Project Results
? Pre proposal Meeting and Meeting after signing of agreement, DDAO conducted and hold several coordination meetings in discussion session with the NEPA and Forest and Natural Resource Directorate Ministry of Agriculture and related stakeholders Community CDCs, for the orientation of the purposed projects and exchange the ideas with the related mentioned parties
? Select and oriented two CDCs in the target villages for advice, better implementation and future conservation and sustainability of the project
? Work with two CDCs for the developing and prioritize the needs in the respective Village NRM plans completed, and also Discussed with the NEPA & related stakeholders
? Two days training organized to CDCs on the Project Review and Reflection Process (PPRP)
? Chose Different Species of tree and planted about 8000 saplings of tree including wild and fruit trees in the purpose and selected project site around the Durankhail Agriculture dam based on NRM village plan
? Also replantation program in the last plantation season of the year 2023 with the wide participation of community local official DDAO staff in this plantation season planed 2700 different variety and Species of trees
? DDAO completed soil studies and texture of Soil
DDAO Design Afforestation Area for the garden and dense native forest based of village NRM plan
? Installation of New submersible water pump with proper efficiency.
? Extension of irrigation and solar system to the planted trees area completed and the exist irrigation system maintenance and repaired
? Installation of extra solar panel, the existed solar system was not sufficient for the designated area therefore DDA install new additional proper system, it should have remembered that during of last changes and insecurity situation a number of solar panel lost, we repurchased and installed again.
? The footpath developed and completed in the project area based on prepared plan and map,
? Work on water source and related completed component
? During the NRM, coordination meting and training the local council purposed to DDA construct hillside diches around the dam for the prevention of dam and DDA completed 4700m hillside diches around to control the soil erosion and soak the surface water to the ground.
? More than 500 meters long fence established around the plants
? Small plat of nursery established in the village
? Construction of irrigation water reservoir with the capacity of 50 cubic meter Constructed on the top of hill for storing of water during the day through solar system pump.
? The awareness training meeting and monthly PRRP meetings with two CDCs on the activities? implementation, budget utilization, quality assurance, and next month plan and monitoring modalities and capacity building of community and local council held and completed.