprehensive business community, it is the most common and largest type of business community, and most of the other types of business ( ... )
ities are variations of it. At the same time, the Fengtai Centre has about 25 institutions in the building, including enterprises and public institutions, private enterprises and social organizations, and the institutions cover a wide range of work areas, such as finance, commerce, consulting, education and training, communication, food, health, and elderly care, etc. Some of the institutions
|
|
China
|
Chemicals
|
2023
|
41,147.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: CPR/VF/CH/2023/02 |
Description: The Tianbao and Shicun areas of Guyijing Community are typical urban villages, with 123 registered households and a registered population of 550. The permanent population is 1,297 and the migrant population is about 900. Since this area ( ... )
ted on one side of the ring road and is crossed by high-voltage lines, it is designated as landscape land in urban planning. The villagers have been looking forward to being demolished before, but there are no demolition plans in the near or long term. The local villagers are very dissatisfied. At present, most of the villagers' houses are rented out to migrant workers. At present, the entire
|
|
Nigeria
|
Chemicals
|
2023
|
100,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: NGA/SGP/OP6/Y4/CORE/CH/22/51 |
This project is targeted at reducing the plastic wastes that litter neighbourhoods, clog drainages (resulting in flooding), and mount up refuse dumpsites in such a way that they have become perennial environmental challenges. It all starts with the ( ... )
ctive use of plastics which quickly become plastic wastes that are the ultimate environmental challenges. The population of about 3.5 million people in the FCT are affected and the 3/4 metric tons per day of plastic wastes in the Territory must be reduced through this project. 100 teams of 4 youths in each team will be engaged to generate the ideas, tools and methods that will be presented to the
|
|
Congo, dem. republic
|
International Waters
|
2023
|
30,000.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: DRC/SGP/OP7/Y3/STAR/WI/2023/15 |
Tout en contribuant à réduire la pollution plastique des milieux aquatiques dans la ville de Matadi, ce projet incitera les institutions urbaines et les communautés riveraines à prendre des mesures afin de réduire les rejets de déchets dans ( ... )
vières. À terme, le projet contribuera à améliorer durablement la qualité de l?eau, qui sert à multiple usages aux populations et favoriser la restauration de la biodiversité marine de ces trois rivières et de celle du fleuve Congo.
|
|
Botswana
|
Biodiversity Climate Change Mitigation
|
2023
|
32,103.78
|
OP7 Y3 (July 22-June 23)
|
Project Number: BOT/SGP/OP7/Y2/CORE/BD/2022/19 |
Nata Conservation Trust (NCT) manages a very important wetland in Makgadikgadi wetland system. This area is famous globally as it is a breeding ground for threatened flamingo species. Apart from such, the sanctuary is home to over three hundred ( ... )
bird species. Department of wildlife conservation has also introduced other animal species such as zebras, wild beasts, ostriches, jackals, to be conserved in the area. The wetland is seasonal and sometimes dries up completely leaving animals? species within the sanctuary with no water. To mitigate on such adverse occurrences, NCT drilled a borehole and created water points, unfortunately the
|
|
Argentina
|
Biodiversity
|
2023
|
18,868.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: ARG/SGP/OP7/Y3/STAR/BD/2023/43 |
the objective of the project is to improve mechanisms for finishing and marketing goat production, mostly in the hands of women, to generate higher income, increase food quality and facilitate care tasks. |
|
Timor-Leste
|
Land Degradation
|
2023
|
27,500.00
|
OP7 Y6 (July 25-June 26)
|
Project Number: TLS/SGP/OP7/Y4/CORE/LD/2023/20 |
This project implemented to establish agroforestry training center for the farmer around the location |
|
Saint Kitts and Nevis
|
International Waters
|
2023
|
4,982.00
|
OP6 Y8 (July 22-June 23)
|
Project Number: STK/SGP/OP6/STAR/23/01 |
Waste that is currently being discarded can be collected and transformed into a useful product to create a new circular economy initiative in St. Kitts and Nevis. The aim of this project is to use waste material sourced locally to produce fish ( ... )
izer in St. Kitts and Nevis. The liquid organic fertilizer will be bottled in recycled single use plastic bottles of varying sizes and sold to farmers at an affordable price. This will prevent the need to purchase new bottles for storing the fertilizer and it will also reduce the number of discarded single use plastics that end up in the ocean. Farmers will be encouraged to recycle their bottles
|
|
Viet nam
|
Biodiversity
|
2023
|
0.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: VNM/UNDP/2022/05 |
The project is aimed at contributing to preserving and promoting the values of natural resources, culture, indigenous knowledge and developing community-based tourism towards eco-tourism and green tourism in CLC-HA Biosphere Reserve.
Short-term ( ... )
ives are presented below:
Objective 1: Promote awareness, capacity, and the utilization of internal resources as well as mobilize community participation in nature conservation through integrated management of natural resources, culture, indigenous knowledge, environment and the harmony between conservation and development at Cu Lao Cham - Hoi An World Biosphere Reserve
Objective 2: Develop
|
|
Nepal
|
Chemicals
|
2023
|
150,000.00
|
OP6 Y8 (July 22-June 23)
|
Project Number: NEP /SGP/OP6/Y8/CORE/PLA/2023/01 |
This project aims to support the development of a policy regarding single-use, non-recyclable, and end-of-life plastic waste by conducting awareness-raising workshops and cleanup campaigns through community participation Pokhara Metropolitan City, ( ... )
o. 12. Conducting Clean up campaigns and awareness programs for 3R practices & behavior change. This whole project will be a stepping step to scale up the scaling of plastic road and plastic brick technology which were already piloted by Green Road Waste Management before. Also, setting up a state-of-the-art demonstration site at the space provided by the local government showcase different ways
|
|
Antigua and Barbuda
|
Land Degradation
|
2023
|
50,000.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: ATG/SGP/OP7/Y3/CORE/LD/2022/06 |
|
|
Viet nam
|
Biodiversity
|
2023
|
0.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: VNM/UNDP/2022/06 |
The project is aimed at developing and replicating the effective and sustainable livelihoods from models of grass growing in combination with raising cows and goats to improve income for the community and contribute to the protection of Dong Nai ( ... )
Biosphere
|
|
Nigeria
|
Biodiversity
|
2023
|
45,000.00
|
OP6 -Y4 (Jul 18 - Jun 19)
|
Project Number: NGA/SGP/OP6/Y4/CORE/BD/22/53 |
Panacea for Development & Infrastructural Challenges for Africa Initiative (PADIC-AFRICA) was formally known and registered with the Cross River State government in 1999 as Development Concern (DEVCON), in 2017 registered with Cooperate Affairs ( ... )
sion of Nigeria as Panacea for Development & Infrastructural Challenges for Africa Initiative, with the Reg. No CAC/IT/No/10161. PADIC-AFRICA is focused on sustainable community natural resource management and livelihood, adapting participatory approach. We have our presence in over 20 communities in Cross River State implementing community driven projects. Our objectives are to build communities
|
|
Malaysia
|
Biodiversity
|
2023
|
150,000.00
|
OP7 - Y1 (Jul 20-Jun 21)
|
Project Number: MAL/SGP/OP1/Y1/STAR/BD/2022/01 |
This project through participatory action for adaptive management of natural resources and ecosystem processes for sustainable development will overcome the organizational, technical, and financial management weaknesses of the local communities ( ... )
and working in the target CRBR rural landscapes so that they can act strategically and collectively in building social and ecological resilience. It will be focusing on a strategy that is inclusive with inputs from all stakeholders and taking a bottom-up approach through the building of local communities? capacity to plan and implement activities based on their own self-determination and
|
|
Malaysia
|
Biodiversity
|
2023
|
150,000.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: MAL/SGP/OP7/Y1/STAR/BD/2022/01 |
This project through participatory action for adaptive management of natural resources and ecosystem processes for sustainable development will overcome the organizational, technical, and financial management weaknesses of the local communities ( ... )
and working in the target CRBR rural
landscapes so that they can act strategically and collectively in building social and
ecological resilience. It will be focusing on a strategy that is inclusive with inputs from all
stakeholders and taking a bottom-up approach through the building of local communities?
capacity to plan and implement activities based on their own self-determination
|
|
Indonesia
|
Biodiversity
|
2023
|
24,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y1/STAR/BD/23/015 |
|
|
Indonesia
|
Biodiversity
|
2023
|
20,000.00
|
OP7 Y4 (July 23-June 24)
|
Project Number: INS/SGP/OP7/Y1/STAR/BD/23/039 |
|
|
Belarus
|
Climate Change Mitigation
|
2023
|
18,055.00
|
OP7 Y3 (July 22-June 23)
|
Project Number: BLR/SGP/OP7/Y3/CORE/CC/23/01 |
Project goal:
to increase the accessibility of all segments of the population to the city's cycling infrastructure and reduce the population's expenses for simple bicycle repairs, thereby motivating the city's population to switch to a bicycle ( ... )
ore.
Project tasks:
Procurement and installation of equipment (street bicycle self-repair station and indoor bicycle parking) at 3 sites. Dissemination of information about the results of the project among 21 districts of the Mogilev region. Involving the city's population in the development and implementation of environmental initiatives in the Cherikov district, using promotion tools
|
|