There are 27,190 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Sri lanka
|
Climate Change Mitigation
|
2000
|
7,497.00
|
Phase 2
|
Project Number: SRL/98/G52/009 |
Pilot project on the Introduction of Paddy Husk as an Alternative to Firewood for the Operation of Bakeries within Polonnaruwa District, creating awareness among bakery owners on disadvantaves of using firewood to operate bakeries and providing ( ... )
cal and financial support to convert firewood using bakeries to operate on paddy
|
|
Kazakhstan
|
International Waters
|
2000
|
12,760.00
|
Phase 2
|
Project Number: KAZ/00/20 |
The Irtysh river pollution starts in China and takes place for the entire space of the river. As a region where the river flows by is rich with natural resources, a lot of industrial facilities are existed in the river basin. The factories burials ( ... )
he river leads to death of flora and fauna of the region. Besides, industrial pollution is a serious danger for drinking water sources of the whole river basin.
Since January 1999 state bodies had to stop environment control over the situation in the region due to lack of financial resources. As a result, plant facilities? wastes burials into the river beyond control. Nobody is aware about
|
|
Zimbabwe
|
CapDev
|
2000
|
1,132.37
|
Phase 1
|
Project Number: ZIM/92/G52/032 |
NATURE OF THE ORGANIZATION
Dr ZA Chiteka is the project coordinator and is an individual with capacityt and ability to produce such a magazine through previous similar projects.
HISTORY, GOVERNANCE AND FUNDING OF THE ORGANIZATION
Dr Chiteka ( ... )
history of operating as an independent Consultant and coordinator of various projects of differing magnitudes, some of which have been regional and international in nature.
CAPACITY OF THE ORGANIZATION TO CARRY OUT THE PROPOSED ACTIVITY AND PREVIOUS RLEVANT EXPIRIENCE:
The proponent has a wide expirience in the production of various newsletters, research paper editing plus a very wide
|
|
Mali
|
Multifocal Area
|
2000
|
954.00
|
Phase 2
|
Project Number: MLI/00/14 |
Information des ONG partenaires sur les axes prioritaires de la stratégie nationale de diversité biologique et du changment climatique
La tenue de cette journée d?informations et d?échanges a pour but de contribuer a l?amélioration de la ( ... )
é des projets soumis au
|
|
Kenya
|
Biodiversity
|
2000
|
2,000.00
|
Phase 2
|
Project Number: KEN-GEF-PLN-99-003 |
To organize two grassroot communities living around Kakamega forest in readiness for an ecotourism project due to start in January |
|
Nepal
|
Biodiversity
|
2000
|
48,000.00
|
Phase 2
|
Project Number: NEP/98/G52/06 |
Kakrebihar as the name suggests (in Nepali) looks like a cucumber shaped structure and covers an area of 167 hectares of forested land consisted of Sal (Shorea robusta) and Pine (Pinus roxburghii) as the major species. Aside from the plants and ( ... )
biodiversity, this area has an archaeological and cultural significance. The successful implementation of the project will ensure conservation of the historically important archaeological heritage, the culture of the ethnic Tharus, and its environment and the biodiversity. The project will also support the local communities' endeavour in the conservation of the fast depleting deer population in
|
|
Pakistan
|
Biodiversity
|
2000
|
12,700.00
|
Phase 2
|
Project Number: PAK/00/15 |
The forests around Khura Village in Soon Valley were under tremendous threat for collection of fuel wood especially the key species of the area, Kahu (Wild Olive) and Phulai (Acacia). The forest was not only being plundered by the residents of Khura ( ... )
o by residents of surrounding villages. Both these species being slow growing could not establish themselves against the pressure for firewood whose impact was multiplied because of heavy grazing pressure. This was the time when the village elders sat together and decided to take some actions to protect their forest. As a first step they thought that they adopt these trees and Baba Ji, the eldest
|
|
Papua new guinea
|
Biodiversity
|
2000
|
18,248.00
|
Phase 2
|
Project Number: PNG/00/03 |
Th project aims to raise awareness of the Kimbe Marine Environment by producing and deseminating awareness materials on Coral reefs and life in the sea.
The project mobilised local schools and carried out marine environmental awareness at ( ... )
ed sites. Local villages in the awareness programmes had puppets shows with marine conservation messages, booklets and pamphlets and other promotion materials. This approach strengthen the conservation message on marine biodiversity in schools and villages that were visited. The proponent saw that these approaches to build the capacity of the local people had effective impact. Alot of the
|
|
Uganda
|
Biodiversity
|
2000
|
2,000.00
|
Phase 2
|
Project Number: UGA/98/G52/014 |
Kitanga Wetlands (formerly 859 hectares now 496 hectares) constitute one of the most extensive continuous water catchment areas in Kabale District. The wetlands are under threat from population pressure, drainage/reclamation activities, seasonal ( ... )
and wildlife hunting. The goal of the project is to promote regeneration and conservation of Kitanga Wetlands while providing alternative sources of livelihood for farmer groups. Activities under this grant involve information collection and participatory workshops to plan the project and review the
|
|
Tanzania
|
Climate Change Mitigation
|
2000
|
30,263.00
|
Phase 2
|
Project Number: TAN/00/02 |
Kwimba is one of the driest districts in Tanzania. The acute drought conditions coupled with excessive stock of cattle have put Kwimba among districts in Tanzania with severe land degradation. The primary objective is to promote and popularize the ( ... )
biogas technology as an alternative source of energy to fuel wood by establishing demo units. Also to reverse the trend of environment degradation by encouraging wide adoption of biogas cookers which in turn would reduce household demand for
|
|
Dominican republic
|
Biodiversity
|
2000
|
12,500.00
|
Phase 2
|
Project Number: DOM/00/23 |
Este proyecto busca, a partir de la crianza de abejas, contribuir con la recuperación natural de la vegetación, generar ingresos y mejorar las condiciones de vida de la población. De este modo, se espera promover la concientización pública y ( ... )
establecer una relación armoniosa entre las comunidades (Isabel de Torres, provincia de Montecristi) y el bosque
|
|
Belize
|
Biodiversity
|
2000
|
38,990.00
|
Phase 2
|
Project Number: BZE/00/02 |
Laughing Bird Caye National Park is utilized for activities such as tourism, recreation and research. The lack of a management system has led to abuse and exploitation of this protected area. This comes in the form of illegal use of the marine ( ... )
n of the National Park by fishermen, the uncontrolled use of the small island by numerous vessels/guides, and the indiscriminate disposal of garbage/solid waste by visitors.
This project?s main goal is to establish a proper management system for the entire National Park. The primary objective includes protecting the natural resources for Belize, specifically for buffer communities. These
|
|
Thailand
|
International Waters
|
2000
|
11,530.00
|
Phase 2
|
Project Number: THA/00/G30 |
The Banthad Range is the prime watershed area of more than 10 tributaries of the Songkhla Lagoon, an ecological part of the Gulf of Thailand. The decreasing capacity of the watershed area due to deforestation, the alteration of the water courses by ( ... )
rrigation project, the excessive chemical run-off from cultivated land , the untimely regulation of current between the lagoon and the gulf ,etc, have all contributed to the degrading situation of the ecosystems of the lagoon and the gulf. In coping with these threatening problems, the awareness of the communities , especially local educational institutes, are major factors that subsequently
|
|
Uganda
|
Multifocal Area
|
2000
|
39,000.00
|
Phase 1
|
Project Number: UGA/95/G52/007 |
The project is managed by Ntungamo Women?s Efforts to Save the Environment (NWESE), a local women CBO in SouthWestern part of Uganda. With the high population of livestock and man, the area has problems of soil & water Conservation, overgrazing, and ( ... )
tion of catchment areas as well as low-income levels. The project is concerned with environmental and land degradation with activities of environmental Conservation through control of soil erosion by planting lemon grass on terraces and contour bands to hold the soil and keep the hilltops green. Community awareness as well as income generation through the production and marketing of lemon grass
|
|
Indonesia
|
Biodiversity
|
2000
|
21,714.00
|
Phase 2
|
Project Number: GEF-INS/YBUL/OP2-2000-014 |
Project development goal:
Well developed community based nature resource management supported by Government policy
Project objectives:
1. To empower local community in managing the nature resources
2. To increase local community ( ... )
lity in utilizing the resources in a sustainable way
3. To induce the emergence of government policy which regard to community welfare, environmentally friendly and support the traditional wisdom in managing the nature resources
Anticipated result of project :
1. The emergence of 4 villages having capable community in managing nature resource in sustainable way
2. The increased
|
|
Indonesia
|
Biodiversity
|
2000
|
1,370.00
|
Phase 2
|
Project Number: GEF-INS/YBUL/OP2-2000-010 |
Project development goal:
Development of integrated approach in biodiveristy conservation in Rawa Danau, through community participation and involvement
Project objectives:
1. To compile analysis of the existing ecosystem management in ( ... )
administration, field, local community and regional level.
2. To develop partnership among stakeholders in economic activities which regard to biodiversity conservation
3. To enhance the emergence of common perception, support and agreement from stakeholders (government, universities, private sector, NGO, funding agencies) necessary to support the implementation of integrated biodiveristy
|
|
Tunisia
|
Biodiversity
|
2000
|
25,000.00
|
Phase 2
|
Project Number: TUN/00/05 |
Aims to valorize the local research and development results and involve Zamour population to contribute to biodiversity conservation
l?objectif général du projet est la valorisation du savoir faire local en matière de préservation des ( ... )
rces naturelles et l?implication de la population pour une meilleure utilisation des résultats des recherches appliquées à la lutte contre la désertification .
les objectifs spécifiques sont :
- la sauvegarde du savoir faire local en matière de préservation des ressources naturelles
- la valorisation des résultats des recherches appliquées à la lutte contre la
|
|
Thailand
|
International Waters
|
2000
|
7,312.00
|
Phase 2
|
Project Number: THA/00/G08 |
The project location is a portion of the Loei River watershed area, an adjacent to the ecological system of the Mekhong. Like many other communities in northeast Thailand, the majority of members earn their livings by farming. After 5 decades of ( ... )
uction of lucrative cash crop,some of which are of alien species, and adoption of chemical substance in farming practice, the river has become polluted. Too high concentration of the chemical residue were witnessed and confirmed. With the growing consuming society, the future is not promising but prone to more serious condition thus requires urgent address.
Capacity building through
|
|
Mali
|
Biodiversity
|
2000
|
23,186.00
|
Phase 2
|
Project Number: MLI/00/15 |
Lutte concertée pour la sauvegarde des ressources forestieres a tavers des activités de sensibilissation, d'information et de formation |
|
Ecuador
|
Biodiversity
|
2000
|
50,000.00
|
Phase 2
|
Project Number: ECU/00/004 |
El objetivo del proyecto es contribuir al desarrollo e implementación de alternativas de manejo sostenible de los recursos naturales de la Zona Especial de Manejo Puerto Cayo - Ayampe.
Los componentes y actividades son:
Recopilación de datos ( ... )
tes sobre estudios biológicos e inventarios zonales del área marina
Instalación de área piloto de manejo de las especies de arrecifes rocosos.
Ejecución de talleres de capacitación sobre manejo del área marina.
Elaboración participativa de regulaciones para el manejo del área marina.
Realización de días de campo para la construcción de NRV (actividad
|
|