|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Samoa
|
Chemicals
|
2005
|
1,533.00
|
Phase 3
|
Project Number: WSM/OP3/01/05/03 |
Magiagi Village currently hosts one of he largest reservoirs that supply the water throughout the majority of the Apia area. It also hosts the Fale-o le-Fee, which is one of EPC's major power control/supply hub. Based in the valley of Magiagi, these ( ... )
rgy and water sources to a large number of people is being threatened by the unecessary dumping of rubbish and the unsustainable way of living currently practiced by the village.
The aim of project is to improve community capacity for environmental management and sustainable development
Main objective: To reduce land-based pollutants and minimize waste production within the
|
|
Samoa
|
Chemicals
|
2005
|
19,157.09
|
Phase 3
|
Project Number: WSM/OP3/01/05/43 |
Magiagi village is located within the town area Apia. The problem within this community is the unnecessary dumping of waste which has affected energy and water source areas based in the village. Half of the village resides above the valley, and most ( ... )
lds treat the valley as their dumping ground. Given the proximity of the valley to the reservoir and Fale-o-le-Fe'e, the dumping ground is having an adverse effect on its surrounding environment. Specific problems are;
Watershed areas are being threatened by pollution from rubbish dumping and through organic pollutants
Lack of understanding and awareness of environmental issues especially in
|
|
Mexico
|
Biodiversity
|
2005
|
19,716.65
|
Phase 2
|
Project Number: MEX/UNF/04/18 |
Edición e impresión de una guía bilingüe (español-maya) sobre anfibios y reptiles de la región de la Biosfera Sian Ka?an, así como la difusión del libro en esta región. |
|
Indonesia
|
Climate Change Mitigation Climate Change Mitigation
|
2005
|
43,358.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: INS/05/78 |
Project development Goal:
Ensuring sustainable people-based conservation of Gunung Lumut forest through utilization of micro-hydro electricity.
The workshop aims:
1. To assess and install microhydro electricity generator set and commissioning to ( ... )
munity to reduce dependency on diesel based generator.
2. To provide marketing and packaging training for non-timber forest products
3. To present the case to the head of the region to advocate the use of clean and affordable energy for community.
4. To set up environmental education for community to ensure care for forests and water debit.
Expected Results:
1. one (1) microhydro installed
|
|
Zimbabwe
|
Biodiversity
|
2005
|
40,000.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: ZIM/SGP/OP3/Y1/CORE/2005/02 |
BACKGROUND
Gutu Wetland protection project is located in ward 8 of Murewa District in Mashonaland East Province. Ward 8 has a total population 18 300 people and is considered the second poorest in the district with regards to poverty ( ... )
fication in terms of food supply. In Gutu village itself there are 61 households with a total population of 475 people. The wetland in Gutu village is strategically positioned as it provides the source of water from the Urah River.
OUTPUTS
1) One wetland that is 6 hectares in extent rehabiliated and protected by end of July in 2007 for the betterment of the biodiversity status and
|
|
Mongolia
|
Multifocal Area
|
2005
|
3,607.00
|
Phase 2
|
Project Number: MON/04/26 |
Although they live in the countryside, many community members do not recognize plant species. They need some educational reference materials to recognize rare and endangered species of plant. The grant is given to develop and publicize a Hand Manual ( ... )
ting useful, rare and endangered trees, bushes, fruits, medicinal herbs, etc for use by rural communities. The Manual is now in a hand written form and is being reviewed by
|
|
Turkiye
|
Climate Change Mitigation
|
2005
|
5,000.00
|
Phase 2
|
Project Number: TUR-04-09Pu |
The publication aims to create a general awareness on the issue of energy conservation and energy efficiency, providing simple but useful information to achieve these in our very homes. |
|
Jordan
|
Land Degradation
|
2005
|
28,200.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: JOR/05/14 |
In Al Ghuwairiyeh area in Zarqa, which suffers several environmental, social and socio-economic problems, the Soldier?s Families Welfare Society will implement the Herbal Plants Project. The project involves the establishment of a small herbal ( ... )
production unit over a piece of land close to the Society?s headquarter in Al Ghuwairiyeh, train women and provide them with job opportunities, promote planting of herbal plants in the community and establish a model for sustainable land management to other communities in the governorate. The National Center for Agricultural Research and Technology Transfer (NCARTT) will provide the technical
|
|
Mozambique
|
Biodiversity
|
2005
|
12,010.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: MOZ/SGP/OP3/Y1/CORE/2005/15 |
Impaputo area is facing serious problems of harvesting of its forest resources (leading to biodiversity loss, land degradation and to increase poverty levels), due to individual and private enterprises developments for tourism and agriculture, tree ( ... )
ng for charcoal and firewood production, extraction of medicinal and ornamental plants, harvest of building stones, and irregular bushfires caused by livestock and farming production. The project aims to control these inadequate land and resource use practices by introducing the components of livelihoods support trough diversified income generation activities, awareness rising on the conservation
|
|
Mozambique
|
Land Degradation
|
2005
|
14,250.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: MOZ/SGP/OP3/Y1/CORE/BD/2005/16 |
The project is based at ?Aldeia dos Antigos Combatentes?, in Boane district of Maputo province. It is a community of war veterans, illiterate marginalized groups with limited subsistence means and basic social services. The area is very rich in ( ... )
ersity and a high potential wildlife area. It is in the junction between Mozambique, Swaziland, and South Africa, within the Lebombo Mountains range that establishes a natural border between these countries. The area is crossed by various river systems with relevance to the Umbeluzi River that supplies the entire Maputo city.
The area faces accentuated deforestation, pollution of the Umbeluzi
|
|
El salvador
|
Multifocal Area
|
2005
|
25,000.00
|
Phase 2
|
Project Number: ELS04/98/G52/014 |
El presente proyecto tiene por objetivo fortalecer la incidencia nacional del Programa de Pequenas Donaciones divulgando y analizando experiencias locales ambientales que se articulen y potencien las agendas estratégicas de desarrollo del país, ( ... )
llo se identificará y sistematizará lecciones aprendidas de experiencias de gestión ambiental a nivel local que se articulen con agendas estratégicas territoriales y nacionales, se divulgaraa y promovera el análisis de experiencias sistematizadas entre actores claves del país, para aportar orientaciones y lineamientos para la incidencia nacional del Programa de Pequenas
|
|
Dominican republic
|
Climate Change Mitigation
|
2005
|
18,333.33
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: DOM/05/24 |
Reducción de la contaminación ambiental promoviendo el uso de energía renovable a través de sistemas fotovoltaicos en viviendas, escuelas y centros comunitarios en la comunidad de los Guayuyos, Padre Las Casas. |
|
Nicaragua
|
Land Degradation
|
2005
|
10,000.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: NIC/OP3/05/09 |
El proyecto se trata de implementar el modelo de pago por servicios ambientales, con la implementaciòn de instrumentos Jurídicos, plan de Transformaciones Tecnológicos, Implentacion del Fondo Ambiental y resolver conflictos entre oferentes y ( ... )
antes. El objetivo principal lograr la restauración del área de recargue de los principales acuíferos en 154.92 has, producción de agua y su abastecimiento para consumo humano a 45 viviendas de la comunidad de San Luis. Esta área es de interés nacional por encontrarse en la convergencia de 5 micro cuencas de 4 municipios.
Se quiere evitar el deterioro creciente del área de recargue del
|
|
Chile
|
Multifocal Area
|
2005
|
16,129.03
|
Phase 2
|
Project Number: CHI/04/24 |
Implementación de una ruta de uso pedestre y pecuario, que no contempla el uso vehicular. Identificación de los senderos aledaños al tramo Sendero de Chile, con atractivos turísticos como Petroglífos, Pinturas Rupestres y rutas usadas por los ( ... )
|
|
Malaysia
|
Multifocal Area
|
2005
|
2,000.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: MAL/05/PG-01-31 |
Many commercial agriculture techniques and technology have contributed to BD loss and is unsustainable. With the pace of development accelerating in Orang asli areas, traditional agriculture practices with comparatively lower economic productivitty ( ... )
ving way to wholesale adoption of commercial agriculture practices. However poverty allevitiaon which is the main focus of our projects cannot be successful if it comes at the expense of the environment.
The goal is to develop and implement various sustainable agriculture and renewable energy technologies for its higher economic values in a way that is also adaptive with orang Asli traditional
|
|
Lithuania
|
International Waters
|
2005
|
10,510.00
|
OP3 - Y1 (Mar 05 - Feb 06)
|
Project Number: LIT/05/12 |
Project is granted under Special Projects Competition on Environmental Education.
The implementation of the EU Water Framework Directive is lagging behind as stakeholders of various levels lack knowledge and information on the hazardous ( ... )
nces used in the processes, chemical products, and emissions of these substances to the water environment. There is no practical and easy understandable information about priority hazardous substances, their impact to environment and human health, how to identify these hazards, and what are potentials for substitution of these materials. Moreover, state authorities lack information about
|
|
Suriname
|
Climate Change Mitigation
|
2005
|
2,000.00
|
Phase 3
|
Project Number: SUR/05/01 |
This project has been implemented with the main objective to collect technical data with regards to the project location and possibilities to implement micro hydro power (mph) technology at the village of New Aurora at the upper Suriname river area. |
|
Jordan
|
Land Degradation
|
2005
|
40,200.00
|
Phase 2
|
Project Number: JOR/04/10 |
The project is one of a cluster of three projects to be implemeted in the north of Jordan with the aim to contribute to controlling land degradation and soil erosion, improving productivity of agricultural land and preserving environmental ( ... )
ces. The project activities include the introduction of soil conservation measures, water harvesting, using effective drip irrigation techniques, bee keeping, medicinal herb planting and processing, installation of solar cells for water heating and improvement of sanitary situation in the concerned villages. It is hoped that these projects would constitute models that encourage neighboring
|
|
Jordan
|
Land Degradation
|
2005
|
38,300.00
|
Phase 2
|
Project Number: JOR/04/09 |
The project will be implemented as part of a cluster of three projects in the north of Jordan, two in Irbid and one in Ajloun governorate with the aim to contribute to controlling land degradation and soil erosion, improving productivity of ( ... )
ltural land and preserving environmental resources. The project activities include the introduction of soil conservation measures, water harvesting, using effective drip irrigation techniques, bee keeping, medicinal herb planting and processing, installation of solar cells for water heating and improvement of sanitary situation in the concerned villages. It is hoped that these projects would
|
|
Jordan
|
Land Degradation
|
2005
|
42,200.00
|
Phase 2
|
Project Number: JOR/04/11 |
The project will be implemented as part of a cluster of three projects in the north of the country with the aim to contribute to controlling land degradation and soil erosion, improving productivity of agricultural land and preserving environmental ( ... )
ces. The project activities include the introduction of soil conservation measures, water harvesting, using effective drip irrigation techniques, bee keeping, medicinal herb planting and processing, installation of solar cells for water heating and improvement of sanitary situation in the concerned villages. It is hoped that these projects would constitute models that encourage neighboring
|
|