The Installation of Grey Water Filtering System, Rain Water Harvesting and Storage at Her Majesty?s Prisons
*Note: Originally GRD/SGP/OP6/Y5/CORE/CC/19/12
The Installation of Grey Water Filtering System, Rain Water Harvesting and Storage at Her Majesty?s Prisons
The list of objectives to be achieved under this project;
1. Construction of (2) concrete holding areas: 10' x 8' x 6' and 15' x 10' x 8'; and one (1) filtering system 15' x 10' x 8' .
2. Construction of a 100,000 gal capacity dam for collecting water runoff from Richmond Hill .
3. Installation of twenty (20) 1000 gal water tanks to be to be used for storage of filtered water.
4. Provision of stored water for irrigation while reducing the reliance on NAWASA?s treated water by .
The list of objectives to be achieved under this project;
1. Construction of (2) concrete holding areas: 10' x 8' x 6' and 15' x 10' x 8'; and one (1) filtering system 15' x 10' x 8' .
2. Construction of a 100,000 gal capacity dam for collecting water runoff from Richmond Hill .
3. Installation of twenty (20) 1000 gal water tanks to be to be used for storage of filtered water.
4. Provision of stored water for irrigation while reducing the reliance on NAWASA?s treated water by .
Project Snapshot
Grantee:
ADULT AND TEEN CHALLENGE GRENADA INC
Country:
Grenada
Area Of Work:
Climate Change Mitigation
Grant Amount:
US$ 83,704.00
Co-Financing Cash:
Co-Financing in-Kind:
Project Number:
GRD/SGP/OP5/CORE/CC/19/12 - recoded
Status:
Satisfactorily Completed